An IT Architect is using the VxRail Sizing Tool. The architect started a new project, provided the project type, and selected the solution type.
What is the next step that the architect needs to undertake to proceed with the process?
A customer is planning to expand an existing VxRail vSAN cluster. Their current rack is full, so the cluster has to expand to an additional rack. Due to networking requirements, each rack is a Layer 2 boundary, so the new nodes require new management, vSAN, and vMotion subnets.
When designing the solution, what are two considerations that the architect should consider? (Choose two.)
The VxRail Cluster Configuration Report includes which three parameters that are required to perform the deployment? (Choose three.)
What are two reasons to provide minimum ceiling clearance above a VxRail rack? (Choose two.)
Which data source provides virtualization, storage and network metrics that can be imported into the VxRail Sizing tool?
Which protocol must be configured on the ToR switch to allow automated discovery of a VxRail node?
Which application package is by default included when using the VxRail Sizer Tool?
Which VxRail Dynamic Node configuration supports a VxRail-managed vCenter on the local cluster?