Questions 4

A VxBlock 1000 is running VMware vSphere 6.7. To support an audit, a customer engineer is trying to map the networking components in the VxBlock to a traditional datacenter

architecture.

Which component should the engineer map to the access switch?

Options:

A.

VMware virtual distributed switch

B.

Fabric Interconnect

C.

Nexus 1000V switch

D.

Nexus 9306PX switch

Buy Now
Questions 5

Which document contains all software baseline information post-RCM upgrade?

Options:

A.

LCS

B.

MSP

C.

SCR

D.

Assessment Workbook

Buy Now
Questions 6

Which base feature of Isilon OneFS is enabled during the CPSD Logical Build process?

Options:

A.

SynclQ

B.

SMARTDEDUP

C.

SMARTCONNECT

D.

SnapshotIQ

Buy Now
Questions 7

Where is customer feedback captured during the Lessons Learned phase of the project closure?

Options:

A.

Project Feedback Form

B.

Project Workbook

C.

Configuration Reference Guide

D.

Customer Satisfaction Survey

Buy Now
Questions 8

Based on CPSD guidelines for VxBlock 1000, how many UCS chassis can be installed in a single rack?

Options:

A.

5

B.

4

C.

6

D.

7

Buy Now
Questions 9

A customer is using Cisco UCS 6332-16UP 40-Port Fl. They have 16 ports dedicated for FC traffic. The customer needs to increase the number of FC ports.

What is a consideration?

Options:

A.

Unused server ports can be converted to FC ports

B.

Maximum number of supported FC ports is 32

C.

Unused FCoE ports can be converted to FC ports

D.

Maximum number of supported FC ports is 16

Buy Now
Questions 10

Which document provides a high-level overview of what is being delivered?

Options:

A.

Bill of Materials

B.

Logical Configuration Survey

C.

Solution Abstract

D.

Site Survey

Buy Now
Questions 11

A System Engineer is working on an implementation of the VxBlock 1000. What is a required task in the final implementation step during the Deployment Phase?

Options:

A.

Verify system physical configuration against LCS

B.

Execute the agreed-upon test plan

C.

Configure Cisco Smart Call Home

D.

Connect to individual Element Managers

Buy Now
Questions 12

A customer has an existing ACI fabric. Their management has decided to invest in NSX for virtual networking but also retain ACI for their customers and for physical networking.

What is a consideration?

Options:

A.

This solution is not possible. ACI takes care of virtual and physical networking.

B.

The customer will need to provide traditional tree network environment for NSX because only ACI works with the spine and leaf model.

C.

This solution is possible. The ACI APIC can be deployed as a virtual machine in virtual mode.

D.

This solution is possible but may be cost prohibitive.

Buy Now
Questions 13

Based on the RCM Upgrade Process RACI, who is responsible and accountable for the pre-upgrade questionnaire used during the Initiation Phase?

Options:

A.

Customer and Customer Advocate

B.

Customer and Assessment Lead

C.

Project Manager and Assessment Lead

D.

Project Manager and Customer

Buy Now
Questions 14

You are deploying a VxBlock system with Cisco ACI. What is a consideration?

Options:

A.

A minimum of two uplinks per leaf switch is recommended

B.

Fabric load balancing is achieved using VXLAN

C.

Leaf switches use 40 GbE vPC peer links

D.

Leaf switches connect to spines using 10 GbE links

Buy Now
Questions 15

What is encapsulated by a VxLAN?

Options:

A.

Layer 2 Ethernet frames in Layer 3 UDP-IP packets

B.

Layer 3 Ethernet frames in Layer 2 UDP-IP packets

C.

Layer 3 UDP-IP packets in Layer 2 Ethernet frames

D.

Layer 2 UDP-IP packets in Layer 3 Ethernet frames

Buy Now
Questions 16

A customer is planning to integrate a VxBlock to a new Cisco ACI fabric. What major physical connectivity change is needed if the customer intends to convert their existing

VxBlock Nexus 9396PX switches to ACI mode?

Options:

A.

Connect the switch directly to the APIC to download the ACI software. Then connect the existing Nexus 9396PX switches to a spine Nexus 93180YC switch.

B.

Remove the dual peer link connection but keep the peer link connection for ACI fabric heartbeat traffic exchange.

C.

Connect the Nexus 9396PX switch to spine Nexus 9500 switches. Remove other connections between the Nexus 9396PX switches.

D.

Nexus 9396PX switch cannot be integrated directly to ACI fabric.

Buy Now
Questions 17

What order of steps is taken when using an NSX edge service gateway with proxy mode load balancing?

D-VXB-DY-A-24 Question 17

Options:

Buy Now
Questions 18

What is a primary use of the RCM Assessment Workbook?

Options:

A.

Collect the health report of all VxBlock remediation components

B.

Create the upgrade plan for the ToR switch only

C.

Identify items and components that require remediation

D.

Create the upgrade plan for Compute only

Buy Now
Questions 19

What VMs are part of VxBlock Central?

Options:

A.

Multi-system Prepositioning (MSP), Element Manager, ESRS

B.

ESRS, Element Manager, Core

C.

Core, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

D.

Element Manager, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

Buy Now
Questions 20

Which document provides a representation of all the connections on the recently upgraded switch?

Options:

A.

Port Map

B.

Switch Administration Guide

C.

Solutions Abstract

D.

Switch Release Notes

Buy Now
Questions 21

Which document includes a complete list of tools used to perform a VxBlock 1000 upgrade?

Options:

A.

Converged Systems Administration Guide

B.

Converged Systems Expansion Guide

C.

Converged Systems Architecture Guide

D.

Converged Systems Physical Build Guide

Buy Now
Questions 22

Which required NSX component abstracts the physical network and provides access-level switching in the hypervisor?

Options:

A.

Edge Services Gateway

B.

vSphere Distributed Switch

C.

Distributed Logical Router

D.

vSphere Standard Switch

Buy Now
Exam Code: D-VXB-DY-A-24
Exam Name: Dell VxBlock Deploy Achievement
Last Update: Oct 15, 2025
Questions: 76

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99