API-SIEE Source Inspector Electrical Equipment Questions and Answers
In a Class I hazardous area, what is the maximum distance from an enclosure, containing arcing devices should a conduit seal be located?
What is the purpose of an equipment risk assessment in the source inspection process?
According to ANSI C57.12, the average winding temperature rise above ambient temperature shall not exceed what value?
What does the second letter of the four-letter cooling code on liquid-immersed transformers identify?
According to NFPA 70, the number of bends permitted between pull points for rigid metal conduits RMC shall not be more than:
During transformer inspection, the source inspector should verify that alarm, control, and trip settings on temperature and level indicators are:
Why should the dates for source inspection scheduled work process events such as the pre-inspection meeting, key inspection events and anticipated shipping date be identified in advance?
What standard defines the maximum number of conductors permitted in outlets, devices and junction boxes, and conduit bodies?
Positive-pressurization and purging are based on the principle that an enclosure or room located in a classified location can:
Which enclosure type is defined in the guide as a construction where free exchange of air is prevented between the inside and outside of the motor?
According to API 541, prior to mechanical running test, each mounting foot shall be checked for “soft feet.” How is this check conducted?
According to NFPA 70, equipment shall be marked to show the hazardous environment for which it has been evaluated. Markings on this equipment shall include which of the following?
In addition to purchase order requirements and company standards, what document would provide the details for correct coatings application?
According to API 541, the combined runout for areas on the shaft that are to be observed by radial vibration probes shall not exceed:
Which of the following is a typical topic for the pre-inspection meeting prior to the start of fabrication?
According to API RP 540, threaded conduit joints for explosionproof connections should be made with at least how many fully engaged threads?
What method is used to verify tightness of accessible bolted electrical connections?
When might a resident source inspector be required at a shop during manufacture and fabrication?
According to ANSI/NETA/ATS, when performing a dielectric withstand test on each bus section, the test voltage shall be applied for how long?
Circuit breakers over 1000 V equipped with stored energy mechanisms shall perform which of the following functions?
Which referenced standard in the guide applies to metal-enclosed low-voltage power circuit breaker switchgear?
What is the process that aims to find potential defects in a product before it is released for delivery?
According to NFPA 70, is the use of Teflon tape on threaded connections for conduits allowed?