Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Note! SAP has retired the C_TS422_2023 Exam and replaced it with the C_TS422 Exam. Contact us through Live Chat or email us for more information.

C_TS422_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Questions and Answers

Questions 4

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

Options:

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

Buy Now
Questions 5

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

First in first out (FIFO)

B.

Simultaneous

C.

Manual maintenance

D.

100% check

Buy Now
Questions 6

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

Options:

A.

The quantity and value updates are the same.

B.

The same batch management level is used.

C.

The same base unit of measure is used.

D.

The same account category is used.

Buy Now
Questions 7

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

Options:

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch where-used list.

D.

Use batch derivation.

Buy Now
Questions 8

What does the material type influence? Note: There are 2 correct answers to this question.

Options:

A.

Which document types and class categories are allowed

B.

Which plant-specific and plant-independent statuses are allowed

C.

Which material master screens appear and in which sequence

D.

Whether the material is produced in-house, procured externally, or both

Buy Now
Questions 9

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

Options:

A.

Planned delivery time

B.

Total replenishment lead time

C.

Operation duration

D.

In-house production time

Buy Now
Questions 10

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

Options:

A.

The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

B.

The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.

C.

The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

D.

The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Buy Now
Questions 11

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

Options:

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Planning without final assembly (50)

D.

Make-to-stock production (10)

Buy Now
Questions 12

What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Manufacturing date

B.

BOM header status

C.

BOM component status

D.

Lot size

Buy Now
Questions 13

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

Options:

A.

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

B.

Add the agreement to the source list mark it for MRP relevance.

C.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

D.

Add the agreement to the quota arrangement mark it for MRP relevance.

Buy Now
Questions 14

What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

Options:

A.

The Finite Scheduling indicator is NOT set in the strategy profile.

B.

The work center has several individual capacities.

C.

Alternative work centers are fully occupied.

D.

The Change Planning Direction indicator is set in the strategy profile.

Buy Now
Questions 15

What can you use standard heuristics in Advanced Planning (PP/DS) for?

Options:

A.

To automate material movements in material staging

B.

To set default values in production master data

C.

To solve planning problems for defined objects

D.

To optimize costs and times in production plans

Buy Now
Questions 16

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.

Options:

A.

Reduced delivery times

B.

Reduced times for final assembly

C.

Option to forecast planning for production resources

D.

Option to use make-to-order production

Buy Now
Questions 17

In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

Options:

A.

MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.

B.

MRP creates the capacity requirements without considering existing load on the work centers.

C.

MRP creates the capacity requirements at the earliest possible time.

D.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Buy Now
Questions 18

Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.

Options:

A.

Customers can grant access to the dashboard to partners.

B.

Customers can use the dashboard in the dev, test, and production tenants.

C.

It can be accessed by using SAP For Me.

D.

It can be used in all SAP S/4HANA Cloud editions.

Buy Now
Questions 19

What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? Note: There are 2 correct answers to this question.

Options:

A.

Routing

B.

Work Center

C.

Replenishment strategy

D.

Production supply area

Buy Now
Questions 20

Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

Options:

A.

Use a resource group.

B.

Use a planning group.

C.

Use a propagation range.

D.

Use a planning area.

Buy Now
Questions 21

Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

Options:

A.

Production cost collector

B.

Production version

C.

Repetitive manufacturing profile

D.

Routing

Buy Now
Questions 22

Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

Options:

A.

To monitor document table changes

B.

To enable integration into a sales order

C.

To save multiple changes for an object

D.

To monitor document object changes

Buy Now
Questions 23

You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

Options:

A.

The order lot size is NOT within the validity range of a production version.

B.

NO production lines are assigned to the production versions.

C.

All production versions for the material are locked.

D.

NO bills of material (BOMs) are assigned to the production versions.

Buy Now
Questions 24

What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

Options:

A.

You can reschedule the operation using lead time scheduling.

B.

You can reschedule the operation using infinite scheduling in a planning table.

C.

You can reschedule the operation using finite scheduling in a planning table.

D.

You can reschedule the operation in the Manage Work Center Capacity app.

Buy Now
Exam Code: C_TS422_2023
Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Last Update: Feb 5, 2026
Questions: 80