SAFe-Practitioner SAFe Practitioner Exam (6.0) Questions and Answers

Questions 4

What is the best measure of progress for complex system development?

Options:

A.

System Demo

B.

Prioritized backlog

C.

Inspect and Adapt

D.

Iteration Review

Buy Now
Questions 5

What are two behaviors of an effective Scrum Master? (Choose two.)You have reached the max number of allowed answers

Options:

A.

Facilitate the PI Planning session

B.

To act as a servant leader and exhibit Lean-Agile Leadership

C.

To guarantee no changes are made to the scope during an Iteration

D.

To facilitate the team's progress toward the Iteration goals

E.

Facilitate more than two teams

Buy Now
Questions 6

What is the recommended final agenda item of PI Planning?

Options:

A.

Surfacing the ART risks

B.

Reviewing the final plan

C.

Participating in the planning retrospective

D.

Assigning Business Value

Buy Now
Questions 7

The Release Train Engineer is a servant leader who displays which two actions or behaviors? (Choose two.)

Options:

A.

You have reached the max number of allowed answers

B.

Establishes Feature acceptance criteria

C.

Listens and supports teams in problem identification and decision-making

D.

Identifies market needs

E.

Leads by example

F.

Owns Vision and Roadmaps, Program Backlog, and ROI

Buy Now
Questions 8

What is the role of the Product Owner?

Options:

A.

To ensure quality by testing the Solution

B.

To prioritize the Program Backlog

C.

Estimate the Stories in the Product Backlog

D.

To represent the Customer to the Agile Team

Buy Now
Questions 9

What is the goal of the PI Planning event?

Options:

A.

Build a release Roadmap

B.

Achieve alignment on what needs to and can be built

C.

Create a plan for the upcoming PI showing how Stories map to Iterations

D.

Identify the risks in the upcoming Features using a ROAMing exercise

Buy Now
Questions 10

What do Strategic Themes influence directly?

Options:

A.

Lean budget Guardrails

B.

Organization of the ART

C.

Enterprise Strategy

D.

PI cadence

Buy Now
Questions 11

Which of the following statements describes the Release Train Engineer role?

Options:

A.

To maintain Team Backlogs

B.

To serve as the ART Chief Coach

C.

To serve as the ART-level content authority

D.

To ensure technical integrity of all development within the ART

Buy Now
Questions 12

What is considered an anti-pattern when assigning business values to team PI Objectives?

Options:

A.

Business values are assigned to uncommitted objectives.

B.

High business value is assigned to important Enabler work.

C.

Business Owners assign the business value for all teams on the ART.

D.

All PI Objectives are given a business value of 10.

Buy Now
Questions 13

Which statement is true about Iteration Planning?

Options:

A.

Items are assigned to the team members

B.

It is required for every Iteration to enable fast learning cycles

C.

The PO does not need to attend

D.

It occurs on the last day of the Iteration

Buy Now
Questions 14

What is one of the inputs to the Portfolio canvas?

Options:

A.

Portfolio Epics

B.

Strategic Themes

C.

Enterprise Strategy

D.

Value Stream budgets

Buy Now
Questions 15

A decrease in variability leads to an increase in what?

Options:

A.

Autonomy

B.

Options

C.

Predictability

D.

Innovation

Buy Now
Questions 16

Why is the modified Fibonacci sequence used when estimating?

Options:

A.

It serves as a way to estimate large ranges

B.

It can be used to predict unit test coverage

C.

It results in greater precision

D.

It reflects the uncertainty in estimating larger items

Buy Now
Questions 17

What is an example of applying cadence-based synchronization in SAFe?

Options:

A.

Teams decide their own Iteration length

B.

Teams can only release new software on the same day

C.

Teams meet twice every PI to plan and schedule capacity

D.

Teams align the start and end dates of their Iterations

Buy Now
Questions 18

During which PI Planning activity do Business Owners assign business value to PI Objectives?

Options:

A.

The final plan review

B.

The team breakout session

C.

The Management Review and Problem-Solving workshop

D.

The draft plan review

Buy Now
Questions 19

Which statement is true about uncommitted objectives?

Options:

A.

They help improve predictability

B.

They do not get assigned a business value score

C.

They are extra things the team can do if they have time

D.

The work to deliver uncommitted objectives is not planned into the Iterations during PI planning

Buy Now
Questions 20

Which statement describes the information within a Story?

Options:

A.

A Story provides just enough information for the intent to be understood by both business and technical people

B.

A Story is written in full detailed specifications so that the work is ready to be implemented immediately

C.

No further conversation is required after the Story is identified because it contains all necessary details

D.

Story acceptance criteria must be finalized before beginning Iteration Planning

Buy Now
Questions 21

What is one way to quickly address impediments to flow?

Options:

A.

Review burn-down charts

B.

Raise visibility of effects outside of ART control

C.

Identify them on the Planning Board

D.

Wait for the next Inspect and Adapt event

Buy Now
Questions 22

How does SAFe describe Customer Centricity?

Options:

A.

As a strategy to meet the needs of an ever-changing Customer market

B.

As a way of working to include the Customer in daily work processes and planning

C.

As a set of practices employed to make products focused on the Customer

D.

As a mindset focused on Customer behaviors that produce the best innovations

Buy Now
Questions 23

Turn mistakes into learning moments, create a trust-based environment, and visualize work are examples of which SAFe Core Value?

Options:

A.

Transparency

B.

Respect for People

C.

Relentless Improvement

D.

Alignment

Buy Now
Questions 24

What type of information can be easily seen in a cumulative flow diagram?

Options:

A.

Time to complete a Feature

B.

Team capacity

C.

Work in process across the team

D.

The number of defects that escape to production

Buy Now
Questions 25

Which factor helps unlock the intrinsic motivation of knowledge workers?

Options:

A.

Pay-for-performance

B.

Autonomy

C.

Parallel development

D.

Team performance incentives

Buy Now
Questions 26

Which is an example of a part of an Iteration retrospective?

Options:

A.

Estimation of Stories

B.

Team discussion around opportunities for continuous improvement

C.

Program level analysis of a problem using root cause analysis techniques

D.

Gathering feedback from the stakeholders

Buy Now
Questions 27

What is one example of differentiating business objectives?

Options:

A.

Enterprise Goals

B.

Portfolio Vision

C.

Strategic Themes

D.

Solution Intent

Buy Now
Questions 28

What are two ways to describe a cross-functional Agile Team?

Options:

A.

They can define, build, & test an increment of value.

B.

They are optimized for communication & delivery of value.

C.

They are made up of members, each of whom can define, develop, test, & deploy the system.

D.

They deliver value every six weeks.

E.

They release customer products to production continuously.

Buy Now
Questions 29

Team B has elected to stop holding retrospective events so they can spend more time completing Stories. Which of the following Agile Team responsibilities is Team B over-prioritizing?

Options:

A.

Applying systems thinking

B.

Deliver value

C.

Plan the work

D.

Connect with the customer

Buy Now
Questions 30

Which of the following Story components captures details on testing for completion?

Options:

A.

User voice

B.

Story map

C.

Acceptance criteria

D.

Release plan

Buy Now
Questions 31

What is used to capture the current state of the Portfolio and provide input for defining the future state?

Options:

A.

Portfolio Vision

B.

Portfolio Kanban

C.

Portfolio Canvas

D.

Portfolio Backlog

Buy Now
Questions 32

What is an example of a program event?

Options:

A.

Scrum of scrums

B.

Iteration review

C.

Daily stand-up

D.

Innovation and Planning

Buy Now
Questions 33

What is the basic building block when organizing around value?

Options:

A.

Hierarchies

B.

Individuals

C.

Agile Release Trains

D.

Agile Teams

Buy Now
Questions 34

What is scrum?

Options:

A.

A methodology used to deliver usable and reliable solutions to the end user

B.

A process for continuously maintaining deployment readiness

C.

A lightweight process for cross-functional, self-organized teams

D.

A routine method of deploying deliverables to operations

Buy Now
Questions 35

The Scrum Master/Team Coach wants to establish a team's initial capacity. The team has two testers, three developers, one full-time Scrum Master/Team Coach, and a Product Owner split between two teams. What is their capacity before calculating for time off?

Options:

A.

48

B.

32

C.

52

D.

40

Buy Now
Questions 36

What replaces detailed requirements documents?

Options:

A.

Pair work

B.

Task boards

C.

Stories

D.

Unit tests

Buy Now
Questions 37

How can a technical exploration Enabler be demonstrated?

Options:

A.

Show the acceptance tests written for the exploration

B.

Show the knowledge gained by the exploration

C.

Demonstrate working systems in the production environment

D.

Exploration Enablers do not need to be demonstrated

Buy Now
Questions 38

Team A is writing a Story enabling book shoppers to access their shopping cart from any page on the website. Which of the following examples represents the recommended user voice format for the Story?

Options:

A.

I am a book shopper that wants to access my shopping cart anywhere on the website

B.

I want to view my shopping cart so I can review what I am purchasing

C.

As a book shopper, I want access to my shopping cart from any page, so that I can review what I am purchasing

D.

As a book shopper, I want to access my shopping cart from any page

Buy Now
Questions 39

How does SAFe provide a second operating system that enables Business Agility?

Options:

A.

By achieving economies of scale

B.

By organizing around functional areas to focus on skills development

C.

By creating a hierarchy to provide stability

D.

By focusing on customers, products, innovation, and growth

Buy Now
Questions 40

What else does the SAFe principle, "unlock the intrinsic motivation of knowledge workers", require besides purpose and minimum possible constraints?

Options:

A.

Autonomy

B.

Innovation

C.

Incentive-based compensation

D.

Transparency

Buy Now
Questions 41

When basing decisions on economics, how are lead time, product cost, value, and development expense used?

Options:

A.

To recover money already spent

B.

To understand solution tradeoffs

C.

To limit work in process (WIP)

D.

To take into account sunk costs

Buy Now
Questions 42

What is critical to improving flow?

Options:

A.

Frequent context switching

B.

Reduce the batch sizes of work

C.

Address the local problems

D.

Increase work in process (WIP) limits

Buy Now
Questions 43

Which team type is organized to assist other teams with specialized capabilities and help them become more proficient in new technologies?

Options:

A.

Enabling team

B.

Platform team

C.

Stream-aligned team

D.

Complicated subsystem team

Buy Now
Questions 44

What is the role of the System Architect/Engineer?

Options:

A.

To manage dependencies

B.

To implement continuous improvement methods

C.

To guide the teams and support the Architectural Runway

D.

To define the design for the system

Buy Now
Questions 45

What must management do for a successful Agile transformation?

Options:

A.

Commit to quality and take responsibility to change the system

B.

Send someone to represent management, and then delegate tasks to these individuals

C.

Establish direct lines of report to the RTEs

D.

Identify and area of the transformation they can control

Buy Now
Questions 46

Which of the following continuous delivery pipeline aspects focuses on enabling the organization to deliver value aligned with business needs?

Options:

A.

Continuous Deployment

B.

Continuous Integration

C.

Release on Demand

D.

Continuous Exploration

Buy Now
Questions 47

During which PI planning activity are Stories written and sequenced?

Options:

A.

The team breakout session

B.

The draft plan review

C.

The management Review and Problem-Solving workshop

D.

The business context presentation

Buy Now
Questions 48

Which statement is a value from the Agile Manifesto?

Options:

A.

Build incrementally with fast, integrated learning cycles

B.

Responding to change over following a plan

C.

Respect for people and culture

D.

Working software is the primary measure of progress

Buy Now
Questions 49

What is one of the six steps in the Problem Solving Workshop?

Options:

A.

Apply root solution analysis

B.

Brainstorm possible failures

C.

Identify the biggest root cause using the Pareto Analysis

D.

Choose a problem to solve—agreement not required

Buy Now
Questions 50

During which of the following PI Planning activities are Business Owners asked to accept the plans?

Options:

A.

The Management Review and Problem-Solving workshop

B.

The draft plan review

C.

The final plan review

D.

The second team breakout session

Buy Now
Questions 51

What is a major benefit of reducing batch size?

Options:

A.

Increases visibility

B.

Decreases stress on the system

C.

Increases work in process

D.

Increases throughput

Buy Now
Questions 52

Which of the following SAFe Core Competencies of Business Agility includes the Customer Centricity and Design Thinking dimension?

Options:

A.

Lean Portfolio Management

B.

Lean-Agile Leadership

C.

Continuous Learning Culture

D.

Agile Product Delivery

Buy Now
Questions 53

What are Lean Portfolio Management, Agile Product Delivery, and Lean-Agile Leadership?

Options:

A.

Steps in the Business Agility Value Stream

B.

Agile values

C.

SAFe Core Competencies

D.

SAFe Lean-Agile Principles

Buy Now
Questions 54

What is one practice used to understand the problem space during the discover phase of Design Thinking?

Options:

A.

Prototyping

B.

Personas

C.

Empathy maps

D.

Gemba walks

Buy Now
Questions 55

Which of the following types of work is found within the Agile Team Backlog?

Options:

A.

Features

B.

Capabilities

C.

User Stories

D.

Epics

Buy Now
Questions 56

Which activity happens in the Inspect and Adapt workshop?

Options:

A.

A demo of the integrated system

B.

Refining the Program backlog

C.

Planning the next PI

D.

A retrospective of the Iteration

Buy Now
Questions 57

Which of the following aspects of the continuous delivery pipeline focuses on getting to production early for verification?

Options:

A.

Continuous Exploration

B.

Continuous Integration

C.

Release on Demand

D.

Continuous Deployment

Buy Now
Questions 58

Which of the following statements describes the balanced Agile testing pyramid?

Options:

A.

Many small, low-level, automated tests & fewer large, manual tests

B.

Many solution tests run by internal team members & fewer run by external testers

C.

Many solution tests run by external testers and fewer run by internal team members

D.

Many large, manual tests of the end-to-end solution and fewer small, automated tests

Buy Now
Questions 59

What is used to describe functional and non-functional requirements?

Options:

A.

Milestones

B.

Architectural Runway

C.

Features

D.

Enablers

Buy Now
Questions 60

Which of the following is an output of the PI Planning process?

Options:

A.

PI Vision

B.

PI Goals

C.

Actual PI Business Value

D.

PI Objectives

Buy Now
Questions 61

The Lean Thinking principle, "make value flow without interruptions" means identifying what?

Options:

A.

Predictability issues of the train

B.

Key performance indicators

C.

Activities that lack innovation

D.

Delays

Buy Now
Questions 62

Restoring the speed and innovation of the entrepreneurial network while leveraging the stability of the hierarchical system is a benefit of what?

Options:

A.

Functional silos

B.

Customer centricity

C.

Dual operating system

D.

Continuous learning culture

Buy Now
Questions 63

Which of the following team-level events does SAFe recommend running on a cadence during the PI for SAFe Team Kanban Teams?

Options:

A.

PO Sync

B.

Retrospective

C.

Coach Sync

D.

System Demo

Buy Now
Questions 64

What does a program board help teams identify?

Options:

A.

Program-level risks

B.

Dependencies between teams

C.

Each teams tasks

D.

Work breakdowns

Buy Now
Questions 65

Which statement is true about Iteration goals?

Options:

A.

They verify that teams are working at their full capacity

B.

They align the team to a common Vision of work in the Iteration

C.

They are used to track scope changes over time

D.

They are used to measure business value achieved for each Iteration

Buy Now
Questions 66

During the PI Planning event, when are planning adjustments agreed upon?

Options:

A.

During breakout sessions

B.

During the draft plan review

C.

During the Coach sync

D.

During the management review and problem-solving meeting

Buy Now
Questions 67

What is the purpose of building a continuous delivery pipeline?

Options:

A.

To deliver new functionality more frequently than with traditional processes

B.

To identify key stakeholders within the system architecture

C.

To prioritize system stability over development speed

D.

To prioritize development speed over system stability

Buy Now
Questions 68

Which of the following methods for gathering customer feedback relies on building analytic systems to deliver information about how customers are using the Solution?

Options:

A.

Continuous exploration

B.

Telemetry

C.

Refactoring

D.

Continuous integration

Buy Now
Questions 69

Quality is first and foremost a function of what in a Lean-Agile concept?

Options:

A.

Preserving options

B.

Culture of shared responsibility

C.

Empowered Solution authority

D.

Deployment on demand

Buy Now
Questions 70

What is one way to understand WIP in a system?

Options:

A.

Pair to complete the work faster

B.

Make current work visible

C.

Split stories

D.

Size stories smaller

Buy Now
Questions 71

Which two statements describe the responsibilities of the Product Owner? (Choose two.)

Options:

A.

To be a single voice for the Customer and stakeholders

B.

To own and manage the Team Backlog

C.

To ensure the team follows Agile principles and practices

D.

To protect the team from external forces

E.

To coach the team

Buy Now
Questions 72

The primary goal of SAFe is to achieve what?

Options:

A.

Learn Portfolio Management

B.

Organizing around value

C.

Customer centricity

D.

Business Agility

Buy Now
Questions 73

A team finishes developing all of their Stories in the first six days of the Iteration, tests them in the following two days, and fixes bugs in the days remaining. How is the team behaving?

Options:

A.

They are abusing the practice of hardening

B.

They are ignoring nonfunctional requirements within the Iteration

C.

They are waterfalling the Iteration

D.

They are applying the Agile development practice of "separation of concerns"

Buy Now
Questions 74

Three members of Team C created a new workflow to speed up the testing process. They spent an entire Iteration designing the process but discovered, just before implementation, that the system could not support the workflow. The rest of the team was excited to hear what was learned from the failed experiment. Which of the following characteristics of a high-performing Agile Team is Team C demonstrating?

Options:

A.

Enjoy their work and working together

B.

Trust each other, allowing for both healthy conflict and reliance on others

C.

Fostering an environment for taking risks without fear of embarrassment or punishment

D.

Accountable to each other and the organization for reliably completing quality work

Buy Now
Questions 75

Which of the following roles act as proxies for the customer in representing their needs to the teams?

Options:

A.

Developer roles

B.

Product roles

C.

Executive roles

D.

Architecture roles

Buy Now
Questions 76

Which of the following categories addresses potential risks?

Options:

A.

Resolved

B.

Obtained

C.

Supervised

D.

Acquired

Buy Now
Questions 77

What is the focus of Lean Thinking?

Options:

A.

Reducing delays

B.

Implementing objective measures of progress

C.

Ensuring respect for people and culture

D.

Moving to an iterative development process

Buy Now
Questions 78

Which of the following types of information is shown in a cumulative flow diagram?

Options:

A.

Team velocity

B.

Costs of producing artifacts

C.

Work that is in process across the whole team

D.

Time to complete a Feature by the rollup of Stories

Buy Now
Questions 79

What is a quality of an Agile team?

Options:

A.

Each team has a Scrum Master/Team Coach and a Product Manager

B.

Managers direct their work

C.

Cross-functional

D.

Composed of 10 to 20 members

Buy Now
Questions 80

Which of the following statements describes the Product Owner role?

Options:

A.

Prioritizing the ART Backlog

B.

Ensuring quality by testing the Solution

C.

Representing the Customer to the Agile Team

D.

Estimating Stories in the Product Backlog

Buy Now
Questions 81

Which statement correctly describes one aspect of the team's commitment at the end of PI Planning?

Options:

A.

A team commits to all the Features they put on the ART planning board

B.

A team commits only to the PI Objectives with the highest business value

C.

A team commits to all the Stories they put on their PI plan

D.

A team does not commit to uncommitted objectives

Buy Now
Exam Code: SAFe-Practitioner
Exam Name: SAFe Practitioner Exam (6.0)
Last Update: Oct 15, 2025
Questions: 270

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99