PSM-I Professional Scrum Master I Questions and Answers

Questions 4

(The Definition of Done serves which three purposes?

Choose the best three answers.)

Options:

A.

Guide the Developers on how many Product Backlog items to select for the Sprint.

B.

Describe the work that must be mostly done before the Sprint is allowed to end.

C.

Increase transparency.

D.

Describe the purpose, objective, and timebox of each Scrum event.

E.

Create a shared understanding of when work is complete.

Buy Now
Questions 5

What are three benefits of self-organization? (Choose three.)

Options:

A.

Increased creativity.

B.

Increased rule compliance.

C.

Increased accuracy of estimates.

D.

Increased self-accountability

E.

Increased commitment.

Buy Now
Questions 6

A Scrum Team has been working on a product for nine Sprints. A new Product Owner comes in, understanding he is accountable for the Product Backlog. However, he is unsure about his responsibilities. Which two activities are part of the Product Owner role according to Scrum? (Choose two.)

Options:

A.

Ensuring that the most valuable functionality is produced first, at all times.

B.

Interacting with stakeholders.

C.

Providing the Development Team with detailed specifications.

D.

Describing features as Use Cases.

E.

Creating detailed functional test cases.

Buy Now
Questions 7

Which of the following is required by Scrum? (Choose all that apply.)

Options:

A.

Sprint Retrospective.

B.

Members must be stand up at the Daily Scrum.

C.

Sprint Burndown Chart.

D.

Release planning.

E.

All of the above.

Buy Now
Questions 8

What is the key concern when multiple Development Teams are working from the same Product Backlog?

Options:

A.

Minimizing dependencies between teams.

B.

Clear definition of requirements.

C.

Meeting original scope projections.

D.

Making sure there’s enough work for everyone on every team.

E.

Maximizing velocity.

Buy Now
Questions 9

Which two things should the Development Team do during the first Sprint? (Choose two.)

Options:

A.

Make up a plan for the rest of the project.

B.

Analyze, describe, and document the requirements for the subsequent Sprints.

C.

Develop at least one piece of functionality.

D.

Analyze, design, and describe the complete architecture and infrastructure.

E.

Create an increment of potentially releasable software.

Buy Now
Questions 10

(When does a Developer become accountable for an item in the Sprint Backlog?

Choose the best answer.)

Options:

A.

During the Daily Scrum.

B.

Never. All Developers on the Scrum Team share accountability for items in the Sprint Backlog.

C.

As soon as a Developer on the Scrum Team can accommodate more work.

D.

At Sprint Planning when all of the Sprint Backlog items are split evenly across the Developers.

Buy Now
Questions 11

The time-box for a Daily Scrum?

Options:

A.

Two minutes per person.

B.

15 minutes.

C.

15 minutes for a 4 week sprint. For shorter Sprints it is usually shorter.

D.

4 hours.

E.

The same time of day every day.

Buy Now
Questions 12

What enhances the transparency of an increment?

Options:

A.

Doing all work needed to meet the definition of “Done”

B.

Reporting Sprint progress to the stakeholders daily

C.

Keeping track of and estimating all undone work to be completed in a separate Sprint.

D.

Updating Sprint tasks properly in the electronic tracking tool.

Buy Now
Questions 13

What are two good ways for the Development Team to make non-functional requirements visible? (Choose two.)

Options:

A.

Put them on a separate list on the Scrum board, available for all to see.

B.

Add them to the Product Backlog and keep the Product Owner posted on the expected effort.

C.

Run the integration and regression tests before the end of the Sprint, and capture the open work for the Sprint Backlog of the next Sprint.

D.

Add them to the definition of “Done” so the work is taken care of every Sprint.

Buy Now
Questions 14

Which statement best describes a Product Owner’s responsibility?

Options:

A.

Optimizing the value of the work the Development Team does.

B.

Managing the project and ensuring that the work meets the commitments to the stakeholders.

C.

Directing the Development Team.

D.

Keep stakeholders from distracting the Development Team.

Buy Now
Questions 15

Which statement best describes Scrum?

Options:

A.

A defined and predictive process that confirms to the principles of Scientific Management.

B.

A complete methodology that defines how to develop software.

C.

A cookbook that defines best practices for software development.

D.

A framework within which complex products in complex environments are developed.

Buy Now
Questions 16

Which does a self-organizing Development Team choose?

Options:

A.

Sprint length.

B.

How to best accomplish its work.

C.

Stakeholders for the Sprint Review.

D.

When to release, based on its progress.

E.

Product Backlog ordering.

Buy Now
Questions 17

Which two ways of creating Scrum Teams are consistent with Scrum ' s values?

(choose the best two answers)

Options:

A.

Bring all the people together and let them organize into Scrum Teams

B.

Managers personally re-assign current subordinates to new teams.

C.

Existing teams propose how they would like to go about organizing into the new

structure.

D.

Managers collaborate to assign individuals to specific teams.

E.

The Chief Product Owner determines the new team structures and assignments.

Buy Now
Questions 18

A Product Owner wants advice from the Scrum Master about estimating work in Scrum. Which of these is the guideline that a Scrum Master should give? (Choose the best answer.)

Options:

A.

Product Backlog items must be estimated in story points.

B.

Estimates are made by the people doing the work.

C.

Estimates must be in relative units.

D.

Scrum forbids estimating.

E.

Estimates are made by the Product Owner, but are best checked with the Development Team.

Buy Now
Questions 19

Who has the final say on the order of the Product Backlog?

Options:

A.

The Development Team.

B.

The Product Owner.

C.

The Scrum Master.

D.

The Stakeholders.

E.

The CEO.

Buy Now
Questions 20

What is the recommended size for a Development Team?

Options:

A.

7 plus or minus 3.

B.

At least 7.

C.

9.

D.

3 to 9.

Buy Now
Questions 21

Which two activities will a Product Owner engage in during a Sprint? (Choose two.)

Options:

A.

Run the Daily Scrum.

B.

Prioritize the Development Team’s work on the Sprint Backlog.

C.

Update the Sprint burndown chart.

D.

Answer questions from the Development Team about items in the current Sprint.

E.

Work with the stakeholders.

Buy Now
Questions 22

Who is responsible for tracking the remaining work of the Sprint?

Options:

A.

The Development Team.

B.

The Scrum Master.

C.

The Project Manager.

D.

The Development Team is consultation with the Product Owner.

E.

The Product Owner.

Buy Now
Questions 23

When a Development Team determines that it will not be able to finish the complete forecast, who has to be

present when reviewing and adjusting the Sprint work selected? (Choose the best answer.)

Options:

A.

The Development Team.

B.

The Product Owner and all stakeholders.

C.

The Product Owner and the Development Team.

D.

The Scrum Master, project manager and Development Team.

Buy Now
Questions 24

Which are appropriate topics for discussion in a Sprint Retrospective? (Choose the best three answers.)

Options:

A.

Arranging the Sprint Backlog for the next Sprint.

B.

The value of work currently represented in the Product Backlog.

C.

Team relations

D.

Definition of Done.

E.

How the Scrum Team does its work.

Buy Now
Questions 25

In the Sprint Planning meeting, the Product Owner and the Development Team were unable to reach a clear understanding about the highest order Product Backlog items. Because of this, the Development Team couldn’t figure out how many Product Backlog items it could forecast for the upcoming Sprint. They were able to agree on a Sprint Goal, however.

Which of the following two actions should the Scrum Master support? (Choose two.)

Options:

A.

Cancel the Sprint. Send the entire team to an advanced Scrum training and then start a new Sprint.

B.

Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.

C.

Continue the Sprint Planning meeting past its time-box until an adequate number of Product Backlog items are well enough understood for the Development Team to make a complete forecast. Then start the Sprint.

D.

Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.

E.

Ask everyone to take as much time as needed to analyze the Product Backlog first, and then reconvene another Sprint Planning meeting.

Buy Now
Questions 26

(Which statement best describes a Product Owner’s responsibility?

Choose the best answer.)

Options:

A.

Maximizing the value of the work the Scrum Team does.

B.

Keep stakeholders from distracting the Developers.

C.

Directing the Developers.

D.

Ensuring that the work meets the commitments to the stakeholders.

Buy Now
Questions 27

(When multiple Scrum Teams are working on a single product, what best describes the Definition of Done?

Choose the best answer.)

Options:

A.

When multiple Scrum Teams are working together on a product, they must mutually define and comply with the same Definition of Done.

B.

Each Scrum Team defines and uses its own. The differences are discussed and reconciled during a hardening Sprint.

C.

Each Scrum Team uses its own, but must make their definition clear to all other teams so the differences are known.

D.

The Scrum Masters from each Scrum Team define a common Definition of Done.

Buy Now
Questions 28

As the Development Team starts work during the Sprint, it realizes it has selected too much work to finish in the Sprint. What should it do?

Options:

A.

Inform the Product Owner at the Sprint Review, but prior to the demonstration.

B.

Find another Scrum Team to give the excess work to.

C.

As soon as possible in the Sprint, work with the Product Owner to remove some work or Product Backlog items.

D.

Reduce the definition of “Done” and get all of the Product Backlog items “Done” by the new definition.

Buy Now
Questions 29

The Sprint Review is mainly an inspect and adapt opportunity for which group?

Options:

A.

The Development Team and stakeholders.

B.

The Product Owner and Development Team.

C.

The Scrum Team and stakeholders.

D.

The Product Owner and management.

E.

The Development Team and management.

F.

The Product Owner and stakeholders.

Buy Now
Questions 30

Who should make sure everyone on the Development Team does their tasks for the Sprint?

Options:

A.

The Project Manager.

B.

The Product Owner.

C.

The Scrum Master.

D.

The Development Team.

E.

All of the above.

Buy Now
Questions 31

Why should the Product Owner be present at the Daily Scrum?

Options:

A.

He/She doesn’t need to be there.

B.

To hear about impediments in functionality.

C.

To represent the stakeholders’ point of view.

D.

To participate as a Scrum Team member.

Buy Now
Questions 32

How much work Is required of the Developers to complete a Product Backlog Item selected during the Sprint Planning?

(choose the best answer)

Options:

A.

All development work and at least some testing.

B.

as much as is required to meet the Scrum Team ' s Definition of Done.

C.

A proportional amount of time on analysis, design development and testing

D.

As much as they can fit into the Sprint, with remaining work deferred to the next Sprint

Buy Now
Questions 33

User documentation is part of your definition of “Done”. However, there aren ' t enough technical writers for all teams. Your Development Team doesn ' t have a technical writer. What should you do?

Options:

A.

Form a separate team of technical writers that will work on an on-demand basis for the various Product Owners. Work order will be first in, first out.

B.

Let the user documentation remain undone and accumulate until after the last development Sprint. It will then be done by any available technical writers.

C.

Wait until you have a technical writer on your Development Team to take care of this.

D.

Your Development Team is still responsible for creating user documentation. In this case, the Development Team members will write it.

Buy Now
Questions 34

Who does the work to make sure Product Backlog items conform to the Definition of Done?

(choose the Best answer)

Options:

A.

The Quality Assurance Team

B.

The Scrum Team

C.

The Product Owner

D.

The Scrum Master

E.

The Developers

Buy Now
Questions 35

Who determines how many Product Backlog items the Developers select tor a sprint? (choose the best answer)

Options:

A.

The Scrum Master

B.

The Scrum Team

C.

The Developers

D.

The stakeholders attending Sprint Planning

E.

The Product Owner

Buy Now
Questions 36

True or False A scrum Master fulfills the same role as a traditional Project Manager

Options:

A.

True

B.

False

Buy Now
Questions 37

Which of the following might the Scrum Team discuss during a Sprint Retrospective?

Options:

A.

Methods of communication.

B.

The way the Scrum Team does Sprint Planning.

C.

Skills needed to improve the Development Team’s ability to deliver.

D.

Its Definition of “Done”.

E.

All of the above.

Buy Now
Questions 38

Who is on the Scrum Team? (Choose all that apply.)

Options:

A.

Scrum Master

B.

Product Owner

C.

Development Team member

D.

Project Manager

E.

None of the above

Buy Now
Questions 39

Who is responsible for engaging the stakeholders?

Options:

A.

The Business Analyst.

B.

The Development Team.

C.

The Team Manager.

D.

The Project Manager.

E.

The Product Owner.

Buy Now
Questions 40

True or False A high-performance scrum Team ensures that each increment is complete by running a Release Sprint.

Options:

A.

True

B.

False

Buy Now
Questions 41

One of the Scrum events is the Daily Scrum. What are two intended outcomes of the Daily Scrum? (Choose two.)

Options:

A.

A shared understanding of the most important work to be undertaken next to achieve the best possible progress toward the Sprint goal.

B.

An update of completed tasks and of the remaining work so the Scrum Master can plan the next day.

C.

A status report for the upper management indicating what each individual has done, will be doing, and what is impending him/her.

D.

An updated Scrum board to make Sprint progress transparent for the stakeholders.

E.

New impediments for the Scrum Master to take care of.

Buy Now
Questions 42

What is the function or purpose of management in Scrum?

(choose the best answer)

Options:

A.

To identify and remove people that are not working hard enough.

B.

To monitor the productivity of the Developers.

C.

To present the Scrum Teams with insights and resources that help them improve.

D.

To continually monitor staffing levels of the Scrum Team.

Buy Now
Questions 43

A product Increment must be released to production at the end of each Sprint.

Options:

A.

True

B.

False

Buy Now
Questions 44

Which of the following is a Developer accountable for? (Choose the best two answers.)

Options:

A.

Selecting the Product Owner.

B.

Reporting productivity.

C.

Creating a plan for the Sprint, the Sprint Backlog.

D.

Organizing the work required to meet the Sprint Goal.

Buy Now
Questions 45

When does the next Sprint begin?

Options:

A.

When the Product Owner is ready.

B.

Immediately after the conclusion of the previous Sprint.

C.

The Monday following the Sprint Review.

D.

Immediately following the next Sprint Planning.

Buy Now
Questions 46

You have six teams using a traditional method to deliver a product. Your management has asked you to start using Scrum. In the initial project there were separate plans and teams for the layers of a software system, i.e. one for the front-end, one for the middle tier, one for the back-end, and one for the interfaces and services. This resembles what is known as component teams. But you have read that it’s a good idea to have teams organized by feature.

What are the advantages of keeping component teams while starting Scrum?

Options:

A.

There’s less initial disruption than organizing into new teams. As they start, they will discover what works best, and how to potentially re-organize towards this.

B.

Component teams generally have the skills needed to create a working Increment of software that provides business value.

C.

Because they have worked together for some time, they are likely able to start producing shippable Increments faster that new feature teams would.

D.

There are fewer cross-team dependencies than working in feature teams.

Buy Now
Questions 47

The Product Owner makes sure the team selects enough from the Product Backlog for a Sprint to satisfy the stakeholders.

Options:

A.

True

B.

False

Buy Now
Questions 48

Which of the following services are appropriate for a Scrum Master in regard to the Daily Scrum?

Options:

A.

Lead the discussions of the Development Team.

B.

Make sure that all 3 questions have been answered by each member of the team.

C.

Keep track of whether each team member has a chance to speak.

D.

Teach the Development Team to keep the Daily Scrum within the 15 minute time-box.

E.

All of the above.

Buy Now
Questions 49

When is implementation of a Product Backlog item considered complete?

Options:

A.

At the end of the Sprint.

B.

When the item has no work remaining in order to be potentially released.

C.

When QA reports that the item passes all acceptance criteria.

D.

When all work in the Sprint Backlog related to the item is finished.

Buy Now
Questions 50

The Daily Scrum is an event that happens every day. What would be three key concerns if the frequency were to be lowered to every two or three days? (Choose three.)

Options:

A.

Opportunities to insect and adapt the Sprint Backlog are lost.

B.

Impediments are raised and resolved more slowly.

C.

The Product Owner cannot accurately report progress to the stakeholders.

D.

Too much work is spent updating the Scrum board before the meeting.

E.

The Scrum Master loses the ability to update the Gantt chart properly.

F.

The Sprint plan may become inaccurate.

Buy Now
Questions 51

Every Scrum Team should nave:

(choose the best answer)

Options:

A.

One Lead Developer and no more than 8 other members.

B.

The competencies and skills needed to deliver an Increment in a Sprint

C.

At least one representative from each major department, such as, Quality Assurance, Development, and Marketing.

Buy Now
Questions 52

What are three ways Scrum promotes self-management?

Options:

A.

By having the Scrum Master protect the Scrum Team.

B.

By the Scrum Team deciding what work to do in a Sprint.

C.

By being a lightweight framework.

D.

By removing titles for Scrum Team members.

Buy Now
Questions 53

How do you know that a Development Team is cross-functional?

Options:

A.

Development Team has all the skills to create a potentially releasable increment by the end of every Sprint.

B.

A few of the Development Team members pair program and do Test Driven Development.

C.

There are no conflicts within the Development Team.

D.

Every member of the Development Team is able to perform every task.

Buy Now
Questions 54

What may be included in the Sprint Backlog? (choose the best answer)

Options:

A.

User Stones

B.

Tasks

C.

Use Cases

D.

Tests

E.

Any of the above (or others) which ate a decomposition of the selected Product Backlog items

Buy Now
Questions 55

What it the main reason for the Scrum Master to be at the Daily Scrum?

Options:

A.

To gather status and progress information to report to management.

B.

To write down any changes to the Sprint Backlog, including adding new items, and tracking progress on the burn-down.

C.

He or she does not have to be there; he or she only has to ensure the Development Team has a Daily Scrum.

D.

To make sure every team member answers the three questions.

Buy Now
Questions 56

A Scrum Team is only allowed to meet with stakeholders during Sprint Review.

Options:

A.

True

B.

False

Buy Now
Questions 57

As the Sprint Planning progresses, the Developers realize that the workload may be greater

than their capacity to complete the work. Which two are valid actions?

(choose the best two answers)

Options:

A.

Recruit additional Developers before the work can begim

B.

The Developers ensure that the Scrum Team is aware, start the Sprint, and

monitor progress.

C.

The Developers work overtime during this Sprint

D.

Cancel the Sprint

E.

Remove or change selected Product Backlog items.

Buy Now
Questions 58

During a Sprint Retrospective, for what is the Product Owner responsible?

Options:

A.

Participating as a Scrum Team member.

B.

Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team.

C.

Capturing requirements for the Product Backlog.

D.

The Product Owner should not take part in Sprint Retrospectives.

Buy Now
Questions 59

Who is responsible for collaboration with stakeholders?

(choose the best answer)

Options:

A.

The Business Analyst.

B.

The Scrum Team.

C.

The Team Manager.

D.

The Project Manager.

E.

The Developers.

Buy Now
Questions 60

Why is the Daily Scrum held at the same time and same place?

Options:

A.

The consistency reduces complexity.

B.

The place can be named.

C.

The Product Owner demands it.

D.

Rooms are hard to book and this lets it be booked in advance.

Buy Now
Questions 61

How much time is required after a Sprint to prepare for the next Sprint?

Options:

A.

The break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for shorter sprints.

B.

Enough time for the requirements for the next Sprint to be determined and documented.

C.

Enough time for the Development team to finish the testing from the last Sprint.

D.

None. A new Sprint starts immediately following the end of the previous Sprint.

E.

All of the above are allowed depending on the situation.

Buy Now
Questions 62

The Product Owner must release each Increment to production.

Options:

A.

When it makes sense.

B.

To make sure the Development Team is done every Sprint.

C.

Whenever the product is free of defects.

D.

Without exception.

Buy Now
Questions 63

Which of the following is an example of an Increment? (Choose the best answer.)

Options:

A.

A plan for the overall product release.

B.

A mock-up of the product marketing materials.

C.

A design for the product.

D.

A product roll-out plan.

E.

A valuable, useful set of products featured.

F.

All of the above.

Buy Now
Questions 64

For which is the Scrum Master responsible?

Options:

A.

Managing the performance of the Scrum Team.

B.

The meetings and the objectives that a Scrum Team sets for itself.

C.

The Scrum framework being adopted and used properly.

D.

Keeping track of resource allocation.

Buy Now
Questions 65

(Several Sprints into a project, the Product Owner tells the Scrum Master that a key stakeholder has just started using the product. The stakeholder is unhappy with the quality of the product, and the Product Owner agrees with the stakeholder’s assessment that the quality is low. How should the Scrum Master respond to the Product Owner?

Choose the best two answers.)

Options:

A.

Explain to the Product Owner that it is up to the Developers to decide on acceptable quality standards.

B.

Encourage the Product Owner to include quality specifications in the Product Backlog and to communicate the stakeholders ' concerns to the Developers.

C.

Work with the Product Owner to understand their desired resolution and help formulate an approach for raising the concern with the Developers.

D.

Bring the concern to the testers to improve how the product is verified.

E.

Tell the Product Owner they have noted the concern and will raise this issue at the Sprint Retrospective.

Buy Now
Questions 66

Which two things should the Development Team do during the first Sprint? (Choose two.)

Options:

A.

Make up a plan for the rest of the project.

B.

Analyze, describe, and document the requirements for the subsequent Sprints.

C.

Develop at least one piece of functionality.

D.

Define the major product features and release plan architecture

E.

Create an increment of potentially releasable software.

Buy Now
Questions 67

What are two responsibilities of testers in a Scrum Team?

(choose the best two answers)

Options:

A.

Finding bugs.

B.

Tracking quality metrics.

C.

Verifying the work of programmers.

D.

Scrum has no " tester " role.

E.

The Developers are responsible for quality.

Buy Now
Questions 68

True or False: Multiple scrum Teams working on the same product must have the same Sprint start date.

Options:

A.

True

B.

False

Buy Now
Questions 69

As the Sprint Planning meeting progresses, the Development Team sees that the workload is greater than they can handle. Which two are valid actions? (Choose two.)

Options:

A.

Recruit additional Development Team members before the work can begin.

B.

The Development Team ensures that the Product Owner is aware, starts the Sprint, and monitors progress.

C.

Cancel the Sprint.

D.

Remove or change selected Product Backlog items.

E.

The Development Team works overtime during this Sprint.

Buy Now
Questions 70

(A Developer takes the Scrum Master aside to express concerns about data security issues. What should the Scrum Master do?

Choose the best answer.)

Options:

A.

Add security to the Definition of Done.

B.

Tell the Product Owner to stop further development of features until the issues are fixed.

C.

Create a Product Backlog item for security.

D.

Go check with the testers.

E.

Ask the Developer to share the concern with the team as soon as possible.

Buy Now
Questions 71

(When is the Sprint Backlog created?

Choose the best answer.)

Options:

A.

During Sprint Planning.

B.

Prior to Sprint Planning.

C.

During refinement.

D.

During the Sprint Retrospective.

Buy Now
Questions 72

Who has the final decision about the order of items in the Product Backlog? (Choose the best answer.)

Options:

A.

The Stakeholders.

B.

The Product Owner.

C.

The Scrum Team.

D.

The Scrum Master.

E.

The Developers.

Buy Now
Questions 73

A new developer is having continuing conflicts with existing Development Team members and creating the hostile environment. If necessary, who is responsible for removing the team member?

Options:

A.

The hiring manager is responsible, because he/she hired the developer.

B.

The Scrum Manager is responsible, because he/she removes Impediments.

C.

The Development Team is responsible, and may need help from the Scrum Master.

D.

The Product Owner is responsible, because he/she controls the return on investment (ROI).

Buy Now
Questions 74

(What are two effective ways for a Scrum Team to ensure security concerns are satisfied?

Choose the best two answers.)

Options:

A.

Delegate the work to the security department.

B.

Have the Scrum Team create Product Backlog items for each concern.

C.

Add security concerns to the Definition of Done.

D.

Postpone the work until a specialist can perform a security audit and create a list of security-related Product Backlog items.

E.

Add a Sprint to specifically resolve all security concerns.

Buy Now
Questions 75

Which Scrum Value is affected by a lack of trust in the Scrum Team?

Options:

A.

Focus

B.

Respect

C.

Openness

D.

Courage

E.

Commitment.

F.

All of the above

Buy Now
Questions 76

During the Sprint Retrospective a Scrum Team has identified several high priority process improvements.

Which of the following statements is most accurate? (Choose the best answer.)

Options:

A.

The Scrum Team may add items to the Sprint Backlog for the next Sprint.

B.

The Scrum Team should choose at least one high priority process improvement to place in the Product

Backlog.

C.

The Scrum Team should decline to add a process improvement to the Sprint Backlog when things are

running smoothly.

D.

The Scrum Master selects the most important process improvement and places it in the Sprint Backlog

Buy Now
Questions 77

What is the function or purpose of management in Scrum?

(choose the best answer)

Options:

A.

To identify and remove people that are not working hard enough.

B.

To present the Scrum Teams with insights and resources that help them improve.

C.

To monitor the productivity of the Developers.

D.

To continually monitor staffing levels of the Scrum Team.

Buy Now
Questions 78

At the end of a Sprint Product Backlog item worked on during the Sprint does not meet the definition of “Done”. What two things should happen with the undone Product Backlog item? (Choose two.)

Options:

A.

If the stakeholders agree, the Product Owner can accept it and release it to the users.

B.

Put it on the Product Backlog for the Product Owner to decide what to do with it.

C.

Review the item, add the “Done” part of the estimate to the velocity and create a Story for the remaining work.

D.

Do not include the item in the Increment this Sprint.

Buy Now
Questions 79

For which of the following is the Scrum Master responsible?

(choose the best answer)

Options:

A.

Properly adopting and using the Scrum framework.

B.

Keeping track of resource allocation.

C.

Managing the performance of the Scrum Team.

D.

The meetings and the objectives that a Scrum Team sets for itself.

Buy Now
Questions 80

When might a Sprint be abnormally cancelled?

Options:

A.

When the Development Team feels that the work is too hard.

B.

When the Sprint Goal becomes obsolete.

C.

When the sales department has an important new opportunity.

D.

When it becomes clear that not everything will be finished by the end of the Sprint.

Buy Now
Questions 81

If burndown charts are used to visualize progress, what does a trend line through a release burndown chart indicate?

Options:

A.

The evolution of the cost spent on the project.

B.

When all work will be completed to the Scrum Team can be released for other work.

C.

When the work remaining will likely be completed if nothing changes on the Product Backlog or the Development Team.

D.

When the project will be over if the Product Owner removes work that is equal in effort to any new work that is added.

Buy Now
Questions 82

A Development Team asks their Product Owner to re-order the Product Backlog. The team is waiting for an external supplier to deliver a specific software component. Without that component there won’t be enough work in the next Sprint to occupy the full team. The Product Owner asks the Scrum Master for help. What would be good advice to give the Product Owner?

Options:

A.

Remind the Product Owner that his primary concern is the flow of value reflected in the ordering of the Product Backlog.

B.

Tell the Product Owner to re-order the Product Backlog so the work involving the external component can be planned in a separate sprint.

C.

Tell the Product Owner that the Product Backlog should be ordered to maximize utilization of the Development Team.

Buy Now
Questions 83

How is management external to the Scrum Team involved in the Daily Scrum?

Options:

A.

The Scrum Master speaks on their behalf.

B.

The Development Team self-manages and is the only management required at the Daily Scrum.

C.

Management gives an update at the start of each Daily Scrum.

D.

The Product Owner represents their opinions.

Buy Now
Questions 84

When does a Sprint conclude?

(choose the best answer)

Options:

A.

When the Product Owner decides enough has been delivered to meet the Sprint

Goal.

B.

When the Sprint Retrospective is complete.

C.

When all the tasks are completed by the Developers.

D.

When all Product Backlog items meet their Definition of Done.

Buy Now
Questions 85

(Which of the following might the Scrum Team discuss during a Sprint Retrospective?

Choose the best answer.)

Options:

A.

Methods of communication.

B.

The way the Scrum Team does Sprint Planning.

C.

Skills needed to improve the Developers’ ability to deliver.

D.

The Definition of Done.

E.

All of the above.

Buy Now
Questions 86

Which statement best describes the Sprint Backlog as the output ot the Sprint Planning?

(choose the best answer)

Options:

A.

Every item nas a designated owner.

B.

It is ordered by the Product Owner.

C.

Each task is estimated in hours.

D.

It is the Developers plan for the Sprint

E.

It is a complete list of all work to be done in a Sprint.

Buy Now
Questions 87

The Product Backlog is ordered by:

Options:

A.

The Product Owner with the most valuable items placed at the top.

B.

Risk, where safer items are at the top, and riskier items are at the bottom.

C.

Items are randomly arranged.

D.

Size, where small items ale at the top and large items are at the bottom.

Buy Now
Questions 88

When multiple teams work together on the same product, each team should maintain a separate Product Backlog.

Options:

A.

True

B.

False

Buy Now
Questions 89

What are two good ways for a Scrum Team to ensure security concerns are satisfied? (Choose two.)

Options:

A.

Postpone the work until a specialist can perform a security audit and create a list of security-related Product Backlog items.

B.

Add security concerns to the definition of “Done”.

C.

Add a Sprint to specifically resolve all security concerns.

D.

Delegate the work to the concerned department.

E.

Have the Scrum Team create Product Backlog items for each concern.