A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.

What is the reason for this?

Options:

A.

Production Priority was not populated in the new WD2 during creation.

B.

Item and Structure Name in the existing WD1 were retained in the new WD2 during creation.

C.

Item and Structure Name were changed in the new WD2 during creation.

D.

Start Date was not populated in the new WD2 during creation.

Buy Now
Questions 5

Which three statements are true about the main areas of Managerial Accounting?

Options:

A.

Receipt Accounting Is the application that performs accrual accounting for all types of receipts.

B.

Landed Cost Management gives organizations financial visibility into their extended supply chain costs.

C.

Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation Is initiated.

D.

Cost method can be defined with granularity down to individual Items.

Buy Now
Questions 6

A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.

What is the correct sequence of tasks to achieve this?

Options:

A.

Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

B.

Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.

C.

Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.

D.

Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.

Buy Now
Questions 7

A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particular day.

Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

Options:

A.

Click Inside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource dropdown list > Enter 4 in Default Units Available.

B.

Click inside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration Fields > Go to the Resource Availability region > Populate A units in the Default Availability column.

C.

Click outside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration fields > Go to the Resource Availability and Overrides region > Populate 4 units in the Availability Override column.

D.

Click outside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource drop-

Buy Now
Questions 8

Production operations need operators to execute the right steps to produce quality products, so want to use " View Document Items on a Dispatch List. "

Which statement is NOT true?

Options:

A.

You cannot view the document item attachment on the Manage Supplier Operations page.

B.

You will always see the active revision of the attachment from currently effective revision of the document from Master Organization.

C.

You can add attachments to the document item and invoke the engineering change order to release the latest revision of the document item and attachment.

D.

You can view the document item attachment in the dispatch list and on the Manage Supplier Operations page by using the attachment icon.

Buy Now
Questions 9

Which three are Cost accounting methods '

Options:

A.

Perpetual Average Cost

B.

Layer Cost, also known as " LIFO "

C.

Frozen Standard Cost

D.

Actual Cost, also known as " FIFO "

E.

Periodic Actual Cost

Buy Now
Questions 10

Which statement is NOT true about cumulative lead time?

Options:

A.

It calculates cumulative manufacturing lead times by rolling up manufacturing lead times of make Items.

B.

It updates the item ' s lead time attributes at the end of the calculation process: cumulative manufacturing and cumulative total lead times.

C.

It calculates cumulative total lead times by rolling up lead times of make items and adding up lead time values of buy items.

D.

It updates lead time percent at the operation level in the work definition.

Buy Now
Questions 11

During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.

What must they do to achieve this?

Options:

A.

Exclude cost variances while closing last month ' s work orders because those can be applied directly In Subledger Accounting.

B.

Make sure that all costs are Included while closing last month ' s work orders; however, variances can be Included after closing the work orders.

C.

Include all costs and variances in last month ' s work orders and close them; however, the work orders where updates are expected must not be closed.

D.

Update work order costs at any time; they can be updated regardless of the status of the work order

Buy Now
Questions 12

A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.

Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

Options:

A.

Report Resource, Material, and Operation Transactions

B.

Manage Work Orders

C.

Review Production Transaction History

D.

Review Dispatch List

Buy Now
Questions 13

Which is NOT a required setup task for Manufacturing master data?

Options:

A.

Manage Production Resources

B.

Manage Plant Parameters

C.

Manage Work Centers

D.

Manage Work Areas

E.

Manage Plant Profiles

Buy Now
Questions 14

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

Options:

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

Buy Now
Questions 15

In the work execution area, which three infolets are provided to users for instant access?

Options:

A.

Work Order Performance

B.

Scrap

C.

Operation Exception

D.

Operation Efficiency

E.

work order Exception

Buy Now
Exam Code: 1z0-1075-25
Exam Name: Oracle Manufacturing Cloud 2025 Implementation Professional
Last Update: Mar 5, 2026
Questions: 50

PDF + Testing Engine

$140

Testing Engine

$105

PDF (Q&A)

$90