The WaterSense label program was developed by which federal agency to promote water-efficient products and resources?
Which location for a new building will have the greatest impact on lowering greenhouse gas emissions?
Which of the following strategies encourages a building's users to use alternative transportation?
Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?
A new project is being built adjacent to a park with a 1/8 mi. (0.20 km) trail leading to an urban business district, which includes several retail shops and restaurants. This project qualifies for Location and Transportation Credits by
Which of the following scenarios would potentially help a project earn the most LEED points?
Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?
Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?
Which of the following is an appropriate usage of U.S. Green Building Council (USGBC) terminology for a LEED project?
Which of the following strategies will help to improve indoor air quality during construction?
Which of the following approaches refers to the identification and quantification of environmental effects throughout the life of the materials andproducts used in a project as well as the project itself?
A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?
A project team receives advice from a LEED AP about reducing a building footprint in order to increase the potential area of a botanical garden. Which impact category does this design recommendation support?
The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?
The LEED credit weightings. in regard to the most important environmental impacts and human benefits, are based on impact categories defined and established by the
Which of the following standards addresses guidance for sustainable construction in complying with building codes?
In addition to prohibiting smoking inside buildings, it is also important to prohibit smoking near:
A company is considering investing in green power for its operations facilities, but is reluctant because of the high capital investment, maintenance costs and slow initial financial returns. Which of the following is a practical strategy to help the company overcome these obstacles?
Which of the following includes impacts quantified by life-cycle costing (CCC)?
Which of the following is a strategy that can help projects meet on site sustainability goals during construction?
Which of the following best helps a project team determine access to quality transit? raj Calculator
The protection and restoration of natural vegetation, wetland areas and bodies of water through building footprint consolidation helps to
What is the primary purpose of using low-emitting partitions in office buildings?
A project team is pursuing LEED certification for an existing commercial office building to certify ongoing sustainability performance. Which LEED rating system should be used for this project?
What is the approximate percentage of global carbon dioxide emission related to transportation?
At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?
Materials that would otherwise be discarded but are incorporated into a new building are considered to be
The most efficient way for building users to rate the heating and air-conditioning and other aspects of work spaces is through
Which industry benchmarking tool is used for measuring ongoing energy performance?
in the triple bottom line which of the following capital resources represents the costs and benefits of a project for all the stakeholders?
Which of the following must a waste reduction, reuse and recycling program collect and measure?
A tile manufacturer produces tiles that are made from fully recyclable materials and are designed for easy disassembly and possible recycling at the end of their life. Which of the following life cycle assessment approaches does this manufacturer use?
A nine-story residential building includes 60% of the gross floor area within the project scope, Which rating system is the most appropriate for the LEED certification of this project?
Which of the following processes is conducted prior to building occupancy and removes indoor airbome contaminants by thoroughly exhausting old air and replacing it with fresh outdoor air?
For benchmarking purposes, a baseline building performance is evaluated (by means of energy simul-ation model), as defined in
Where could a project be located to purchase Renewable Energy Certificates (RECs)?
Which of the following strategies are used to address Transportation in Operation and Maintenance under the Location and Transportation LEED Category?
As of 1996, the Montreal Protocol banned the production of what chemical compound known to have ozone-depleting potential?
Which term describes misinformation presented to consumers to portray a product or policy as being more environmentally friendly than it is?
What green building objective does utilizing high efficiency water fixtures achieve?
Which label or certification indicates reduced water consumption for appliances?
What is reclaimed water?
It is potable water from a well within the project boundary and owned by the project owner
A building owner has set a goal of reducing water use by 20% for the upcoming year. Which of the following strategies will aid in reducing indoor water demand to achieve the water reduction goal set by the owner?
When considering water conservation and water-efficient landscaping, which two types of water would be most useful for landscape irrigation?
Which of the following concepts uses drought-tolerant native and adaptive plants to promote water conservation?
In a large site that has a short, intense rainy season and a long, dry season, what component of a collected rainwater irrigation system is most likely to make it cost prohibitive over a conventional system?
Which of the following credit categories is affected by increasing the amount of ventilation in an occupied space?
During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?
According to LEED. which of the following should be considered when locating a site for a project?
Careful selection of which of the following substances helps manage ozone depletion potential and global warming potential?
Which of the following is an Environmental Concern when referring to Energy and Atmosphere?
Use of which of the following can help reduce the heat gain and peak air temperatures?
Which of the following methods provides maximum water efficiency for a building irrigation system?
Designers and builders can construct a green building that uses significantly less water than a conventional building by incorporating which opportunity?
Up lo how many maximum points can a project earn under the Regional Priority credit?
Which of the following is a minimum program requirement for LEED@ for New Construction and Major Renovations projects?
The water use reduction for a project is determined by finding the difference between the baseline conditions and the
Implementation of green building strategies such as daylighting. passive cooling, high-efficiency mechanical systems and stack ventilation contributes to the reduction of what type of costs?
One of the requirements for the Sustainable Sites Credit. Rainwater Management is that projects must
Which of the following terms encourages team members to collaborate throughout the process of design and construction to create synergistic solutions?
The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?
Which of the following projects would be appropriate to pursue LEED certification according to the Minimum Program Requirements (MPRs)?
A developer has asked the building designer to incorporate a landscape irrigation system using the building's graywater in order to earn LEED points. Which is the most appropriate source of graywater for this use?
What Indoor Environmental Quality prerequisite or credit is specific to LEED for Schools?
What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?
Which of the following standard organizations support requirements for the Minimum Energy Performance Prerequisite and the Minimum Indoor Air Quality Performance Prerequisite?
In a new building which of the following is an effective way to confirm a building's performance compared with performance goals design specifications and the Owner's Project Requirements?
Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?
If a project incorporates daylighting, in which category should the project team seek points for implementing this strategy?
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?
Which organization designed the Minimum Efficiency Reporting Value (MERV) measurement scale that rates the effectiveness of air filters?
Which of the following terms is used when describing a site which may be complicated by the presence of hazardous substances, pollutants or contaminants?
What strategy ranks first in the waste hierarchy to minimize construction waste on a project?
Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?
What is the maximum number of occupiable stories for a project to be considered LEED Building Design and Construction Homes and Multifamily Low-rise?
Which of the following strategies contributes to reducing heat island effect and managing rainwater runoff?
Which of the following interior items contributes to a comfortable acoustic environment?
Which of the following tools should be used to identify indoor environmental issues and prepare a corrective action plan to make necessary changes?
Triple bottom line