Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: netbudy65

LEED-Green-Associate LEED Green Associate Exam (LEED GA) Questions and Answers

Questions 4

The Energy Policy Act of 1992 (EPAct of 1992), 2005 is a baseline standard for the credit category of

Options:

A.

Water Efficiency

B.

Sustainable Sites

C.

Energy and Atmosphere prerequisite

D.

Indoor Environmental Quality

Buy Now
Questions 5

What occurs when light from a parking area spreads and surplus lighting spills beyond the project boundary?

Options:

A.

Light trespass

B.

Provision of adequate lighting for the project

C.

Decrease in stress to nocturnal animals

D.

Light division

Buy Now
Questions 6

Which of the following is a type of quality transit in LEED?

Options:

A.

Taxi

B.

Bicycle

C.

Motorcycle

D.

Single passenger car

Buy Now
Questions 7

An owner is looking to update the interior materials of the office while promoting a healthier indoor work environment using LEED strategies. During the materials specification, which of the following strategies can the owner take in order to achieve this goal?

Options:

A.

Specify salvaged materials

B.

Specify low-cost materials

C.

Specify low-emitting materials

D.

Specify high solar reflectance materials

Buy Now
Questions 8

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

Options:

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect

Buy Now
Questions 9

The interior of a hotel is under renovation. The project designer would like to incorporate adaptive reuse. Which of the following strategies would accomplish this goal?

Options:

A.

Relocate to a used building

B.

Reuse the current wood floors as wall panels

C.

Use reconditioned office equipment

D.

Convert the rooms into residential apartments

Buy Now
Questions 10

During which stage of a project is implementation of the Integrative Process most effective in improving performance?

Options:

A.

Operation

B.

Early de sign

C.

Construction

D.

Construction document

Buy Now
Questions 11

Materials that would otherwise be discarded but are incorporated into a new building are considered to be

Options:

A.

reused materials

B.

local materials

C.

recycled materials

D.

renewable materials

Buy Now
Questions 12

A developer has asked the building designer to incorporate a landscape irrigation system using the building's graywater in order to earn LEED points. Which is the most appropriate source of graywater for this use?

Options:

A.

Urinal

B.

Toilet

C.

Janitor sink

D.

Bathroom sink

Buy Now
Questions 13

The LEED reviewer advised a project team that an inappropriate rating system was chosen for a newly constructed school in operation for one year and undergoing minor improvements. What should the project team have done differently to avoid this error?

Options:

A.

Allow the LEED Project Administrator sole responsibility to review the appropriate rating system for the project

B.

Select LEED for Schools New Construction and Major Renovations Rating System, as this project is classified as a school

C.

Select LEED for Existing Buildings: Operations and Maintenance Rating System, as the Operational and Maintenance phase has begun

D.

Review the appropriate rating system and determine the best adaptation to use with consultation from U.S. Green Building Council

Buy Now
Questions 14

Which of the following plans is implemented after occupancy?

Options:

A.

Value Engineering

B.

Stormwater Pollution Prevention

C.

Green Cleaning

D.

Fundamental Commissioning (Cx)

Buy Now
Questions 15

Volatile organic compounds (VOCs) negatively impact which of the following entities?

Options:

A.

Quality of daylight

B.

Quality of indoor air

C.

Durability of a product

D.

Ability to recycle a product

Buy Now
Questions 16

Which of the fallowing projects is eligible for LEED for Building Operations and Maintenance; Existing Buildings?

Options:

A.

A two-story LEED certified apartment building

B.

A park adjacent to a LEED certified building

C.

An existing single-family home that is LEED certified

D.

An existing LEED certified building located on a college campus

Buy Now
Questions 17

Which of the following benefits could result from achieving LEED certification for a building?

Options:

A.

Preferred public parking

B.

Increased waste to landfills

C.

Qualification for tax rebates

D.

Dedicated public transportation infrastructure

Buy Now
Questions 18

A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called

Options:

A.

life-cycle costing

B.

value engineering

C.

integrated design

D.

life-cycle assessment

Buy Now
Questions 19

At what phase should the charrette take place?

Options:

A.

Post commissioning

B.

During the design process

C.

At the Beginning of the project

D.

During the construction process

Buy Now
Questions 20

In the commercial LEED Rating System, which point range will achieve the Certified level of certification?

Options:

A.

30-39 points

B.

40-49 points

C.

50-59 points

D.

60-69 points

Buy Now
Questions 21

Which Of the following is an example Of Integrative process?

Options:

A.

Judicious use of recyclable materials during construction

B.

Rapid incorporation of design changes during construction

C.

Ongoing evaluation of feedback mechanisms during building operation

D.

Conscientious maintenance of building equipment during building operation

Buy Now
Questions 22

When should the Commissioning Authority (CxA) be brought onto the project team?

Options:

A.

At the end of Design Development (DD)

B.

Early in the Schematic Design (SD) phase

C.

Once Construction Administration (CA) begins

D.

Early in the Post-Occupancy Evaluation (POE)

Buy Now
Questions 23

Which of the following is an effective way to identify occupant comfort issues in a space based on LEED best practices?

Options:

A.

Install energy meters in the building

B.

Discuss potential issues with building owner

C.

Conduct an occupant comfort survey with all building occupants

D.

Wait for occupants to alert facilities management team of issues

Buy Now
Questions 24

Waste water from kitchen sinks is considered blackwater unless

Options:

A.

it is for use in toilets

B.

local codes state otherwise

C.

it is only used for drip irrigation

D.

a CIR is submitted and approved

Buy Now
Questions 25

Light colored paving and cool roofs are terms referring to materials with

Options:

A.

lower emissivity and lower albedo

B.

lower emissivity and higher albedo

C.

higher emissivity and lower albedo

D.

higher emissivity and higher albedo

Buy Now
Questions 26

Which of the following strategies is considered an approach to land management that mimics natural systems and manages rainwater as close to the source as possible?

Options:

A.

Xeriscaping

B.

Passive Design

C.

Evapotranspiration

D.

Low-Impact Development

Buy Now
Questions 27

What is the percentage rule when making a decision on the rating system that is most appropriate to use for a project?

Options:

A.

30/70 rule

B.

40/60 rule

C.

50/50 rule

D.

60/40 rule

Buy Now
Questions 28

Which of the following plans is implemented after occupancy?

Options:

A.

Green Cleaning

B.

Value Engineering

C.

Fundamental Commissioning (cx)

D.

Stormwater Pollution Prevention

Buy Now
Questions 29

A new tenant in an existing office building is pursuing LEED certification. The tenant would like to encourage alternative transportation methods. Which of the following items can be used to satisfy this request and achieve LEED Location and Transportation Credit?

Options:

A.

Provide underground parking

B.

Designate preferred parking for motorcycles

C.

Develop on a brownfield site after remediation

D.

Develop an alternative commuting incentive program

Buy Now
Questions 30

Which type of site Is appropriate for development of LEED projects?

Options:

A.

Floodplain

B.

Greenfield

C.

Brownfield

D.

Undeveloped

Buy Now
Questions 31

If a project has achieved 53 points and six of eight prerequisites, for what level of certification does the project qualify?

Options:

A.

None

B.

Gold

C.

Silver

D.

Certified

Buy Now
Questions 32

Which industry benchmarking tool is used for measuring ongoing energy performance?

Options:

A.

Bright Power's EnergyScoreCard

B.

U.S. Department of Energy's EnerCop

C.

EPA's ENERGY STAR Portfolio Manager

D.

U.S. Department of Energy's EnergyIQ

Buy Now
Questions 33

Which class of refrigerants contributes the most to ozone depletion potential (ODP)?

Options:

A.

Ammonia (NH3)

B.

Hydrofluorocarbons (HFCs)

C.

Chlorofluorocarbons (CFCs)

D.

Hydrochlorofluorocarbons {HCFCs}

Buy Now
Questions 34

Select the type of approach that promotes the conservation of Materials and Resources by linking elements in order to form relationships with their function

Options:

A.

Open Flow

B.

Closed Flow

C.

Open Systems

D.

Closed Systems

Buy Now
Questions 35

What is the scope of the LEED impact category component Protect Human Health from Direct Exposure to Negative Health Impacts?

Options:

A.

Building occupants during use and demolition phase of the building cycle, within the project boundary

B.

Occupants and construction crew during construction or renovation phase of the building cycle, within the project boundary

C.

Design and construction crew during the construction phase, within the project boundary and excluding its immediate surroundings

D.

Building occupants and design and construction crew during the construction phase and use phase ol the building cycle, within the project boundary and its immediate surroundings

Buy Now
Questions 36

Limiting the concentration of which of the following substances protects the health of construction personnel?

Options:

A.

Biomass

B.

Compostable materials

C.

vocs

D.

CFC refrigerants

Buy Now
Questions 37

Which of the following products would meet the Green Seal standards?

Options:

A.

Desks and cabinets

B.

Carpet and carpet pads

C.

Windows and window frames

D.

Custodial products and materials

Buy Now
Questions 38

A project has 16 employees working for four hours per day, 20 employees working six hours per day, and 10 employees working eight hours per day. What is the Full Time Equivalent (FTE) occupancy of the project?

Options:

A.

28

B.

33

C.

33

D.

46

Buy Now
Questions 39

Which of the following Is the recommended tool for the project team to utilize In order to determine the target certification level?

Options:

A.

Scorecard

B.

Credit Submittal Form

C.

Project CIR

D.

It is not possible to estimate certification level without complete drawings

Buy Now
Questions 40

Who is the most responsible for monitoring ongoing energy performance over the life of the building?

Options:

A.

LEED AP

B.

Contractor

C.

Facility Manager

D.

Commissioning (Cx) Agent

Buy Now
Questions 41

Which of the following team members should participate in the initial evaluation to determine which level of LEED certification to target?

Options:

A.

Owner

B.

Zoning Official

C.

Project Safety Officer

D.

Green Business Certification Inc. (GBCI) Certification Reviewer

Buy Now
Questions 42

An office without transit access can substantially reduce its transportation impact if

Options:

A.

ample parking spaces are provided

B.

the office is located at a major intersection

C.

workers are able to walk from the office to basic services

D.

green power is purchased to offset projected automobile travel

Buy Now
Questions 43

A project plans to build a campus of buildings. Which of the following strategies should the project team consider to reduce energy demand?

Options:

A.

Purchase carbon offsets

B.

Design buildings to shade each other

C.

Enroll in a demand response program

D.

Select HVAC equipment without refrigerants

Buy Now
Questions 44

Which of the following standards addresses guidance for sustainable construction in complying with building codes?

Options:

A.

ASHRAE 72

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Buy Now
Questions 45

An integrative process involves stakeholders identifying overlapping relationships, services and redundancies among systems. What does this result in?

Options:

A.

Reduced performance and reduced costs

B.

Increased performance and reduced costs

C.

Reduced performance and increased costs

D.

Increased performance and increased costs

Buy Now
Questions 46

Which factor increases the heat island effect on a project site?

Options:

A.

High albedo

B.

Light-colored surfaces

C.

Paved surfaces

D.

High solar reflectivity index

Buy Now
Questions 47

Which of the following Is a measure of energy use intensity?

Options:

A.

Daylighting and views

B.

Energy consumed per unit of floor space

C.

Systems with ENERGY STAR" requirements

D.

The amount of electricity a wind turbine can produce

Buy Now
Questions 48

A nine-story residential building includes 60% of the gross floor area within the project scope, Which rating system is the most appropriate for the LEED certification of this project?

Options:

A.

LEED AP Building Design and Construction: Multifamily Midrise

B.

LEED AP Building Design and Construction: Core and Shell Development

C.

LEED AP Building Design and Construction. Homes and Multifamily Low-rise

D.

LEED AP Building Design and Construction: New Construction and Major Renovation

Buy Now
Questions 49

Which of the following is a benefit of a building owner choosing to install a solar photovoltaic?

Options:

A.

Lower liabilities

B.

Heat Island Reduction

C.

Decreased upfront building cost

D.

Reduced greenhouse gas emissions

Buy Now
Questions 50

Which of the following factors contributes to improved general health of building occupants and construction workers?

Options:

A.

High VOC building materials

B.

Post-occupancy flush outs

C.

Application of construction management practices

D.

Low ventilation rates

Buy Now
Questions 51

Which of the following results from incorporating sustainable landscape design?

Options:

A.

Decreased maintenance costs

B.

Encouraged use of exotic plants

C.

Restored and regenerated habitat

D.

Increased use of pesticides and irrigation

Buy Now
Questions 52

Which of the following strategies can be used for improving Indoor Environmental Quality during construction?

Options:

A.

Monitor outdoor airflow

B.

Calibrate sensors

C.

Maintain clean interior spaces

D.

Use integrated pest management

Buy Now
Questions 53

The LEED Project team performs an initial review that indicates 34 credit points can be achieved from the credit categories. How many additional points would result in the project achieving LEED Silver?

Options:

A.

10 additional points

B.

15 additional points

C.

20 additional points

D.

30 additional points

Buy Now
Questions 54

Which of the following tracks the progress of construction waste management on a project?

Options:

A.

Value of material savings on the project

B.

Volume of recycled content in materials

C.

Cost of waste materials recycled

D.

Weight of waste material diverted

Buy Now
Questions 55

Relating to water efficiency in LEED. gallons per minute or liters per minute refers to the amount of

Options:

A.

stormwater runoff

B.

captured rainwater

C.

water used by flow fixtures

D.

water used by flush fixtures

Buy Now
Questions 56

During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?

Options:

A.

Increase the square footage of the building

B.

Maximize daylighting opportunities with properly sized and oriented windows

C.

Use valid survey protocols to assess occupants' satisfaction with the indoor environment

D.

Monitor and verity performance to ensure that building systems are functioning as designed

Buy Now
Questions 57

Which strategy for roof coverage best addresses both heat island effect and rainwater runoff from the roof only?

Options:

A.

100% vegetated

B.

100% high-albedo

C.

20% high-albedo and 80% conventional

D.

50% standing seam copper and 50% vegetated

Buy Now
Questions 58

When the project team develops the project and building construction budget, which of the following should be incorporated?

Options:

A.

Green power purchased from the local power company

B.

Time in the schedule for unique materials and systems

C.

Contingency allowances for additional research and analysis of options

D.

The future environmental impact of building maintenance operations

Buy Now
Questions 59

Which of the following narratives explains the relationship between prerequisites and credits for purposes of LEED certification?

Options:

A.

Not all credit categories have a prerequisite

B.

Prerequisites are mandatory and credits are optional

C.

Prerequisites are mandatory if credits are pursued in the specific category

D.

Credits are assigned the same base points and prerequisites are weighted

Buy Now
Questions 60

Which strategy can reduce potable water consumption?

Options:

A.

Install submeters

B.

Increase site imperviousness

C.

Harvest rainwater for reuse

D.

Use a solar hot water heater

Buy Now
Questions 61

What is the primary purpose of using low cubicle partitions in office buildings?

Options:

A.

To reduce Volatile Organic Compounds (VOCs) levels

B.

To reduce CO₂ levels

C.

To increase the spread of daylight

D.

To increase thermal comfort

Buy Now
Questions 62

Which of the following is an appropriate usage of U.S. Green Building Council (USGBC) terminology for a LEED project?

Options:

A.

LEED certified building

B.

LEED's certified building

C.

LEED Accredited Building

D.

LEED Registered, Gold Building

Buy Now
Questions 63

Open grid pavement tends to reduce

Options:

A.

native habitat

B.

heat island effects

C.

rainwater infiltration

D.

parking space requirements

Buy Now
Questions 64

Which of the following interior items contributes to a comfortable acoustic environment?

Options:

A.

Soft surfaces

B.

Wood cabinets

C.

Hollow metal doors

D.

Glass cubicle partitions

Buy Now
Questions 65

Which ASHRAE standard defines thermal comfort for building occupants?

Options:

A.

ASHRAE 55

B.

ASHRAE 189.1

C.

ASHRAE 62.1

D.

ASHRAE 90.1

Buy Now
Questions 66

A wood product that is certified by the Forest Stewardship Council (FSC) is guaranteed to be

Options:

A.

grown in a tropical forest

B.

harvested from a well-managed source

C.

packaged with environmentally friendly materials

D.

purchased from a LEED AP

Buy Now
Questions 67

Light trespass beyond the project boundary can be prevented by the use of

Options:

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

Buy Now
Questions 68

To reduce the use of potable water for irrigation, which of the following factors should be taken into consideration?

Options:

A.

Minimize pervious areas

B.

Minimize green roof area

C.

Maximize use of native species

D.

Maximize use of pervious pavement

Buy Now
Questions 69

Who completes and signs the credit templates for a project pursuing LEED certification?

Options:

A.

The Commissioning (Cx) agent

B.

The specified team member

C.

The certified LEED Reviewer

D.

The local authorities having jurisdiction

Buy Now
Questions 70

A new project is being built adjacent to a park with a 1/8 mi. (0.20 km) trail leading to an urban business district, which includes several retail shops and restaurants. This project qualifies for Location and Transportation Credits by

Options:

A.

maintaining open space

B.

reducing heat island effect

C.

providing pedestrian access

D.

encouraging physical activity

Buy Now
Questions 71

What is process water?

Options:

A.

Blackwater used for irrigation purposes

B.

Water used for industrial processes and building systems, such as cooling towers and chillers

C.

Domestic waste water composed 0t wash water from kitchens and bathrooms

D.

Spent or used water from a home, community, farm or industry that contains dissolved or suspended matter

Buy Now
Questions 72

Which of the following is a strategy that a design team should consider In order to decrease the Impact of a new construction project?

Options:

A.

Maximize views of the existing wetland

B.

Select native plants to provide habitat for local fauna

C.

Locate the project in an existing office park with ample parking

D.

Increase the project's footprint to maximize roof space for a solar array

Buy Now
Questions 73

Solar Reflectance Index (SRI) combines reflectivity with:

Options:

A.

Transmissivity

B.

Emissivity

C.

Absorptivity

D.

Conductivity

Buy Now
Questions 74

Which of the following water types is suitable for drinking?

Options:

A.

Graywater

B.

Greenwater

C.

Stormwater

D.

Potable water

Buy Now
Questions 75

Rainwater Management is a credit in which LEED v4 category?

Options:

A.

Water Efficiency

B.

Sustainable Sites

C.

Energy and Atmosphere

D.

Location and Transportation

Buy Now
Questions 76

What is the current standard LEED uses to determine the baseline for indoor water savings?

Options:

A.

Energy Policy Act (EPACT) of 1992. 2005

B.

ANSI 17024

C.

The local standard in which the project is located

D.

The Energy Savings and Industrial Competitiveness Act of 2013

Buy Now
Questions 77

What standard ensures adequate ventilation is supplied to building occupants?

Options:

A.

ASHRAE 55

B.

ASHRAE 62.1

C.

ASHRAE 90.1

D.

ASHRAE 189.1

Buy Now
Questions 78

Energy and Atmosphere Credit encompasses

Options:

A.

site selection, site design and environmental concerns

B.

integrative process, building loads and EQ

C.

building loads, energy performance management and EQ

D.

building loads, energy performance management and environmental concerns

Buy Now
Questions 79

A site with minimal hardscape that has a large permeable surface results in:

Options:

A.

Reduced rainwater runoff

B.

Preserved space for future development

C.

Increased heat island effect

D.

Protection of native plant species

Buy Now
Questions 80

Which of the following is the reason Regional Priority credits are awarded?

Options:

A.

To help meet economic goals

B.

To encourage exemplary performance

C.

To address local environmental issues

D.

To promote innovation in building design

Buy Now
Questions 81

Integrated Project Planning and Design is a prerequisite for which type of buildings?

Options:

A.

Retail

B.

Schools

C.

Healthcare

D.

Data Centers

Buy Now
Questions 82

What plumbing fixture eliminates water use?

Options:

A.

Ultrasonic toilet

B.

WaterSense labeled toilet

C.

Low-flow lavatory

D.

Composting toilet

Buy Now
Questions 83

What do team members enhance by collaboration during the integrative process?

Options:

A.

Project duration

B.

Life-cycle costs

C.

Construction costs

D.

Efficiency and effectiveness of systems

Buy Now
Questions 84

What element of design can be used to take advantage of natural ventilation, solar energy and daylight?

Options:

A.

Cool roof

B.

Facade treatment

C.

Building orientation

D.

LOW visible transmittance glazing

Buy Now
Questions 85

Which of the following options is a source of Scope 1 greenhouse gas emissions?

Options:

A.

On-site landfills

B.

Business travel

C.

Purchased electricity

D.

Employee commuting

Buy Now
Questions 86

ASHRAE 189.1 is an alternative compliance path to what building code?

Options:

A.

American National Standards Institute (ANSI)

B.

International Green Construction Code (IGCC)

C.

ASHRAE 90.1

D.

California's Title 24

Buy Now
Questions 87

Which strategy will help build consensus for a project's sustainability goals?

Options:

A.

Hosting a charrette

B.

Survey building occupants

C.

Circulating a project scorecard

D.

Including LEED language in project specifications

Buy Now
Questions 88

What is pre-consumer recycled content?

Options:

A.

Virgin material that is not utilized in production

B.

Waste material that is generated from factories

C.

Waste material that is generated by households or by commercial use

D.

Waste material that is diverted from the waste stream during the manufacturing process

Buy Now
Questions 89

A salvaged wood door from another site qualifies under what Materials and Resources sustainable criteria?

Options:

A.

Certified wood

B.

Materials reuse

C.

Bio-based materials

D.

Waste diversion

Buy Now
Questions 90

In order to earn LEED certification, a project must

Options:

A.

employ a LEED AP on its project team

B.

conduct a whole-building life-cycle assessment

C.

earn a minimum 0t 50 points or meet a prerequisite

D.

satisfy all prerequisites and earn a minimum number of points

Buy Now
Questions 91

The use of native plant species, captured rainwater and evapotranspiration controllers are all strategies that contribute to

Options:

A.

process water reduction

B.

stormwater runoff control

C.

outdoor water use reduction

D.

reducing graywater demand

Buy Now
Questions 92

Which of the following must a waste reduction, reuse and recycling program collect and measure?

Options:

A.

Excavated soil and land-clearing debris

B.

Hazardous materials leaving the building

C.

Recycled content 0t purchased office supplies

D.

Waste diverted through recycling and reuse

Buy Now
Questions 93

Teams organize and work as part of an integrative process by working

Options:

A.

With team members in a linear pattern

B.

in smaller groups with nonrepetitive processes

C.

in small groups and as a Whole With iterative processes

D.

with team members having individual commitments and tasks

Buy Now
Questions 94

All LEED rating systems include:

Options:

A.

110 base points plus five Innovation points and two Regional Priority points for a total of 117 points

B.

100 base points, plus six Innovation points and four Regional Priority points for a total of 110 points

C.

90 base points plus four Innovation points and six Regional Priority points for a total of 100 points

D.

110 base points plus six Innovation points and four Regional Priority points for a total of 120 points

Buy Now
Questions 95

LEED considers products to be environmentally preferable materials when they are

Options:

A.

cost effective

B.

transported by air rather than rail

C.

materials with more life-cycle impact

D.

locally extracted, manufactured and purchased

Buy Now
Questions 96

Which of the following has the highest energy consumption in a typical U.S. office building?

Options:

A.

Lighting

B.

Cooling

C.

Space Heating

D.

Water Heating

Buy Now
Exam Name: LEED Green Associate Exam (LEED GA)
Last Update: Sep 11, 2025
Questions: 320

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99