Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
Rainwater harvesting can be used for which of the following credits or prerequisites?
Which of the following people are required to be listed on the LEED project registration page?
The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?
The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the
In which of the following ways can a campus project using a Group Approach comply with Water Efficiency
Prerequisite, Building-Level Water Metering?
Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?
For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is
The compliant value of green cleaning products and materials is calculated using what factor?
A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?
What is the maximum distance between readings required to represent the illumination levels at the property perimeter to earn the Sustainable Sites Credit, Light Pollution Reduction?
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?
The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)
Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?
Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?
A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?
What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?
The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
A management method that could be included in a project's site management policy is the use of
Which of the following is an allowable method to increase cooling tower cycles of concentration?
What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?
A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?
A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?
For the Optimize Energy Performance Credit, ENERGY STAR® eligible buildings may earn
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be
completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most
appropriate one to use?
When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields
In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)
as determined by ASHRAE 52.2-2007 required for renovation activities?
A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?
An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?
Storage locations are required for which of the following recyclable materials?
A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?
The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to
equal or be greater than 5%. Which strategy can the team implement to achieve this goal?
A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?
The measures called out on the following site plan may contribute to the achievement of which LEED credits?
(Click on Exhibit)
Exhibit
In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection
Guidance, which rating system would be most applicable for this project?