Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: netbudy65

LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Questions 4

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

Options:

A.

Indoor Environmental Quality Credit, Acoustic Performance

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Optimize Energy Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Buy Now
Questions 5

Which strategy could be incorporated into the negotiations of a lease agreement between a tenant and building owner

to contribute towards earning a LEED credit?

Options:

A.

A lease renewal option prior to 10 years

B.

Discounted parking fees for first year of lease

C.

An energy payment plan where the tenant pays a flat rate on utilities through the building owner

D.

Energy purchase through the building owner's campus facility that produces renewable power to Green-e standards

Buy Now
Questions 6

A project team is pursuing certification for a performing arts center in an urban neighborhood. The project will earn one point from the Location and Transportation Credit, Surrounding Density and Diverse Uses. The project team is considering the Location and Transportation Credit for Reduced Parking Footprint. Which of the following needs to be included in the credit calculation?

Options:

A.

The project is located in an area without a code minimum and cannot meet this credit

B.

A 20% reduction in the number of parking spaces from the calculated base ratio of the performing arts center

C.

Existing on-street parking spaces in the public right-of-way along the street in front of the project's main entrance

D.

Existing parking spaces in a privately-owned parking deck being leased to the project staff that are 1/8 mi.

(0.40 km) away

Buy Now
Questions 7

A project team is implementing a strategy that controls the admission of natural light into the office space being developed. To which credit can this contribute?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Thermal Comfort

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Optimize Energy Performance

Buy Now
Questions 8

A project seeking to achieve Indoor Environmental Quality Credit, Low Emitting Materials has outdated certifications demonstrating that the wall and ceiling paint are low emitting materials. What should the LEED AP do?

Options:

A.

Unattempt the credit

B.

Submit documentation as is

C.

Request that the room be repainted with compliant paint

D.

Obtain current certifications for the wall and ceiling paints

Buy Now
Questions 9

What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

Options:

A.

25%

B.

50%

C.

75%

D.

90%

Buy Now
Questions 10

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Buy Now
Questions 11

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Buy Now
Questions 12

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

Options:

A.

Water-Related Systems

B.

Energy-Related Systems

C.

Indoor Air Quality Systems

D.

Waste Management Systems

Buy Now
Questions 13

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Buy Now
Questions 14

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

Options:

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Buy Now
Questions 15

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

Options:

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier

B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier

C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier

D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier

Buy Now
Questions 16

Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?

Options:

A.

Location and Transportation Credit, Bicycle Facilities;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance

B.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Quality Views

C.

Location and Transportation Credit, Bicycle Facilities;

Indoor Environmental Quality Prerequisite Minimum Indoor Environmental Quality Performance;

Indoor Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Access to Quality Transit;

Water Efficiency Credit, Indoor Water Use Reduction;

Indoor Environmental Quality Credit, Interior Lighting

Buy Now
Questions 17

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

Options:

A.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Buy Now
Questions 18

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.

Minimum number of parking spaces required by the local zoning code

B.

Maximum dimensions for on-street parking spaces allowed by the local zoning code

C.

Minimum number of electric vehicle charging spaces required by the local zoning code

D.

Maximum number of levels in structured parking garages allowed by the local zoning code

Buy Now
Questions 19

Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?

Options:

A.

Only the design team members

B.

Owner, designer, and contractor

C.

All principal project team members

D.

Project team members with LEED® Credentials

Buy Now
Questions 20

The use of MERV 13 (F7) air filters is required to obtain what credit?

Options:

A.

Energy and Atmosphere Credit, Advanced Energy Metering

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

D.

Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan

Buy Now
Questions 21

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Buy Now
Questions 22

Which of the following would achieve an exemplary performance credit?

Options:

A.

Conducting two goal setting workshops

B.

Demonstrating a 55% potable water savings

C.

Achieving an 80% parking capacity reduction

D.

Signing a one-year contract for renewable energy

Buy Now
Questions 23

A project consists of both retail and office space. When deciding which LEED Interior Design and Construction rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space, then the rating system should not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system should be used

C.

If a rating system is appropriate for 50% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Buy Now
Questions 24

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

Options:

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

Buy Now
Questions 25

A project has access to two alternative water sources. How should they determine which source to use where?

Options:

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first, such as toilet flushing or irrigation

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All sources should be treated to potable water standards and used to supplement the municipal supply

Buy Now
Questions 26

In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?

Options:

A.

Develop and implement a commissioning plan

B.

Review the contractor's submittals for compliance with design documents

C.

Verify the installation and performance of the systems being commissioned

D.

Review the owner's requirements and the basis of design for clarity and completeness

Buy Now
Questions 27

Which prerequisite and/or credits can be achieved by providing individual controls for lighting?

Options:

A.

Energy and Atmosphere Credit, Energy Use and Indoor Environmental Quality Credit, Interior Lighting

B.

Energy and Atmosphere Credit, Enhanced Commissioning and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

D.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Buy Now
Questions 28

Which of the following information is needed to document the non-structural elements that will be reused from the existing space in a LEED AP Interior Design and Construction project?

Options:

A.

Elevations and space plans

B.

A tracking spreadsheet and cut sheets

C.

Cut sheets and drawings indicating elements to be reused

D.

Drawings indicating elements to be reused and a tracking spreadsheet

Buy Now
Questions 29

According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing

building should identify

Options:

A.

lighting levels

B.

operational schedules

C.

transportation options

D.

thermal comfort ranges

Buy Now
Questions 30

A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.

Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?

Options:

A.

Green Seal Standard 11

B.

ANSI/ASHRAE Standard 62.1-2010

C.

ANSI/ASHRAE/IESNA Standard 90.1-2010

D.

South Coast Air Quality Management District (SCAQMD)

Buy Now
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: Sep 11, 2025
Questions: 100

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99