LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Questions 4

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Buy Now
Questions 5

Which of the following credits can be awarded an Innovation point for Exemplary Performance?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Low-Emitting Materials

C.

Indoor Environmental Quality Credit, Minimum Indoor Air Quality Performance

D.

Indoor Environmental Quality Credit, Acoustic Performance

Buy Now
Questions 6

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction. New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Options:

A.

Historic Building Reuse

B.

Building and Material Reuse

C.

Whole-Building Life-Cycle Assessment

D.

Renovation of Abandoned or Blighted Building

Buy Now
Questions 7

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

Options:

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Buy Now
Questions 8

What percentage of a building's surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

Options:

A.

5%

B.

10%

C.

25%

D.

50%

Buy Now
Questions 9

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

Options:

A.

Install a preferred drop-off lane for buses meeting the emission requirements

B.

Provide calculations showing that the average fleet bus meets the emission requirements

C.

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.

Document that all buses serving the project achieve a minimum green score of 30 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

Buy Now
Questions 10

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Buy Now
Questions 11

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Buy Now
Questions 12

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a ¼ mile (0.40 km) radius of the project boundary

B.

Measure densities within a ¾ mile (1.20 km) radius of the project boundary

C.

Measure densities within a ⅓ mile (0.53 km) radius of the project boundary

D.

Measure densities within a ½ mile (0.80 km) radius of the project boundary

Buy Now
Questions 13

How can the additional energy needed to increase the ventilation in a building be mitigated?

Options:

A.

Use economizer strategies

B.

Use higher-rated MERV filters

C.

Use high-pressure drop filters

D.

Reduce the size of the ventilation ductwork

Buy Now
Questions 14

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

Options:

A.

10%

B.

25%

C.

50%

D.

75%

Buy Now
Questions 15

Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

Options:

A.

Burning fossil fuels

B.

Smoking tobacco products

C.

Preparing non-organic foods

D.

Manufacturing toxic chemicals

Buy Now
Questions 16

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

Two Level (on, off)

B.

Three Level (on, 25%, off)

C.

Three Level (on, 50%, off)

D.

Three Level (on, 75%, off)

Buy Now
Questions 17

Which of the following Water Efficiency credits differ between LEED Building Design and Construction: New Construction and LEED Building Design and Construction: Healthcare?

Options:

A.

LEED Building Design and Construction: Healthcare has no Water Efficiency Credit, Cooling Tower Water Use

B.

LEED Building Design and Construction: New Construction has no Water Efficiency Credit, Cooling Tower Water Use

C.

LEED Building Design and Construction: Healthcare has additional appliance and process water requirements in Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

LEED Building Design and Construction: New Construction has additional appliance and process water requirements in Water Efficiency Prerequisite, Indoor Water Use Reduction

Buy Now
Questions 18

What is the system boundary that a building life cycle analysis must be defined to account for?

Options:

A.

Cradle-to-gate

B.

Cradle-to-grave

C.

Cradle-to-cradle

D.

Cradle-to-building

Buy Now
Questions 19

A construction manager is looking for a project management tool that offers energy management strategies, benchmarking software tools for buildings, and product procurement guidelines. Which of the following is recognized by U.S. Green Building Council to assist them?

Options:

A.

Green Seal

B.

SCAQMD

C.

ENERGY STAR®

D.

SMACNA

Buy Now
Questions 20

What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

Options:

A.

Quality

B.

Quantity

C.

Efficiency

D.

Performance

Buy Now
Questions 21

Which is a benefit of earning Regional Priority credits?

Options:

A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location

B.

The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues

C.

The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location

Buy Now
Questions 22

A core and shell project is located in a dense urban area that is known to have frequent fluctuations in the power supply grid (brown-outs). The project team is seeking LEED Platinum certification. Which credit should be pursued when considering the regional context?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Green Power and Carbon Offset

D.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Buy Now
Questions 23

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

Options:

A.

Locate the project ¼ mile (0.4 km) walking distance from two campus bus system lines (only accessible to campus students) with two stops each

B.

Locate the project ½ mile (0.8 km) walking distance from two bus lines with two stops each

C.

Locate the project ¼ mile (0.4 km) walking distance from a planned, funded, and partially complete subway station

D.

Locate the project ½ mile (0.8 km) walking distance from a planned, not funded commuter rail

Buy Now
Questions 24

In order to achieve the requirements of LEED, the Electrical Vehicle Supply Equipment (EVSE) must comply with:

Options:

A.

State, but not regional standards established for electrical vehicles operated within the state of vehicle operation

B.

Regional, state, or local standards for the electrical connectors to be used

C.

Level 1 charging capacity (110 volts AC)

D.

Manufacturer's standards established for electrical vehicles operated within the state of vehicle primary operation

Buy Now
Questions 25

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System's manual

D.

Integrated Project Delivery report

Buy Now
Questions 26

The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

Options:

A.

Utilizing a rain garden to manage the 98th percentile rainfall event

B.

Managing 100% of rainfall that falls within the project boundary

C.

Achievement of both Option 1. Percentile of Rainfall Events and Option 2. Natural Land Cover Conditions

D.

Utilizing a combination of both structural and non-structural measures to manage the 98th percentile rainfall event

Buy Now
Questions 27

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Buy Now
Questions 28

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using a Solar Photovoltaic System?

Options:

A.

Carbon offsets

B.

Daylighting strategies

C.

Passive solar strategies

D.

Produced electricity consumed on-site

Buy Now
Questions 29

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

One

B.

Two

C.

Four

D.

Six

Buy Now
Questions 30

What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

Options:

A.

Low-mercury lighting

B.

Direct-only overhead lighting

C.

Light sources with a CRI of 80 or higher

D.

Low fixture glare

Buy Now
Questions 31

Location and Transportation Credit, Reduced Parking Footprint calculations must include

Options:

A.

motorbike spaces

B.

on-street parking in public rights-of-way

C.

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.

parking outside the project boundary but used by the project

Buy Now
Questions 32

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Buy Now
Questions 33

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.

Verify installation and performance of the commissioned systems

B.

Review the building 10 months after substantial completion

C.

Verify that training requirements are completed

D.

Develop a systems manual for the commissioned systems

Buy Now
Questions 34

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen filling operations faucets

Buy Now
Questions 35

Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,

manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The

intent of this bonus is

Options:

A.

to shorten construction duration by reducing shipping times

B.

to avoid spreading products with potentially invasive non-native pests

C.

to incentivize the purchase of products that support the local economy

D.

to promote design with indigenous materials in order to maintain local aesthetic quality

Buy Now
Questions 36

Innovation credits for exemplary performance can be awarded for

Options:

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Buy Now
Questions 37

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Buy Now
Questions 38

A project design team for an elementary school project is attempting to achieve Innovation Credit, Innovation, Option 1. Innovation. Which of the following strategies would qualify?

Options:

A.

Pilot Credit from LEED Pilot Credit Library

B.

Exemplary Performance in Energy and Atmosphere Credit, Optimize Energy Performance

C.

Create educational kiosks and posters around the school with picture of building systems' sustainable features

D.

Implement a building as a learning lab curriculum that has been piloted in three other primary schools in the district

Buy Now
Questions 39

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.

Build a two-story fitness facility

B.

Change the grade to install a security fence

C.

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height

Buy Now
Questions 40

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

Options:

A.

Building Design and Construction: Schools

B.

Building Design and Construction: Healthcare

C.

Building Design and Construction: Hospitality

D.

Building Design and Construction: Data Centers

Buy Now
Questions 41

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Buy Now
Questions 42

When a project team sustainably develops a project site, the design should

Options:

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Buy Now
Questions 43

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Options:

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Buy Now
Questions 44

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

Options:

A.

Building-level energy metering

B.

Fundamental commissioning and verification

C.

Minimum energy performance

D.

Fundamental refrigerant management

Buy Now
Questions 45

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.

Site Development-Protect or Restore Habita

B.

Site Assessment

C.

Heat Island Reduction

D.

Light Pollution Reduction

Buy Now
Questions 46

Which of the following are all considered regular building occupants?

Options:

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Buy Now
Questions 47

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Options:

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Buy Now
Questions 48

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

Options:

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Buy Now
Questions 49

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

Options:

A.

5%

B.

3%

C.

2%

D.

8%

Buy Now
Questions 50

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Buy Now
Questions 51

What percentage of all energy usage is attributable to buildings?

Options:

A.

60%

B.

30%

C.

40%

D.

50%

Buy Now
Questions 52

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.

$90

B.

$225

C.

$360

D.

$405

Buy Now
Questions 53

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Buy Now
Questions 54

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

Options:

A.

Permanently reduce the energy consumption in the building by 5%

B.

Demonstrate submetering of the two highest electrical end uses

C.

Demonstrate a load shift reduction of 5% in the building

D.

Create a comprehensive plan for meeting a demand response event

Buy Now
Questions 55

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Buy Now
Questions 56

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

Options:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Buy Now
Questions 57

What is the sequence of the process for LEED certification?

Options:

A.

Submit documentation through LEED Online, Choose Rating System, Review, Register, Certify

B.

Submit documentation through LEED Online, Choose Rating System, Register, Review, Certify

C.

Choose Rating System, Register, Submit documentation through LEED Online, Review, Certify

D.

Choose Rating System, Register, Submit documentation through LEED Online, Certify, Review

Buy Now
Questions 58

LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

Options:

A.

Batch project

B.

Group project

C.

Master Site project

D.

Neighborhood project

Buy Now
Questions 59

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

Options:

A.

Historic district

B.

Priority designation

C.

Brownfield remediation

D.

Diverse uses

Buy Now
Questions 60

Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?

Options:

A.

Location and Transportation

B.

Energy and Atmosphere

C.

Sustainable Sites

D.

Regional Priority

Buy Now
Questions 61

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

Options:

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Alternate Daily Cover

Buy Now
Questions 62

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

Options:

A.

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Buy Now
Questions 63

Which of the following statements is correct when defining the project boundary?

Options:

A.

The LEED project boundary cannot include non-contiguous land

B.

The LEED project boundary cannot include more than one building

C.

The land associated with the project supports typical operation

D.

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Buy Now
Questions 64

Which of the following are control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan?

Options:

A.

Source control

B.

Material selection

C.

Contractor training

D.

Pre-construction meeting

Buy Now
Questions 65

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

Options:

A.

Track waste materials per occupant

B.

Track waste materials used on site

C.

Document total waste by project cost

D.

Document total waste per building floor area

Buy Now
Questions 66

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Buy Now
Questions 67

A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much

outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

Options:

A.

60,000 ft2 (5 574 m2) of outdoor space of which 15,000 ft2 (1 394 m2) must be vegetated

B.

60,000 ft2 (5 574 m2) of outdoor space of which 50,000 ft2 (4 645 m2) must be vegetated

C.

72,000 ft2 (6 689 m2) of outdoor space of which 18,000 ft2 (1 672 m2) must be vegetated

D.

72,000 ft2 (6 689 m2) of outdoor space of which 60,000 ft2 (5 574 m2) must be vegetated

Buy Now
Questions 68

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

Options:

A.

Exemplary Performance for a related credit

B.

Special Circumstances within a related credit

C.

Regional Priority Credit

D.

Innovation Credit

Buy Now
Questions 69

Which of the following is a biofuel that is considered renewable energy under Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.

Combustion of municipal solid waste

B.

Non-mill residue forestry biomass waste

C.

Wood coated with paints, plastics, or resins

D.

Animal waste

Buy Now
Questions 70

A community center will be built on a plot in two phases. Phase 1 will include the building with a pool and gymnasium, while Phase 2 will include the outdoor grass soccer fields. For Phase 1 to achieve certification, where can the project set the LEED boundary?

Options:

A.

Around Phase 1 and 2

B.

Around Phase 1 and 2 while committing to keep the Phase 2 grounds undisturbed

C.

Around Phase 1

D.

Around Phase 1 while committing to keep the Phase 2 grounds undisturbed

Buy Now
Questions 71

Which of the following will contribute to reducing the heat island effect?

Options:

A.

Artificial turf grass

B.

Intensive vegetated roof

C.

Steep sloped roof with initial SRI of 35

D.

Low sloped roof with initial Solar Reflectance Index (SRI) of 64

Buy Now
Questions 72

The intent of the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention is to £

Options:

A.

control erosion, noxious odors and landfill waste

B.

control erosion, landfill waste and excessive noise

C.

control erosion, waterway sedimentation and airborne dust

D.

control erosion, waterway sedimentation and noxious odors

Buy Now
Questions 73

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

LEED-AP-BD+C Question 73

Options:

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

Buy Now
Questions 74

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

LEED-AP-BD+C Question 74

Options:

A.

A, B, C

B.

B, C, D

C.

C, D, E

D.

A, B, D

Buy Now
Questions 75

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

Options:

A.

3,500,000 ft3 (99 108 m3)

B.

10,000,000 ft3 (283 168 m3)

C.

14,000,000 ft3 (396 435 m3)

D.

35,000,000 ft3 (991 089 m3)

Buy Now
Questions 76

Which energy efficient lamp type is free from mercury?

Options:

A.

Compact Fluorescent

B.

High Pressure Sodium

C.

Light Emitting Diode

D.

T-8 Fluorescent

Buy Now
Questions 77

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum percentage requirement for metering any individual energy end uses?

Options:

A.

Those that represent 10% or more of the total annual consumption of the building

B.

Those that represent 25% or more of the total annual consumption of the building

C.

Those that represent 20% or more of the total annual consumption of the building

D.

Those that represent 15% or more of the total annual consumption of the building

Buy Now
Questions 78

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Options:

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Buy Now
Questions 79

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Buy Now
Questions 80

Qualifying spaces for the Sustainable Sites Credit, Places of Respite must

Options:

A.

be located outdoors near a water feature

B.

be located at least 20 ft. (6 m) from a smoking area

C.

have provisions for direct medical care to be delivered in the area

D.

have options for shade or indirect sun for a portion of seating spaces

Buy Now
Questions 81

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in an office restroom

B.

A sink in a school classroom

C.

A sink in a hotel room bathroom

D.

A sink in a shared office restroom

Buy Now
Questions 82

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Buy Now
Questions 83

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

Options:

A.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Buy Now
Questions 84

Which of the following actions should be taken to ensure that project teams understand and prioritize the selection of materials compliant with the Materials and Resources Credit, Building Product Disclosure and Optimization?

Options:

A.

Include the material requirements in the project specifications

B.

Select locally sourced and manufactured materials

C.

Include all building materials in a whole-building life-cycle analysis

D.

Procure materials directly from raw material suppliers

Buy Now
Questions 85

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

Buy Now
Questions 86

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Buy Now
Questions 87

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

Options:

A.

3%

B.

1%

C.

2%

D.

4%

Buy Now
Questions 88

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

Options:

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Buy Now
Questions 89

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects

Options:

A.

energy loads

B.

lighting levels

C.

ventilation methods

D.

thermal comfort ranges

Buy Now
Questions 90

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Options:

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Buy Now
Questions 91

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Buy Now
Questions 92

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Buy Now
Questions 93

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

Options:

A.

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.

0.30 CFM/ft2 (1.5 (L/s)/m2)

Buy Now
Questions 94

The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is

Options:

A.

gate-to-gate

B.

cradle-to-gate

C.

cradle-to-grave

D.

cradle-to-cradle

Buy Now
Questions 95

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

Options:

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Buy Now
Questions 96

The results of a building energy model show that a building will consume 2,200,435 kilowatt-hours (kWh) per year (building is served solely by electricity). The building owner wants to achieve Energy and Atmosphere Credit, Green Power and Carbon Offsets. What is the minimum amount of green energy required to be purchased on an annual basis?

Options:

A.

770,152 kWh

B.

2,200,435 kWh

C.

550,109 kWh

D.

1,100,218 kWh

Buy Now
Questions 97

For minimum acoustic performance, peak-hour is defined as M

Options:

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

Buy Now
Questions 98

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

Options:

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Buy Now
Questions 99

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

Buy Now
Questions 100

What are the three phases within the Integrative Process Credit, Integrative Process?

Options:

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback

Buy Now
Questions 101

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

Options:

A.

Energy and Atmosphere Credit. Demand Response

B.

Energy and Atmosphere Credit. Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite. Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite. Building Level Energy Metering

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Sep 11, 2025
Questions: 337

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99