LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Questions 4

Which of the following Building Product Disclosure and Optimization credits under the Materials and Resources category would a project team achieve by using insulation material that is cradle-to-cradle V3 Gold certified?

Options:

A.

Material Ingredients, Option 2. Leadership Extraction Practices and Environmental Product Declarations, Option 1. Environmental Product Declarations (EPD)

B.

Material Ingredients, Option 1. Material Ingredient Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

C.

Sourcing of Raw Materials, Option 1. Raw Material Source and Extraction Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

D.

Sourcing of Raw Materials, Option 2. Leadership Extraction Practices and Material Ingredients, Option 2. Material Ingredient Optimization

Buy Now
Questions 5

When the project occupancy is not known, which method is recommended?

Options:

A.

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns

Buy Now
Questions 6

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.

Installing bioretention area

B.

Installing on-site renewable power generation facility

C.

Substituting impervious surface area with high-albedo paving materials

D.

Increase artificial turf on the roof

Buy Now
Questions 7

Which of the following is true regarding LEED Pilot Credits?

Options:

A.

Pilot Credits are not specific to the rating systems

B.

Pilot Credits can be attempted in the design review stage only

C.

A registered Pilot Credit must be replaced on the LEED project's scorecard if that pilot credit is removed from the Pilot Credit Library

D.

Pilot Credit feedback surveys must be completed

Buy Now
Questions 8

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

Options:

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Buy Now
Questions 9

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Buy Now
Questions 10

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

Options:

A.

Office projects

B.

Healthcare projects

C.

Warehouse projects

D.

Residential projects

Buy Now
Questions 11

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

Options:

A.

LEED BD+C: Retail

B.

LEED BD+C: Data Centers

C.

LEED BD+C: Core & Shell Development

D.

LEED BD+C: New Construction & Major Renovation

Buy Now
Questions 12

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Buy Now
Questions 13

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Buy Now
Questions 14

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.

site conditions

B.

massing and orientation

C.

plug and process load needs

D.

building envelope performance

Buy Now
Questions 15

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

Options:

A.

gate-to-gate assessment

B.

cradle-to-gate assessment

C.

cradle-to-grave assessment

D.

cradle-to-cradle assessment

Buy Now
Questions 16

In order for a product to contribute to Materials and Resources Credit, Building Product Disclosure and Optimization, Environmental Product Declarations, Option 1. Environmental Product Declaration, the product needs to be

Options:

A.

Forest Stewardship Council (FSC)-certified

B.

cradle-to-cradle certified

C.

third-party verified in a Corporate Sustainability Report (CSR)

D.

critically reviewed life-cycle assessment conforming to ISO 14044

Buy Now
Questions 17

What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location

and Transportation Credit, Access to Quality Transit?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Buy Now
Questions 18

A project team is planning a new office building in a cold climate. The team aims to achieve significant reductions in peak thermal loads. Which strategy should it apply to minimise peak thermal loads associated with infiltration?

Options:

A.

Increase wall-insulation thickness

B.

Install high-performance windows with low-emissivity coatings

C.

Seal potential air-leakage points and openings

Buy Now
Questions 19

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.

At the main entrance, 10 ft. (3 m) from the door

B.

At the main entrance, 25 ft. (7.5 m) from the door

C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Buy Now
Questions 20

What information must be provided to demonstrate compliance with the Owner’s Project Requirements (OPR)?

Options:

A.

Preliminary data collection

B.

Basis of Design (BOD)

C.

Design charrette plan

D.

Renewable Energy Certificates (RECs)

Buy Now
Questions 21

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

Options:

A.

Building Design and Construction: Schools

B.

Building Design and Construction: Healthcare

C.

Building Design and Construction: Hospitality

D.

Building Design and Construction: Data Centers

Buy Now
Questions 22

A large residential building project is exploring strategies to reduce reliance on the municipal water supply. The design must ensure that reused water meets local health and safety standards and remains feasible within the project’s operating budget.

Which of the following considerations should the project team prioritize to effectively implement the water-reuse system while maximizing water efficiency?

Options:

A.

Install water meters to monitor the use of reclaimed water

B.

Conduct a feasibility study regarding the availability of alternative water sources on-site

C.

Assess the energy use of water-treatment technologies

Buy Now
Questions 23

Which of the following strategies reflects a synergy between EQc2: Occupant Experience, Option 5. Lighting Environment and Energy and Atmosphere credits?

Options:

A.

Design open spaces to support community interaction and connectivity while preserving natural site topography and ecological balance

B.

Introduce light pipes into enclosed areas that do not have direct exposure to the exterior

C.

Use double-glazed windows to improve thermal comfort while ensuring uniform temperature distribution

Buy Now
Questions 24

What percentage of all energy usage is attributable to buildings?

Options:

A.

60%

B.

30%

C.

40%

D.

50%

Buy Now
Questions 25

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building's hand-washing sinks

Buy Now
Questions 26

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Options:

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Buy Now
Questions 27

Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?

Options:

A.

Select locally sourced and manufactured materials

B.

Procure materials directly from raw material suppliers

C.

Include all building materials in a whole-building life-cycle analysis

D.

Include the material requirements in the project specifications

Buy Now
Questions 28

What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?

Options:

A.

Schools

B.

Data centers

C.

Hospitality

D.

Warehouses and distribution centers

Buy Now
Questions 29

During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

Options:

A.

Energy meter location

B.

Equipment Maintenance Plan

C.

Owner's Project Requirements

D.

Coordination of other contractors

Buy Now
Questions 30

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

Options:

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an "anticipated" credit

Buy Now
Questions 31

Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,

manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The

intent of this bonus is

Options:

A.

to shorten construction duration by reducing shipping times

B.

to avoid spreading products with potentially invasive non-native pests

C.

to incentivize the purchase of products that support the local economy

D.

to promote design with indigenous materials in order to maintain local aesthetic quality

Buy Now
Questions 32

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Buy Now
Questions 33

Which of the following design features enhances accessibility for physical diversity in a mixed-use development project?

Options:

A.

Use high-contrast colours for signage and wayfinding

B.

Provide non-text diagrams and symbols for signage

C.

Create meeting spaces that accommodate mobility devices

Buy Now
Questions 34

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Buy Now
Questions 35

Which site preparation and construction method contributes to earning the Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.

Reuse excavated soil and land-clearing debris

B.

Implement in situ soil remediation and post removal of the existing concrete pavement

C.

Salvage and recycle 50% of the existing materials (based on volume) generated during site demolition for three material streams

D.

Ensure reduction of pollution from construction activities by using airborne dust generation capture systems

Buy Now
Questions 36

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.

$90

B.

$225

C.

$360

D.

$405

Buy Now
Questions 37

Innovation credits for exemplary performance can be awarded for

Options:

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Buy Now
Questions 38

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

Options:

A.

Locate the project ¼ mile (0.4 km) walking distance from two campus bus system lines (only accessible to campus students) with two stops each

B.

Locate the project ½ mile (0.8 km) walking distance from two bus lines with two stops each

C.

Locate the project ¼ mile (0.4 km) walking distance from a planned, funded, and partially complete subway station

D.

Locate the project ½ mile (0.8 km) walking distance from a planned, not funded commuter rail

Buy Now
Questions 39

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

Options:

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Buy Now
Questions 40

When should collaboration start for the integrative process?

Options:

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Buy Now
Questions 41

A real estate development company plans to build a mixed-use facility in an urban area. Which of the following strategies should the developer implement to support the local economy?

Options:

A.

Provide location-efficient affordable housing

B.

Provide workforce training

C.

Employ individuals from the local community

Buy Now
Questions 42

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Buy Now
Questions 43

In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?

Options:

A.

Install natural-gas boilers as a backup heating source

B.

Plan for an electric heat-pump water-heating system

C.

Integrate rooftop solar panels to generate renewable electricity on-site

Buy Now
Questions 44

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

Options:

A.

98th percentile

B.

85th percentile

C.

95th percentile

D.

100th percentile

Buy Now
Questions 45

A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Buy Now
Questions 46

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

LEED-AP-BD+C Question 46

Options:

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

Buy Now
Questions 47

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.

Ground-source heat pumps

B.

Tidal-based electrical production

C.

Municipal solid waste combustion

D.

Passive solar and daylighting strategies

Buy Now
Questions 48

Which is a benefit of earning Regional Priority credits?

Options:

A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location

B.

The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues

C.

The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location

Buy Now
Questions 49

What are the requirements of commercial projects for long-term bicycle storage under Location and

Transportation, Bicycle Facilities - Bicycle Storage and Shower Rooms?

Options:

A.

Provide for at least 5% of all regular building occupants, with no less than four storage spaces per building

B.

Provide for at least 10% of all regular building occupants, with no less than five storage spaces per building

C.

Provide for at least 15% of all regular building occupants, with no less than 10 storage spaces per building

D.

Provide for at least 25% of all regular building occupants, with no less than 10 storage spaces per building

Buy Now
Questions 50

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

Options:

A.

Taxi stand

B.

Ferry terminal

C.

Local bus stop

D.

Streetcar stop

Buy Now
Questions 51

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Options:

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Buy Now
Questions 52

Which of the following statements is correct when defining the project boundary?

Options:

A.

The LEED project boundary cannot include non-contiguous land

B.

The LEED project boundary cannot include more than one building

C.

The land associated with the project supports typical operation

D.

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Buy Now
Questions 53

Which of the following products are eligible for a WaterSense label?

Options:

A.

Tankless toilets

B.

Waterless urinals

C.

Public lavatory faucets

D.

Private lavatory faucets

Buy Now
Questions 54

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

Options:

A.

Over the entire year

B.

For the watering month

C.

For the average watering month

D.

Over the driest three-month portion of the year

Buy Now
Questions 55

An accessible garden planted with native plants contributes to the achievement of which of the following credit pairs?

Options:

A.

Sustainable Sites Credit, Sensitive Land Protection; Sustainable Sites Credit, Site Development - Protect or Restore Habitat

B.

Sustainable Sites Credit, Open Space; Sustainable Sites Credit, Rainwater Management

C.

Water Efficiency Credit, Water Metering; Sustainable Sites Credit, Tenant Design and Construction Guidelines

D.

Location and Transportation Credit, Surrounding Density and Diverse Uses; Sustainable Sites Credit, Site Assessment

Buy Now
Questions 56

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Buy Now
Questions 57

Which of the following descriptions defines an Environmental Product Declaration (EPD) in the context of MRc4: Building Product Selection and Procurement?

Options:

A.

A third-party certification that guarantees a product is free of harmful chemicals and pollutants

B.

A verified document that provides transparent and standardized information about a product’s environmental impacts

C.

A self-declared statement regarding a material’s recycled content and manufacturing process

Buy Now
Questions 58

The Chartered Institute of Building Services Engineers (CIBSE) Applications Manual 10 - 2005 provides guidance for which of the following?

Options:

A.

Replacing inefficient lighting fixtures

B.

Adopting natural ventilation as the sole servicing strategy

C.

Phasing out of equipment that uses CFC-based refrigerants

D.

Renovating with materials low in volatile organic compounds

Buy Now
Questions 59

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

Two Level (on, off)

B.

Three Level (on, 25%, off)

C.

Three Level (on, 50%, off)

D.

Three Level (on, 75%, off)

Buy Now
Questions 60

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.

At least two years prior to the date of project registration

B.

Within the past five years

C.

Within two years of the substantial completion of the project

D.

At least five years prior to the certification of the project

Buy Now
Questions 61

Which of the following characteristics are a requirement of a compliant water meter?

Options:

A.

Must be digital

B.

Must be permanently installed

C.

Must transmit data to a remote location

D.

Must be capable of storing data for 36 months

Buy Now
Questions 62

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

Options:

A.

1.05 gpf (4 lpf)

B.

1.19 gpf (4.5 lpf)

C.

1.23 gpf (4.66 lpf)

D.

1.32 gpf (5 lpf)

Buy Now
Questions 63

Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?

Options:

A.

Location and Transportation

B.

Energy and Atmosphere

C.

Sustainable Sites

D.

Regional Priority

Buy Now
Questions 64

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

Options:

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

Buy Now
Questions 65

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

LEED-AP-BD+C Question 65

Options:

A.

A, B, C

B.

B, C, D

C.

C, D, E

D.

A, B, D

Buy Now
Questions 66

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

Options:

A.

Materials and resources

B.

Location and site selection

C.

Regional priority and innovation

D.

Energy and water related systems

Buy Now
Questions 67

Which of the following strategies is essential for a project to comply with EQc2: Occupant Experience, Option 1. Biophilic Environment?

Options:

A.

Incorporate the five principles adapted from The Practice of Biophilic Design

B.

Encourage positive interactions between people and nature

C.

Select only the most relevant principles adapted from The Practice of Biophilic Design

Buy Now
Questions 68

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

Options:

A.

All entrances to the building must have entryway systems 10 ft. (3 m) long in the direction of travel

B.

All particle filters in the ventilation system must meet Comité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least 90% of the airflow

Buy Now
Questions 69

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.

Build a two-story fitness facility

B.

Change the grade to install a security fence

C.

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height

Buy Now
Questions 70

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

Options:

A.

10%

B.

25%

C.

50%

D.

75%

Buy Now
Questions 71

Which of the following is required when documenting a LEED Pilot credit?

Options:

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration

Buy Now
Questions 72

Which group of chemicals emitted by some building materials is linked to asthma, chronic obstructive pulmonary disease, and cancer?

Options:

A.

Nitrogen Oxides (NOx)

B.

Polyvinyl Chlorides (PVCs)

C.

Chlorofluorocarbons (CFCs)

D.

Volatile Organic Compounds (VOCs)

Buy Now
Questions 73

Which of the following goals does selecting low-emitting materials serve in the context of MRc3: Low-Emitting Materials?

Options:

A.

Increase thermal insulation

B.

Enhance indoor air quality

C.

Extend the lifespan of building materials

Buy Now
Questions 74

A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

Options:

A.

The selection of energy-efficient LED fixtures for all of the building's lighting

B.

The installation of an air-purifying facade material on the front entrance of the building

C.

The integration of rainwater management strategies to achieve a Regional Priority Credit

D.

The implementation of a comprehensive metering strategy to measure three individual energy end uses

Buy Now
Questions 75

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

Options:

A.

Three years of free parking for green vehicles

B.

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.

A permanent discounted parking rate of at least 20% for all green vehicles

D.

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Buy Now
Questions 76

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Buy Now
Questions 77

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

Options:

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Buy Now
Questions 78

EAp1: Operational Carbon Projection and Decarbonization Plan requires a 25-year forecast. What is the primary purpose of this forecast?

Options:

A.

Prove that the building will be net-zero energy

B.

Estimate utility-cost savings to secure project financing

C.

Map future carbon emissions as the local electrical grid is projected to become cleaner

Buy Now
Questions 79

What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

Options:

A.

Design

B.

Discovery

C.

Operations

D.

Construction

Buy Now
Questions 80

Which energy efficient lamp type is free from mercury?

Options:

A.

Compact Fluorescent

B.

High Pressure Sodium

C.

Light Emitting Diode

D.

T-8 Fluorescent

Buy Now
Questions 81

During the early design phase of a new commercial office building, what action should the project team take to reduce the Global Warming Potential (GWP) of refrigerants?

Options:

A.

Select an HVAC system that uses refrigerants with a GWP of 700 or less

B.

Delay addressing refrigerant concerns until the commissioning phase, when system performance can be evaluated

C.

Specify any HVAC system and offset refrigerant emissions through carbon credits later, if needed

Buy Now
Questions 82

Which of the following is a strategy to reduce waste produced by a project?

Options:

A.

Design-build

B.

Material reuse

C.

Alternative daily cover

D.

Custom design

Buy Now
Questions 83

A project's massing and site orientation can have a direct impact on which of the following prerequisites?

Options:

A.

Minimum Energy Performance

B.

Minimum Indoor Air Quality Performance

C.

Construction Activity Pollution Prevention

D.

Fundamental Commissioning and Verification

Buy Now
Questions 84

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Buy Now
Questions 85

A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

Options:

A.

Change the orientation of the design case building

B.

Optimize the slab depth of the design case building

C.

Decrease the gross floor area of the baseline building

D.

Increase the wall mass and types of windows in the baseline building

Buy Now
Questions 86

A new theater is being designed to enhance acoustical comfort for its audiences. One of the main challenges the design team faces is minimizing excessive reverberation. The team plans to incorporate various materials and design strategies to control sound reflections.

Which of the following design strategies should effectively enhance acoustical comfort?

Options:

A.

Install hard flooring surfaces throughout the theater

B.

Maximize the use of soundproof glass walls and windows

C.

Utilize ceiling baffles and wall panels made from sound-absorbing materials

Buy Now
Questions 87

A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project's location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

Options:

A.

Exemplary Performance is not available for Option 2

B.

15 uses, including two uses in each of the five categories

C.

15 uses, including at least one Food Retail and one Community Anchor use

D.

18 uses, including uses in at least four of the five use type categories

Buy Now
Questions 88

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

Options:

A.

Retail

B.

Hospitality

C.

Core and Shell Development

D.

New Construction

Buy Now
Questions 89

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

Options:

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

Buy Now
Questions 90

A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

Options:

A.

90,000 ft² (8,361 m²)

B.

There is no minimum

C.

80,000 ft² (7,432 m²)

D.

At least 50% of the surface area

Buy Now
Questions 91

A developer is building a new shopping mall in a temperate climate. The developer wants to reduce operating costs and improve occupant experience. Which design scheme should the project team present?

Options:

A.

A design that increases peak thermal loads in the office and administrative spaces

B.

A design that reduces the overall parking footprint and provides preferred parking for electric-vehicle charging

C.

A design with a narrow floor plate that maximizes daylight in retail areas and minimizes the need for electric lighting

D.

A design with a large roof that collects rainwater to reduce stormwater runoff

Buy Now
Questions 92

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Buy Now
Questions 93

A project includes an automatic transfer switch and controls that enable the building’s on-site renewable-energy systems, energy storage, and critical equipment to operate during a power outage. What is this capability called?

Options:

A.

Load management

B.

Islanding

C.

Demand response

Buy Now
Questions 94

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Buy Now
Questions 95

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

Options:

A.

all luminaires have full cutoff fixtures

B.

all luminaires have a minimum color temperature of 3500 K

C.

all luminaires meet acceptable fixture ratings for the project's Model Lighting Ordnance (MLO) lighting zone

D.

all luminaires are mounted at least three mounting heights from the lighting boundary

Buy Now
Questions 96

A community center will be built on a plot in two phases. Phase 1 will include the building with a pool and gymnasium, while Phase 2 will include the outdoor grass soccer fields. For Phase 1 to achieve certification, where can the project set the LEED boundary?

Options:

A.

Around Phase 1 and 2

B.

Around Phase 1 and 2 while committing to keep the Phase 2 grounds undisturbed

C.

Around Phase 1

D.

Around Phase 1 while committing to keep the Phase 2 grounds undisturbed

Buy Now
Questions 97

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Options:

Buy Now
Questions 98

A vegetated roof contributes to earning which of the following credits?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Sustainable Sites Credit, Site Assessment

D.

Sustainable Sites Credit, Light Pollution Reduction

Buy Now
Questions 99

Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?

Options:

A.

The square-footage-of-usable-space method

B.

The space-by-space method

C.

Glare rating index method

D.

Seasonal usage peaks method

Buy Now
Questions 100

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

Buy Now
Questions 101

What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

Options:

A.

Low-mercury lighting

B.

Direct-only overhead lighting

C.

Light sources with a CRI of 80 or higher

D.

Low fixture glare

Buy Now
Questions 102

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

Options:

A.

3,500,000 ft3 (99 108 m3)

B.

10,000,000 ft3 (283 168 m3)

C.

14,000,000 ft3 (396 435 m3)

D.

35,000,000 ft3 (991 089 m3)

Buy Now
Questions 103

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System's manual

D.

Integrated Project Delivery report

Buy Now
Questions 104

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

Options:

A.

Training requirements

B.

Allowable tolerance for facility operations

C.

Facility, system and assembly performance assumptions

D.

Environmental, energy efficiency and sustainability goals

Buy Now
Questions 105

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Buy Now
Questions 106

In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

Options:

A.

must be calculated using at least 20% from an alternative water source

B.

must be calculated using 100% potable water

C.

may be included or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

Buy Now
Questions 107

A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

Options:

A.

natural gas

B.

hot water at the main service point

C.

nothing, because the flat fee is included as part of the lease

D.

nothing, because the energy source is outside of the project's scope

Buy Now
Questions 108

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Questions 109

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

Options:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Buy Now
Questions 110

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

Options:

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

Buy Now
Questions 111

What is a common strategy to minimize thermal bridging in building design to reduce peak thermal loads?

Options:

A.

Incorporate continuous insulation throughout the building envelope

B.

Use heavier construction materials to delay heat transfer

C.

Install thicker wall assemblies with thermal breaks

Buy Now
Questions 112

What is the minimum percentage of gross floor area that must be complete for a project to use LEED BD+C: New Construction and Major Renovations?

Options:

A.

40%

B.

100%

C.

60%

Buy Now
Questions 113

What is the reference standard that defines the requirements for LEED energy modeling?

Options:

A.

ASHRAE 62.1-2010

B.

Core Performance Guide

C.

ASHRAE Advanced Energy Design Guide

D.

ASHRAE 90.1-2010 Appendix G

Buy Now
Questions 114

In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

Options:

A.

Zero

B.

One

C.

Two

D.

Three

Buy Now
Questions 115

What document allows a LEED AP to register a project and sign the Certification Agreement?

Options:

A.

Owner Confirmation of Agent Authority

B.

Architect Code of Professional Conduct

C.

Commissioning (Cx) Agent Construction Permit

D.

LEED AP Standard Form of Agreement Between Owner and Architect

Buy Now
Questions 116

A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?

Options:

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Low Emitting Materials

D.

Indoor Environmental Quality Credit, Daylight

Buy Now
Questions 117

Which of the following are all considered regular building occupants?

Options:

A.

Staff, primary/secondary students, volunteers, and residents

B.

Staff, primary/secondary students, higher education students, and residents

C.

Higher education students, retail customers, periodic volunteers, and visitors

D.

Residents, volunteers, retail customers, and staff

Buy Now
Questions 118

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

Options:

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Buy Now
Questions 119

Which of the following strategies can be used to reduce the internal load of a building?

Options:

A.

Decreasing lighting power

B.

Oversize the HVAC systems

C.

Install low reflective exterior facade

D.

Increase the insulating value of the glazing and window frame system

Buy Now
Questions 120

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

Options:

A.

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Buy Now
Questions 121

Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

Options:

A.

Retail

B.

Schools

C.

Healthcare

D.

Core and Shell

Buy Now
Exam Code: LEED-AP-BD+C