What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

One

B.

Two

C.

Four

D.

Six

Buy Now
Questions 5

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

Options:

A.

LTc3: Compact and Connected Development

B.

EAc1: Electrification

C.

WEc2: Enhanced Water Efficiency

Buy Now
Questions 6

Which energy efficient lamp type is free from mercury?

Options:

A.

Compact Fluorescent

B.

High Pressure Sodium

C.

Light Emitting Diode

D.

T-8 Fluorescent

Buy Now
Questions 7

Which of the following strategies can be used to reduce the internal load of a building?

Options:

A.

Decreasing lighting power

B.

Oversize the HVAC systems

C.

Install low reflective exterior facade

D.

Increase the insulating value of the glazing and window frame system

Buy Now
Questions 8

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Buy Now
Questions 9

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

Options:

A.

98th percentile

B.

85th percentile

C.

95th percentile

D.

100th percentile

Buy Now
Questions 10

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Which LEED v5 rating system is appropriate for this project?

Options:

A.

LEED for New Construction and Major Renovations

B.

LEED for Commercial Interiors

C.

LEED for Healthcare

Buy Now
Questions 11

The design team is comparing a conventional concrete frame with a mass-timber hybrid structure. When calculating the benefit for MRc2: Reduce Embodied Carbon, how does LEED treat the biogenic carbon of the mass-timber option?

Options:

A.

Subtract it from the upfront Module A1–A3 emissions to create a larger credit for the project

B.

Track it separately and count it as a benefit when sustainable harvesting is documented and Module C is included

C.

Exclude it because only fossil-fuel emissions from manufacturing and transportation are included

Buy Now
Questions 12

Which of the following products are eligible for a WaterSense label?

Options:

A.

Tankless toilets

B.

Waterless urinals

C.

Public lavatory faucets

D.

Private lavatory faucets

Buy Now
Questions 13

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

Options:

A.

Identify all end uses within the project scope, including fixtures and fittings

B.

Prioritise alternative water sources to offset overall water demand

C.

Require equipment specifications to align with the contract documents

Buy Now
Questions 14

Within the Indoor Environmental Quality credit category, which of the following design strategies can be used to enhance building resilience to extreme temperatures?

Options:

A.

External shading devices

B.

Tinted skylights

C.

High-performance glazing

Buy Now
Questions 15

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

Options:

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

Buy Now
Questions 16

For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

Options:

A.

33%

B.

20%

C.

40%

D.

18%

Buy Now
Questions 17

A project team is pursuing points under EAc3: Enhanced Energy Efficiency using a whole-building energy simulation method. When modeling a baseline design, which of the following inputs must be the same as proposed design inputs?

Options:

Buy Now
Questions 18

What Color Rendering Index (CRI) value meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

45

B.

85

C.

25

D.

65

Buy Now
Questions 19

Which of the following would be classified as a public use faucet?

Options:

A.

Patient room sink

B.

Hotel sink

C.

Dorm room sink

D.

School classroom sink

Buy Now
Questions 20

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.

Install glazing with a higher solar heat gain factor

B.

Install photovoltaic panels on the sides of the building

C.

Increase outdoor air intake quantities during summer months

D.

Recover waste energy through exhaust air energy recovery systems

Buy Now
Questions 21

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

Options:

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental ProductDeclarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Buy Now
Questions 22

A project team is designing a new mixed-use development that aims to achieve LEED certification. To encourage electric-vehicle use, the team plans to install EV charging stations in the parking garage. The project site is in a region where 70% of electricity comes from renewable sources.

To align with LEED strategies for sustainable transportation, what consideration should the project team prioritize when installing the EV charging stations?

Options:

A.

Availability of real-time energy-consumption monitoring at the charging stations

B.

Provision of free parking for EV users near the charging stations

C.

Number of charging stations in proportion to the total number of parking spaces

Buy Now
Questions 23

Which of the following filtration methods is recommended for an infection risk management mode to enhance indoor air quality (IAQ) in healthcare facilities?

Options:

A.

Activated carbon filtration

B.

Plate-and-frame filters

C.

Ultraviolet germicidal irradiation (UVGI)

Buy Now
Questions 24

In the context of Core and Shell projects, which of the following strategies effectively aligns tenant spaces with LEED goals for sustainability?

Options:

A.

Mandating quarterly indoor air quality assessments for tenant areas

B.

Implementing a shared lighting control system throughout the entire building

C.

Developing comprehensive tenant guidelines outlining sustainable practices

Buy Now
Questions 25

A project team is planning a new office building in a cold climate. The team aims to achieve significant reductions in peak thermal loads. Which strategy should it apply to minimise peak thermal loads associated with infiltration?

Options:

A.

Increase wall-insulation thickness

B.

Install high-performance windows with low-emissivity coatings

C.

Seal potential air-leakage points and openings

Buy Now
Questions 26

A project pursuing LEED BD+C certification is designed with an electric air-source heat pump as the primary heating system to meet EAp1: Operational Carbon Projection and Decarbonization Plan. However, the client is considering adding a small natural-gas boiler for backup heating during extreme weather.

To earn maximum points under EAp1 while maintaining heating-system reliability, what should the LEED AP recommend regarding supplemental heating?

Options:

A.

Design an all-electric supplemental heating system using electric-resistance elements or auxiliary heat-pump capacity to eliminate on-site fossil-fuel combustion

B.

Install a natural-gas boiler with automated controls that limit operation to extreme conditions and include provisions for future conversion to an all-electric system

C.

Implement a wood-pellet biomass boiler as secondary heating because it qualifies as carbon-neutral without penalizing on-site combustion

Buy Now
Questions 27

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

Options:

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an " anticipated " credit

Buy Now
Questions 28

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Buy Now
Questions 29

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

Options:

A.

A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site

B.

A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site

C.

A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock

D.

A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Buy Now
Questions 30

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

Options:

A.

Site ' s impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Buy Now
Questions 31

A Core and Shell developer pursuing the IPc2 Green Leases credit has drafted lease language. Which provision meets the intent of the credit for binding tenant sustainability commitments?

Options:

A.

Tenant shall submit quarterly energy and water consumption reports and achieve a minimum 50% waste diversion rate verified through waste hauler documentation.

B.

Owner will provide tenant with LEED design guidelines and green building best-practices handbook within 30 days of lease execution for reference.

C.

Tenant acknowledges that the building has achieved LEED certification and agrees to maintain awareness of sustainable building operations during occupancy.

Buy Now
Questions 32

What is the definition of the evapotranspiration rate?

Options:

A.

Evaporation of onsite reuse water

B.

Percentage of potable water usage for irrigation

C.

Water loss from evaporation in micro irrigation systems

D.

Amount of water loss in a vegetated surface in units of water depth

Buy Now
Questions 33

When attempting Regional Priority Credit, what must be provided in LEED Online?

Options:

A.

Latitude and longitude

B.

Heating and cooling degree days

C.

Climate zone

D.

ENERGY STAR® score

Buy Now
Questions 34

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.

Owner

B.

Contractor

C.

Occupants

D.

Facility manager

Buy Now
Questions 35

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.

Mercury containing lamps

B.

Contaminated soil or groundwater

C.

Asphalt construction waste

D.

Asbestos tile and glue

Buy Now
Questions 36

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.

Site Assessment

B.

Site Development - Protect or Restore Habitat

C.

Heat Island Reduction

D.

Light Pollution Reduction

Buy Now
Questions 37

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

Options:

A.

All entrances to the building must have entryway systems10 ft. (3 m) longin the direction of travel

B.

All particle filters in the ventilation system must meetComité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least90% of the airflow

Buy Now
Questions 38

Which of the following characteristics of a biophilic environment supports occupant quality of life?

Options:

A.

Direct line of sight to natural environments

B.

Use of artificial lighting throughout the space

C.

Mechanical ventilation systems

Buy Now
Questions 39

The project team is working to reduce the building ' s total energy costs in a cold climate. Which is the best strategy for the project team to consider?

Options:

A.

Additional envelope insulation

B.

Window shades

C.

Highly reflective roof

D.

Increased cooling efficiency

Buy Now
Questions 40

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.

Entirely outside any floodplain subject to a1% or greater chance of flooding in any given year

B.

Within afloodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a3% or greater chance of flooding in any given 10-year period

Buy Now
Questions 41

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.

site conditions

B.

massing and orientation

C.

plug and process load needs

D.

building envelope performance

Buy Now
Questions 42

Which of the following methods is the referenced standard for demonstrating compliance with EQp2: Fundamental Air Quality?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE Guideline 44

C.

ASHRAE 62.1-2022

D.

ASHRAE 90.1-2010

Buy Now
Questions 43

During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?

Options:

A.

Green roof

B.

Site conditions

C.

Massing and orientation

D.

Programmatic and operational parameters

Buy Now
Questions 44

Which of the following strategies can be used to decrease the envelope load of a building?

Options:

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Buy Now
Questions 45

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

Buy Now
Questions 46

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

Buy Now
Questions 47

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

Options:

A.

3%

B.

1%

C.

2%

D.

4%

Buy Now
Questions 48

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Buy Now
Questions 49

When a project team sustainably develops a project site, the design should

Options:

A.

increase water runoff

B.

maximize construction pollution

C.

remediate sites already in decline

D.

replace natural water flow patterns

Buy Now
Questions 50

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in an office restroom

B.

A sink in a school classroom

C.

A sink in a hotel room bathroom

D.

A sink in a shared office restroom

Buy Now
Questions 51

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

Options:

A.

Coordinate open space features during the construction phase

B.

Minimize the floor-area ratio (FAR) and accessibility for open space

C.

Design a parking and road footprint layout that is not near open land

D.

Coordinate open space features early during the site planning phase

Buy Now
Questions 52

Which of the following is a strategy to reduce waste produced by a project?

Options:

A.

Design-build

B.

Material reuse

C.

Alternative daily cover

D.

Custom design

Buy Now
Questions 53

Which group of chemicals emitted by some building materials is linked to asthma, chronic obstructive pulmonary disease, and cancer?

Options:

A.

Nitrogen Oxides (NOx)

B.

Polyvinyl Chlorides (PVCs)

C.

Chlorofluorocarbons (CFCs)

D.

Volatile Organic Compounds (VOCs)

Buy Now
Questions 54

What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?

Options:

A.

Schools

B.

Data centers

C.

Hospitality

D.

Warehouses and distribution centers

Buy Now
Questions 55

Landscape irrigation practices consume large quantities of potable water. By evaluating the project ' s outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

Buy Now
Questions 56

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Buy Now
Questions 57

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

Options:

A.

LEED V5, LEED for Neighborhood Development Conditional Approval

B.

LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood Development Certified Project

C.

LEED for Neighborhood Development Pilot, Stage 1 LEED for Neighborhood Development Pre-reviewed Plan

D.

LEED 2009, Stage 1 Conditional Approval of LEED for Neighborhood Development Plan

Buy Now
Questions 58

When should collaboration start for the integrative process?

Options:

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Buy Now
Questions 59

Which of the following design features enhances accessibility for physical diversity in a mixed-use development project?

Options:

A.

Use high-contrast colours for signage and wayfinding

B.

Provide non-text diagrams and symbols for signage

C.

Create meeting spaces that accommodate mobility devices

Buy Now
Questions 60

When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?

Options:

A.

Install EVSE that operates only during peak hours to ensure availability

B.

Integrate EVSE with demand-response programs and load-management strategies

C.

Install Level 1 charging stations with 120-volt service for all spaces

Buy Now
Questions 61

Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?

Options:

A.

Double-glazed windows

B.

Operable windows

C.

High-performance insulation

Buy Now
Questions 62

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.

Waste Management Plan

B.

Building orientation on the site

C.

Installation plan for perimeter control

D.

Minimum standards for equipment exhaust

Buy Now
Questions 63

For a project located on a greenfield site and attempting the Location and Transportation Credit, Sensitive Land Protection, Option 2, what must the development footprint avoid?

Options:

A.

Land that is within 200 ft. (61 m) of a local government wetland demonstration project

B.

Soils that are to be restored according to the SITES Guidelines and Performance Benchmarks 2009. Credit 7.3

C.

Areas not able to meet the criteria for Location and Transportation Credit LEED for Neighborhood Development Location

D.

Prime farmland as defined by the U.S. Code of Federal Regulations or local equivalent outside the US

Buy Now
Questions 64

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Buy Now
Questions 65

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

Options:

A.

Three years of free parking for green vehicles

B.

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.

A permanent discounted parking rate of at least 20% for all green vehicles

D.

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Buy Now
Questions 66

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

Options:

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Buy Now
Questions 67

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Buy Now
Questions 68

Which of the following is an example of nonpotable water that can be effectively used for landscape irrigation to improve water efficiency?

Options:

A.

Well water from a private borehole

B.

Dechlorinated swimming-pool water

C.

Street runoff taken directly from storm drains

Buy Now
Questions 69

Which of the following actions is aligned with EQc3: Accessibility and Inclusion?

Options:

A.

Provide lactation rooms or lactation pods

B.

Install automated door systems for all entryways

C.

Incorporate visual contrast between architectural elements

Buy Now
Questions 70

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Buy Now
Questions 71

A construction manager is looking for a project management tool that offers energy management strategies, benchmarking software tools for buildings, and product procurement guidelines. Which of the following is recognized by U.S. Green Building Council to assist them?

Options:

A.

Green Seal

B.

SCAQMD

C.

ENERGY STAR®

D.

SMACNA

Buy Now
Questions 72

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

Buy Now
Questions 73

A facility manager cleaning highly reflective paving material is

Options:

A.

unnecessarily wasting water

B.

reducing the heat island effect

C.

increasing the heat island effect

D.

lowering the Solar Reflectance Index (SRI)

Buy Now
Questions 74

Which of the following credit categories identifies environmental issues that are most relevant for a project ' s chapter area or country?

Options:

A.

Location and Transportation

B.

Energy and Atmosphere

C.

Sustainable Sites

D.

Regional Priority

Buy Now
Questions 75

Under LTc3: Compact and Connected Development, Option 1. Surrounding Density, how far from the project site should project teams measure surrounding density?

Options:

A.

0.5 mi. (0.80 km)

B.

1 mi. (1.61 km)

C.

0.25 mi. (0.40 km)

Buy Now
Questions 76

According to ASHRAE 90.1-2019, small commercial buildings under 25,000 ft² (2,323 m²) require energy monitoring:

Options:

A.

At 15-minute intervals for total project electricity use

B.

At least monthly for submetered end-use electricity

C.

At least monthly for whole-building energy use for each energy source

Buy Now
Questions 77

When planning a water-efficient landscape design, the designer should consider including

Options:

A.

potable water

B.

sprinkler system

C.

native vegetation

D.

permeable pavement

Buy Now
Questions 78

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

Options:

A.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Buy Now
Questions 79

Which of the following ventilation strategies is essential for maintaining acceptable indoor air quality while balancing energy use?

Options:

A.

Natural ventilation through operable windows

B.

Mechanical ventilation with heat recovery

C.

Underfloor air-distribution systems

Buy Now
Questions 80

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices

Buy Now
Questions 81

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a¼ mile (0.40 km) radiusof the project boundary

B.

Measure densities within a¾ mile (1.20 km) radiusof the project boundary

C.

Measure densities within a⅓ mile (0.53 km) radiusof the project boundary

D.

Measure densities within a½ mile (0.80 km) radiusof the project boundary

Buy Now
Questions 82

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

Options:

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

Buy Now
Questions 83

What is the reference standard that defines the requirements for LEED energy modeling?

Options:

A.

ASHRAE 62.1-2010

B.

Core Performance Guide

C.

ASHRAE Advanced Energy Design Guide

D.

ASHRAE 90.1-2010 Appendix G

Buy Now
Questions 84

Which of the following documents detail the ideas, concepts, and criteria determined to be important to the success of a building?

Options:

A.

Design review log

B.

Basis of design

C.

Integrated project delivery

D.

Owner ' s project requirements

Buy Now
Questions 85

A vegetated roof contributes to earning which of the following credits?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Sustainable Sites Credit, Site Assessment

D.

Sustainable Sites Credit, Light Pollution Reduction

Buy Now
Questions 86

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

Options:

A.

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Buy Now
Questions 87

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen filling operations faucets

Buy Now
Questions 88

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Buy Now
Questions 89

Which of the following organizations is responsible for providing alternative compliance paths that reflect regional variations for LEED credits?

Options:

A.

U.S. Environmental Protection Agency (EPA)

B.

International Energy Agency (IEA)

C.

U.S. Green Building Council (USGBC)

Buy Now
Questions 90

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced

Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.

Verify that training requirements are completed

B.

Develop systems manual for the commissioned systems

C.

Review contractor submittals for the commissioned systems

D.

Verify installation and performance of the commissioned systems

Buy Now
Questions 91

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Buy Now
Questions 92

The Chartered Institute of Building Services Engineers (CIBSE) Applications Manual 10 - 2005 provides guidance for which of the following?

Options:

A.

Replacing inefficient lighting fixtures

B.

Adopting natural ventilation as the sole servicing strategy

C.

Phasing out of equipment that uses CFC-based refrigerants

D.

Renovating with materials low in volatile organic compounds

Buy Now
Questions 93

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.

Platinum

B.

Gold

C.

Silver

Buy Now
Questions 94

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Options:

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Buy Now
Questions 95

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building ' s hand-washing sinks

Buy Now
Questions 96

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn ' t have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

Options:

A.

Contact another manufacturer that has a comparable product with an EPD

B.

Exclude the flooring from the LEED credit as non-compliant

C.

Request recycled content information, as the ISO 14040/44 LCA is not sufficient for compliance

D.

Use the ISO 14040/44 LCA information just like an EPD to complete the documentation for the LEED credit

Buy Now
Questions 97

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Buy Now
Questions 98

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction. New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Options:

A.

Historic Building Reuse

B.

Building and Material Reuse

C.

Whole-Building Life-Cycle Assessment

D.

Renovation of Abandoned or Blighted Building

Buy Now
Questions 99

A comprehensive rainwater management plan may include design elements such as

Options:

A.

artificial turf, bioretention pond, cisterns and hay bales

B.

cisterns, porous pavement, swales and vegetated roofs

C.

soil compaction, swales, vegetated roofs and xeriscaping

D.

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Buy Now
Questions 100

A commercial building aims to reduce potable-water use by utilizing alternative water sources for appropriate applications. The architect must plan water distribution efficiently while considering the quality and treatment requirements of each water source.

Which of the following strategies will efficiently reduce the building’s potable-water consumption while maintaining safe and appropriate water use?

Options:

A.

Use potable water for all purposes and retain alternative water sources only as backup supplies

B.

Use graywater for HVAC cooling-tower makeup water and harvested rainwater for drinking fountains

C.

Use graywater for potable applications after comprehensive treatment

Buy Now
Questions 101

Which of the following credits can be awarded an Innovation point for Exemplary Performance?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Low-Emitting Materials

C.

Indoor Environmental Quality Credit, Minimum Indoor Air Quality Performance

D.

Indoor Environmental Quality Credit, Acoustic Performance

Buy Now
Questions 102

What percentage of a building ' s surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

Options:

A.

5%

B.

10%

C.

25%

D.

50%

Buy Now
Questions 103

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Options:

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Buy Now
Questions 104

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

Options:

A.

A mall with an indoor atrium, featuring a reflective roof

B.

A parking lot that serves as the location for a monthly flea market

C.

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Buy Now
Questions 105

Operable windows contribute to resilient planning and design in extreme climate conditions by:

Options:

A.

Increasing the thermal mass of the building for heat retention

B.

Allowing natural ventilation to improve indoor air quality

C.

Facilitating seasonal thermal adaptation for occupants

Buy Now
Questions 106

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

Options:

A.

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Buy Now
Questions 107

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Buy Now
Questions 108

During the early design phase of a new commercial office building, what action should the project team take to reduce the Global Warming Potential (GWP) of refrigerants?

Options:

A.

Select an HVAC system that uses refrigerants with a GWP of 700 or less

B.

Delay addressing refrigerant concerns until the commissioning phase, when system performance can be evaluated

C.

Specify any HVAC system and offset refrigerant emissions through carbon credits later, if needed

Buy Now
Questions 109

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Buy Now
Questions 110

Which of the following is required when documenting a LEED Pilot credit?

Options:

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration

Buy Now
Questions 111

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using a Solar Photovoltaic System?

Options:

A.

Carbon offsets

B.

Daylighting strategies

C.

Passive solar strategies

D.

Produced electricity consumed on-site

Buy Now
Questions 112

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Buy Now
Questions 113

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Buy Now
Questions 114

A project ' s installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.

Compliance Path 2: Usage-Based Calculation; prescriptive compliance confirmation

B.

Compliance Path 2: Usage-Based Calculation; appliance water calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 1: Prescriptive Achievement; product cutsheets

Buy Now
Questions 115

The Lakeside Resort is located approximately 60 mi. (96.6 km) from the nearest town. Occupants are expected to arrive primarily by automobile, and existing public transportation consists of approximately one bus trip per day.

The project wants to earn as many Location and Transportation (LT) credits as possible. Which of the following strategies helps achieve points under LTc3: Compact and Connected Development, Option 2. Access to Transit?

Options:

A.

Offer a private shuttle that runs occupants into the nearest town and to local attractions with a minimum three-year commitment. Build a covered transit shelter for occupants to use while they wait for the shuttle.

B.

Implement a carpool incentive program that gives guests and employees incentives to carpool to the project and from the project to local attractions and into town.

C.

Count the bus trip(s) from the project to the local town and the bus trips occupants can connect with once they are in town. The project anticipates 70 possible rides per day on weekdays and 27 on weekends with all bus options combined.

Buy Now
Questions 116

The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities

B.

Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space

D.

Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Buy Now
Questions 117

A building in a rural area with an FAR of 1.7 is planning to pursue a point under SSc2: Accessible Outdoor Space. Which of the following criteria will help the project achieve the credit?

Options:

A.

Driveways designed with paver blocks

B.

A space dedicated to community gardens

C.

Covered car park

D.

A permanent and secure bicycle repair station

Buy Now
Questions 118

To ensure long-term energy efficiency and grid resilience, which strategy should the project team prioritise first?

Options:

A.

Provide a high-performance building envelope

B.

Enrol in a demand-response programme with the local utility

C.

Purchase 100% Renewable Energy Certificates to offset projected electricity use

Buy Now
Questions 119

A neighborhood housing development organization has dual goals, promoting occupant ' s health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization ' s dual goals?

Options:

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Low Emitting Materials

D.

Indoor Environmental Quality Credit, Daylight

Buy Now
Questions 120

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building ' s gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

Options:

A.

LEED BD+C: Retail

B.

LEED BD+C: Data Centers

C.

LEED BD+C: Core & Shell Development

D.

LEED BD+C: New Construction & Major Renovation

Buy Now
Questions 121

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project ' s mechanical engineer

D.

The owner or an owner ' s representative

Buy Now
Questions 122

What is the system boundary that a building life cycle analysis must be defined to account for?

Options:

A.

Cradle-to-gate

B.

Cradle-to-grave

C.

Cradle-to-cradle

D.

Cradle-to-building

Buy Now
Questions 123

How can a facility manager promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Avoid overcooling during warmer seasons

C.

Provide a constant temperature setpoint for the year

D.

Ask the cleaning contractor to turn off all of the lights after cleaning

Buy Now
Questions 124

During the early stages of a LEED project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected a paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.

IPc1: Integrative Design Process

B.

PRc1: Project Priorities

C.

EQc2: Occupant Experience

D.

MRc5: Construction and Demolition Waste Diversion

Buy Now
Questions 125

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

Options:

A.

Training requirements

B.

Allowable tolerance for facility operations

C.

Facility, system and assembly performance assumptions

D.

Environmental, energy efficiency and sustainability goals

Buy Now
Questions 126

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:

A.

At least75% of qualifying land areas within ¾ mile (1.20 km)are previously developed

B.

At least75% of qualifying land areas within ½ mile (0.80 km)are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Buy Now
Questions 127

For WEp1: Water Metering and Reporting, the intent is to identify opportunities to manage future water savings. Water metering should:

Options:

A.

Include total water consumption for potable and alternative water sources

B.

Include submeters for mechanical equipment

C.

Include only indoor water consumption including manufacturing processes

D.

Provide separate data for indoor and outdoor water consumption

Buy Now
Questions 128

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

Options:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Buy Now
Questions 129

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Options:

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All alternative water sources should be treated to potable water standards

Buy Now
Questions 130

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

Options:

A.

Local building code

B.

ASHRAE 62.1-2010

C.

International Mechanical Code 2012

D.

The ventilation code requiring the greatest volume of outside air

Buy Now
Questions 131

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Buy Now
Questions 132

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Oct 8, 2026
Questions: 454

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99