L4M3 Commercial Contracting Questions and Answers

Questions 4

Misrepresentation can be defined as a false statement of material fact made by one of the contracting parties which was intended to (and did) induce the other party to make the contract. What remedies are available in this instance to the innocent party?

Options:

A.

Contract is voidable and damages can be claimed

B.

Contract is not voidable but damages can still be claimed

C.

Contract is voidable and must be amended and performed

D.

Contract is not voidable and it is too late to take any action

Buy Now
Questions 5

A manufacturing company signed a contract with a raw material supplier. The contract includes a clause on liquidated damages in case of late delivery. Purchaser was obliged to pay after 30 days from delivery. Eventually raw material was delivered 1 week later than initial plan due to supplier’s slow production process. There is no defect in the delivered batch. Which of the following can be claimed by the manufacturing company?

Options:

A.

Rights to refunds or repairs

B.

Right of set-off

C.

Right of third party

D.

Right of extending payment

Buy Now
Questions 6

Which of the following is the international standard for labelling hazardous substances?

Options:

A.

GPS

B.

HSE

C.

CODEX STAN 1-1985

D.

GHS

Buy Now
Questions 7

Which of the following is a key feature of liquidated damage clauses?

Options:

A.

The amount of damage is predetermined

B.

Liquidated damage is a penalty

C.

The amount of liquidated damages must be exceptionally larger than the actual damages incurred

D.

The liquidated damages are non-negotiable

Buy Now
Questions 8

Which of the following is set down in statute as a liability that exists without any need to prove fault?

Options:

A.

Strict liability

B.

Current liability

C.

Contingent liability

D.

Non-current liability

Buy Now
Questions 9

Which of the following is an agreement between service provider and user that quantifies the minimum quality of service?

Options:

A.

Service charter

B.

Service guarantee

C.

SLA

D.

Service standard

Buy Now
Questions 10

Which of the following statement is true about one-off contract?

Options:

A.

Suppliers have many opportunities to improve the quality during the performance of one-off contract

B.

One-off contracts can be used for services and works

C.

Ad-hoc purchase is not a type of one-off purchase

D.

One-off contracts only apply to low-value, low-risk purchase

Buy Now
Questions 11

What are disadvantages of a buyer contracting on the supplier's terms? Select TWO that apply.

Options:

A.

Materials will not be changed without the buyer’s consent

B.

The buyer would not be subject to any indemnity clause obligations

C.

Title to goods may remain with the supplier until payment is received

D.

Goods received late will incur penalties for the supplier

E.

Prices may increase without notification to the buyer

Buy Now
Questions 12

A procurement manager is preparing a long-term contract with a major supplier. She decides to use the variable pricing arrangement using price indices. The payment terms describe the circumstances and mechanism where the price is allowed to change. In order to successfully manage this type of contract, the buying organisation should have...?

Options:

A.

Good market knowledge

B.

Selection of base year

C.

Value for money

D.

Economy of scale

Buy Now
Questions 13

Which of the following are among five 'pillars' of information assurance?

1. Recovery plan

2. Availability

3. Non-repudiation

4. Governance

Options:

A.

2 and 3 only

B.

1 and 2 only

C.

1 and 4 only

D.

3 and 4 only

Buy Now
Questions 14

Maximum Score: 1

Which of the following would be considered as advantages of an industry model form contract?

    It provides greater flexibility for negotiation

    It reduces the cost of contract development

    It is usually designed to be fair to both parties

    It removes the need for the buyer to understand it

Options:

A.

1 and 2 only

B.

2 and 3 only

C.

1 and 3 only

D.

2 and 4 only

Buy Now
Questions 15

Which of the following is a benefit to the buyer of using model form contracts?

Options:

A.

The terms used are advantageous to the buyer

B.

It reduces time and costs in developing a formal contract

C.

No legal advice is required as variations are not accepted

D.

Most suppliers are unfamiliar with the terms used

Buy Now
Questions 16

Which of the following is a disadvantage of using input specifications?

Options:

A.

It is difficult to assess suitability of each quotation

B.

It requires a more proactive approach to monitoring

C.

There is less opportunity for innovation

D.

There is no limit to the number of suppliers who can quote

Buy Now
Questions 17

Maximum Score 1

A service contract for cleaning is due for expiry after a five-year duration. Which of the following are good sources of data to create a specification for the new invitation to tender?

    Incumbent supplier

    Maintenance services

    Alternative suppliers

    Management information

Options:

A.

1, 2 and 3 only

B.

2, 3 and 4 only

C.

1, 3 and 4 only

D.

1, 2 and 4 only

Buy Now
Questions 18

Maximum Score: 1

Where a supplier is incentivised to deliver improvements that create added value for the buyer, this is described as what type of outcome?

Options:

A.

Lose-lose

B.

Lose-win

C.

Win-lose

D.

Win-win

Buy Now
Questions 19

Rochdale Ltd is looking for a new IT system to automate some of its operations. In designing the specification, procurement manager supposes that it should be done solely by the IT department who have deep expertise on this matter. Is procurement manager’s opinion appropriate?

Options:

A.

No, because challenging the user's demand is the role of procurement

B.

Yes, because designing complex specification would waste procurement manager’s time

C.

Yes, because procurement professional has no expertise in IT sector

D.

No, because designing complex specification could only be outsourced

Buy Now
Questions 20

Which of the following is an example of liquidated damages clause?

1. "In the event of a delay to the Offshore Installation Completion Date as per the Contract Schedule for which Contractor is solely responsible, Contractor shall pay to Company 0.25% per day of delay, subject to a maximum of 10% of the Initial Contract Price."

2. “If Seller breaches its obligation to deliver goods in accordance with the schedule provided for in this contract, Seller shall pay Buyer $x per day for each day of delay"

3. "The Contractor shall defend and hold the Buyer, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the Buyer."

4. "The contract is subjected to delay remedies. The amount will be agreed by both parties during the delivery"

Options:

A.

2 and 4 only

B.

1 and 3 only

C.

3 and 4 only

D.

1 and 2 only

Buy Now
Questions 21

Why would you use a non-disclosure agreement?

Options:

A.

To protect parties, where information has been shared that is not in the public domain

B.

To allow parties the freedom to disclose confidential information to the public domain

C.

To agree between parties what information is and is not confidential and what can be in the public domain

D.

To give parties permission to share all information in the public domain

Buy Now
Questions 22

A Service Level Agreement (SLA) is a formal statement of performance. Which of the following are aspects of a service level agreement?

A force majeure clause

Key performance indicators

A penalty clause for non-performance

The legal jurisdiction of the contract

Options:

A.

2 and 3 only

B.

2 and 4 only

C.

1 and 2 only

D.

1 and 4 only

Buy Now
Questions 23

Which of the following should be done by procurement professionals right after obtaining a pre-written specification for a critical item so that the added value will be the greatest?

Options:

A.

Evaluate tender or quotation

B.

Select the best supplier

C.

Challenge the used specification

D.

Issue invitation to tender or request for quotation

Buy Now
Questions 24

Which of the following is the most suitable model contract for car lift manufacturing?

Options:

A.

ITC

B.

FIDIC

C.

IMechE/IET

D.

CIPS

Buy Now
Questions 25

Which of the following statements is true about model form of contract?

Options:

A.

When model contracts are employed, there are no requirements for legal advice and input

B.

Model contract form's standard clauses often contain correct legal terminology without recourse to third party experts.

C.

The standard clauses of model contract forms give the offeror legal advantages over the offeree

D.

Only the publishers of model forms of contract can edit the clauses of these forms

Buy Now
Questions 26

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Hank’s pre-contractual assurance is most likely to be an example of which of the following?

Options:

A.

Inaccuracy in communication

B.

Threat

C.

Initial impossibility

D.

Fraudulent misrepresentation

Buy Now
Questions 27

Which of the following is used to detail the complex matter that may be verbiage to the main document?

Options:

A.

Contract variation

B.

Schedule

C.

Subcontracting

D.

Standard terms and conditions

Buy Now
Questions 28

Adornical Toys Ltd have recently declared their commitment to international labour standards. Karim is sourcing a supplier for a new range of wooden toys and is keen to ensure that the organisation's corporate objectives are met. Which of the following approaches could he include as part of his specification requirements to achieve this labour outcome?

Options:

A.

Certification to an ethical trading initiative

B.

Formally measure their carbon footprint

C.

Use ecologically certified raw materials

D.

Accreditation to waste reduction schemes

Buy Now
Questions 29

In a contract, express terms and implied terms may contradict on the same issues. Under which of the following circumstances, implied terms will override express terms?

Options:

A.

Implied terms are created by trade customs

B.

Contracting parties are silent on a matter that was not included in express terms

C.

No circumstances. Express terms always take precedence over implied terms

D.

Implied terms are created by law which prevents them to be overridden

Buy Now
Questions 30

Maximum Score 1

A construction company wishes to place the contract for the building of a new hotel to a principal contractor using a model form contract. Which of these is an advantage of using a ‘model form contract’?

Options:

A.

It avoids the requirement to create complex contracts each time but can be adapted to suit particular circumstances

B.

Formulae or indices can be included to assess any additional supplier’s claims for contract price adjustment

C.

Incentive payment terms can be included to reward the supplier for attainment of cost savings

D.

Legal advice is still required if significant amendments or variations are to be made to the contract

Buy Now
Questions 31

Maximum Score 1

An effective key performance indicator should be:

Options:

A.

Standardised, meaningful, achievable, realistic, typical

B.

Sustainable, measurable, analysed, realistic, timely

C.

Specific, measurable, achievable, realistic, timely

D.

Specific, meaningful, analysed, realistic, typical

Buy Now
Questions 32

A senior procurement specialist in UK is preparing a specification in which ISO standards are used to send to global suppliers. Is this action appropriate?

Options:

A.

No, the procurement specialist must use BSI standards instead

B.

Yes, evert specification must have ISO standards

C.

Yes, ISO standards are globally recognisable

D.

No, ISO standards are unfamiliar to global suppliers

Buy Now
Questions 33

Carillion Ltd is a major construction contractor in the UK. The company commits to continuous improvement and sets out a performance management program that is integrated across the organisational, individual, and supplier levels. To ensure that the suppliers acknowledge the program, every time negotiating the contract terms with suppliers, the procurement team of Carillion appends a performance management framework to the draft document as a schedule. Is the action of procurement team appropriate?

Options:

A.

No, because the framework will increase the complexity of the contract

B.

No, because the performance management should be solely developed by suppliers

C.

Yes, because the framework should have legal standing as a part of contract

D.

Yes, because Carillion wants to implement early supplier involvement

Buy Now
Questions 34

Which of the following is a key element for the development of a contract?

Options:

A.

Scoping specifications

B.

Contract management

C.

Budget approval

D.

Managing suppliers

Buy Now
Questions 35

In the application of price adjustment formulae, which of the following would be acceptable for a supplier to increase its selling price?

Options:

A.

Rising share prices

B.

Rising fuel costs

C.

Rising market expectations

D.

Rising incidence of defects

Buy Now
Questions 36

John Powers is the managing director of ACC Trading Ltd, which provides components to the automotive industry. His company has been providing number plates to Elite Motors Ltd for many years. As John Powers and Peter Ellis, the MD of Elite, have been friends for a long time, there has never been a formal contract agreed between the companies. Following a downturn in the market, Elite Motors Ltd has now been placed in administration. ACC recently delivered 200 number plates but have not received payment. As the number plates have been fitted to some vehicles, the administrators are being very slow to return them. Which clause in a formal agreement would have helped John?

Options:

A.

Force Majeure

B.

Retention of Title (Romalpa)

C.

Liquidated Damages

D.

Penalty Clause

Buy Now
Questions 37

Which of the following could be the last document in a 'battle of the forms'?

Options:

A.

Quotation

B.

Order acknowledgement

C.

Purchase order

D.

Invitation to Tender (ITT)

Buy Now
Questions 38

Various terms are used to qualify a party's obligations under contract. Which of the following gives absolute obligation?

Options:

A.

Reasonable endeavours

B.

Shall

C.

Best endeavours

D.

Should

Buy Now
Questions 39

Which of the following are examples of conformance specification? Select TWO that apply:

Options:

A.

Outcome-focused specification

B.

Statement of work

C.

Product sample

D.

Output-focused specification

E.

Technical drawing

Buy Now
Questions 40

Cleveland Insurance (Cleveland) offers a range of insurance services. The main software used in the call centre is a customer relationship management (CRM) system. Cleveland perceived an urgent need to replace the existing CRM system to deal with the increasing number of customers and services.

Urgent Digital Ltd (Digital) is one of the bidders of Cleveland’s ITT for designing, building and managing the new CRM system. Its bid team is led by Hank Irvine, its technical director. Hank realises that winning the Cleveland contract (valued at approximately £50M) will enhance his career. During discussions with Cleveland, Hank offers certain assurances regarding timescales for the project. He has not carried out any investigations into the viability of the timescales. Hank has little idea whether the timescales can be met.

Cleveland decides that Digital’s bid meets with its requirements, especially given the assurances in timescale offered by Hank, and decides to proceed with it, subject to a formal contract. Eventually, a formal contract is signed by both parties. The initial assurances given by Hank about the timing of the project are never going to be achieved and are at best grossly exaggerated.

Cleveland brought the case to the court and sought rescission of contract with Digital. Is Cleveland’s claim appropriate in this case?

Options:

A.

Yes, because Cleveland needs to seek rescission first before claiming for damages

B.

Yes, because both parties agreed with rescission of their contract

C.

No, because the work had been carried out which could not be returned

D.

No, because the contract does not include any provision on rescission

Buy Now
Questions 41

Consequences and actions that arise from certain KPI scores must be...? Select TWO that apply.

Options:

A.

Mutually agreed

B.

Deliberately omitted

C.

Documented

D.

Unilaterally imposed by the purchaser

E.

Terminated

Buy Now
Questions 42

Maximum Score 1

Which of the following are examples of a lack of ‘capacity’ to enter into a contract?

    A contracting party has a severe mental disorder

    A contracting party has failed to concentrate during negotiations

    A contracting party is 19 years of age

    A contracting party (corporation) has acted ‘ultra vires’ (beyond its defined legal powers)

Options:

A.

1 and 2 only

B.

1 and 4 only

C.

2 and 3 only

D.

2 and 4 only

Buy Now
Questions 43

Streaming Ltd is a music streaming provider based in the UK. The company is looking for extending its presence in the US. To achieve this, the company needs to outsource the data centre service to a local company. To monitor the performance, the procurement manager would like to introduce a service level agreement (SLA) to the data centre service provider. Which of the following should be included in the SLA?

1. System availability

2. The mean time to recover from system failure

3. The actual number of on-time service delivery

4. Dispute resolution procedure

Options:

A.

1, 3 and 4 only

B.

1, 2 and 4 only

C.

1, 2 and 3 only

D.

2, 3 and 4 only

Buy Now
Questions 44

A construction company wishes to place the contract for the building of a new hotel to a principal contractor using a model form contract. Which of these is an advantage of using a 'model form contract?'

Options:

A.

Incentive payment terms can be included to reward the supplier for attainment of cost savings

B.

Formulae or indices can be included to assess any additional supplier's claims for contract price adjustment

C.

It avoids the requirement to create complex contracts each time but can be adapted to suit particular circumstances

D.

Legal advice is still required if significant amendments or variations are to be made to the contract

Buy Now
Questions 45

Which of the following is most likely to reduce ITT preparation time while maintaining the clarity of tendering documents?

Options:

A.

Using request for quotation

B.

Standardising documentation whenever possible

C.

Monitoring usage

D.

Eliminating pre-qualification stage from all tendering processes

Buy Now
Questions 46

Which of the following are driving forces for increasing use of social and environmental criteria in specifications? Select TWO that apply.,

Options:

A.

Process efficiencies

B.

Stakeholder pressure

C.

Insufficient financial resources

D.

Scarcity of environmentally sustainable suppliers

E.

Carbon footprint measure

Buy Now
Questions 47

A school has a contract for the supply of fruit for break time. The school needs the fruit delivered by 10am every morning to be served at 10:30am. How would this best be covered in a commercial agreement?

Options:

A.

Note on each purchase order

B.

Pricing schedule

C.

Sales of Goods Act 1974

D.

Contractual term

Buy Now
Questions 48

The nature of the "Battle of the forms" is when both buyer and supplier are attempting to ...

Options:

A.

secure their own terms and conditions

B.

create a collaborative relationship

C.

create a performance specification

D.

form a joint contract

Buy Now
Questions 49

Which of the following are the conditions for revocation of offer to be valid?

1. The offeree has not received the offer yet

2. Revocation of offer must be communicated with the offeree

3. Revocation of offer must be sent via email

4. Offeree has not accepted the offer yet

Options:

A.

2 and 4 only

B.

1 and 4 only

C.

1 and 3 only

D.

2 and 3 only

Buy Now
Questions 50

Maximum Score 1

Buyer O has placed an order for the supply and installation of six new servers for a total amount of £600,000 from Supplier A. Which of the following could potentially be treated as examples of a liquidated damages clause within the contract for the supply of the servers?

    If the supplier delivers any of the servers late, £1,000 per server will be deducted from the order per day

    This contract is subject to delay remedies of £X - the amount to be agreed by both parties during delivery

    The sum for breach of the completion date for the order is £40,000 per day up to a maximum of 50% of the contract price

    If the performance of any of the servers degrades within five years, a full refund of £600,000 will be provided

Options:

A.

1 and 2 only

B.

3 and 4 only

C.

1 and 3 only

D.

2 and 4 only

Buy Now
Questions 51

Michelle contacts Hannah and asks her if she would be interested in purchasing her car for £2000. Hannah immediately takes £2000 to Michelle and says she wants to buy the car. Michelle subsequently refuses to proceed. Has the contract between Michelle and Hannah been made?

Options:

A.

No, because Michelle has rejected Hannah's offer on buying the car

B.

Yes, because both parties have full legal capability to enter into a contract

C.

Yes, by her performance Hannah has accepted Michelle's offer on selling the car

D.

No, because by refusing to proceed, Michelle rejects Hannah's counter-offer

Buy Now
Questions 52

A construction company is undertaking a housing development project. They need lots of bricks and other building materials, but the construction site doesn't have large area for storage of materials.Therefore, the company's suppliers must deliver the building materials with fixed quantity and at fixed time intervals. What type of contract is used between the construction company and its suppliers?

Options:

A.

Framework agreement

B.

Spot transaction

C.

One off contract

D.

Call off contract

Buy Now
Questions 53

Which of the following will be included in a conformance specification?

1. Brand names

2. Description of the operating environments

3. Chemical formulae

4. Required safety level

Options:

A.

1 and 2 only

B.

1 and 3 only

C.

1 and 4 only

D.

2 and 3 only

Buy Now
Questions 54

Which of the following are advantages of using a model form contract in negotiations between buyer and seller?

These contracts can save time in negotiations

Each contract is approved by the courts

These contracts are appropriate for all complexities

The contracts are well-known to both parties

Options:

A.

1 and 2

B.

2 and 3

C.

3 and 4

D.

1 and 4

Buy Now
Questions 55

XYZ Ltd and Engineer Corp signed a long-term supply contract in which both parties had agreed on performance targets. Recently, due to increased customer demands, XYZ Ltd realises that they should make changes to the contract with Engineer Corp with regards to performance management. These changes are approved and signed by both the buyer and seller. The changes to the contract are known as...?

Options:

A.

An amendment to the prime contract

B.

A stand-alone subcontract to the prime contract

C.

An appendix to the prime contract

D.

A separate counter-offer to the supplier

Buy Now
Questions 56

Which of the following should be applied when measuring frequency of on-time deliveries during a contract period?

Options:

A.

Qualitative assessment

B.

Numerical measure

C.

Binary measure

D.

Subjective measure

Buy Now
Questions 57

In the UK, Unfair Contract Terms Act 1977 regulates which of the following?

Options:

A.

Validity of a contract when it is formed on the basis of misrepresentation

B.

Rules regarding battle of the forms

C.

Effectiveness of contract terms in the standard terms and conditions

D.

Rule of offer and acceptance

Buy Now
Questions 58

Which of the following is a true statement on express and implied terms?

Options:

A.

Express terms always take precedent over implied terms

B.

Implied terms may derive from oral negotiations

C.

Express terms must always be in writing

D.

Express terms must be prepared by the party with expert knowledge

Buy Now
Questions 59

A tire manufacturer entered into a contract with a distributor. In the contract, the distributor is prohibited from selling the tire under the price list. The distributor must pay $5 for each tire sold in breach. The amount of $5 is known as...?

Options:

A.

Penalty

B.

Quantum meruit

C.

Liquidated damages

D.

Caveat Emptor

Buy Now
Questions 60

A company needs to source a product from oversea. It wants to overcome technical barrier to cross-border trade by using standards in the specification. Which of the following is most likely to be incorporated into that specification?

Options:

A.

National standards

B.

Company standards

C.

Brands

D.

International standards

Buy Now
Questions 61

Ellie is a junior buyer and her supplier asks her to use their contract terms for an order. Which of the following are clauses that may be included in the supplier contract that could pose a risk to Ellie's business? Select TWO that apply.

Options:

A.

If the contract lists the full specification

B.

If the contract includes supplier contact details

C.

If the contract includes a cash discount for early payment

D.

If the contract includes a price escalation clause

E.

If the contract includes exclusion clauses

Buy Now
Questions 62

Which of the following is the best definition of consideration in contract law?

Options:

A.

Full statement about something to provide

B.

The act of thinking carefully about one thing

C.

One thing given in exchange

D.

Formal discussion between people who are trying to reach an agreement

Buy Now
Questions 63

As a result of a global pandemic, a local hospital is facing significant patient capacity pressures and would like the construction of a new 50-bed ward to be prioritised and fully operational at the earliest opportunity. Which of the following pricing arrangements would support this aspiration?

Options:

A.

Incentivised contract pricing

B.

Fixed price economic adjustment pricing

C.

Time and materials arrangement pricing

D.

Penetration contract pricing

Buy Now
Questions 64

Curnoe Ltd supplied tyres to Garage Ltd. Garage Ltd agreed in the contract that for any specified breaches of contract, it would pay Curnoe Ltd £5 per tyre sold in breach. It subsequently sold tyres at below the listed price, which was one of the breaches mentioned in the contract. What is the £5 per tyre provision an example of?

Options:

A.

Quantum meruit

B.

Exclusion clause

C.

Liquidated damages

D.

Unliquidated damages

Buy Now
Questions 65

Which of the following is the contract provision that relieves the parties from performing their contractual obligations when certain circumstances like natural disasters, terrorist attacks, etc arise?

Options:

A.

Indemnity clause

B.

Liquidated damage clause

C.

Insurance clause

D.

Exclusion clause

Buy Now
Questions 66

Maximum Score: 1

When a company has decided to outsource part of its operation, the contract will need to include a number of key contract terms to minimise risk. Which of the following should be included?

    A confidentiality clause designed to protect either party

    A clause stating how long the service is to be outsourced

    A clause stating how long the employees can take for holiday

    A contract variation and price adjustment clause

Options:

A.

1 and 4 only

B.

1 and 2 only

C.

3 and 4 only

D.

2 and 4 only

Buy Now
Questions 67

Which of the following is likely to reduce risks of different rules regarding when offers and acceptance become effective between legal systems?

Options:

A.

Withdrawal protocol

B.

Letter of intent

C.

Time lapse

D.

Deemed receipt protocol

Buy Now
Questions 68

A Key Performance Indicator (KPI) states "Measure the effort exerted by the project team to control costs throughout the contract duration.” Is this KPI appropriate for measuring the management of contract costs?

Options:

A.

Yes, increased efforts to control costs ensure that costs will be managed effectively

B.

No, the metric is not sufficiently specific and measurable

C.

No, the project team is not responsible for managing costs

D.

Yes, the KPI is achievable, relevant and time-bound

Buy Now
Questions 69

Maximum Score 6

An urgent component requirement needs to be purchased to meet the timescales of a project. A supplier proposes using its standard terms and conditions. What risk to the buying organisation could this bring?

Options:

A.

A breach of competition laws

B.

Contract conditions that are favourable to the buyer

C.

A breach of the supplier’s internal financial controls

D.

Contract conditions that are favourable to the supplier

Buy Now