Weekend Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

ITFAS-Level-1 Inspection and Testing of Fire Alarm Systems Level I Exam Questions and Answers

Questions 4

Secondary power for the fire alarm primary power supply shall be tested under which load?

Options:

A.

Half load

B.

Maximum load

C.

Minimum load

D.

Supervisory load

Buy Now
Questions 5

Visible and audible trouble signals shall be indicated at which two of the following locations? (Choose two.)

Options:

A.

Alarm company office

B.

Emergency command center

C.

Fire alarm control unit

D.

Fire department headquarters

Buy Now
Questions 6

After the secondary power supply has operated the fire alarm system under quiescent load,the secondary power shall be capable of operating all alarm notification appliances for which length of time?

Options:

A.

5 minutes

B.

10 minutes

C.

1 hour

D.

24 hours

Buy Now
Questions 7

Which two of the following are needed to perform a periodic test of a projected beam type smoke detector? (Choose two.)

Options:

A.

Blocking the transmitter

B.

Introducing smoke

C.

Using a listed test switch

D.

Using an optical filter

Buy Now
Questions 8

Smoke detector activation in the ninth-floor elevator lobby shall activate which of the following functions?

Options:

A.

Alternate level recall

B.

Designated level recall

C.

Ninth-floor supervisory signal

D.

Ninth-floor trouble signal

Buy Now
Questions 9

Smoke alarms in one- and two-family dwellings shall be replaced when they fail to operate or they have been in place a maximum of how many years?

Options:

A.

5

B.

6

C.

10

D.

12

Buy Now
Questions 10

When a system must be fully or partially disabled for less than 8 hours, who must be notified when the system is restored?

Options:

A.

AHJ

B.

Fire department

C.

Insurance company

D.

System owner

Buy Now
Questions 11

Where smoke detectors are installed for protection during construction, they shall be cleaned and verified to be within the marked sensitivity range before which event?

Options:

A.

Final cleaning

B.

Final commissioning

C.

Pre-test of system

D.

Walk-through by engineer

Buy Now
Questions 12

Which is true of the phone lines on a Digital Alarm Communicator Transmitter (DACT) when no other methods are in use?

Options:

A.

Phone lines must be dedicated.

B.

Primary line should be connected to the PSTN.

C.

Test signal must be sent every 24 hours.

D.

Two separate phone lines are required.

Buy Now
Questions 13

Which instrument is commonly used to determine battery voltage and charging current?

Options:

A.

Battery tester

B.

Capacitance meter

C.

Multimeter

D.

Ohmmeter

Buy Now
Questions 14

At which height above the floor is the sound level measured for public and private modeaudible devices?

Options:

A.

2.5 feet (0.7 meter)

B.

5.0 feet (1.5 meters)

C.

7.5 feet (2.3 meters)

D.

8.0 feet (2.4 meters)

Buy Now
Questions 15

Which of the following situations is considered an impairment?

Options:

A.

Closed sprinkler valve

B.

Intelligible audibility

C.

Smoke detector within 4 feet of a return air opening

D.

Smoke detector within 4 feet of an air supply diffuser

Buy Now
Questions 16

Which of the following is the inspection frequency of the candela rating of visible appliances?

Options:

A.

Initial acceptance and quarterly

B.

Initial acceptance and semiannually

C.

Initial acceptance and if a malfunction occurs

D.

Initial acceptance and no further inspections

Buy Now
Questions 17

Load testing of the control unit's VRLA batteries reveals that they must be replaced. Which two of the following are requirements for the replacement of VRLA batteries? (Choose two.)

Options:

A.

Batteries shall be approved by the authority having jurisdiction.

B.

Batteries shall be listed by a nationally recognized testing laboratory.

C.

Batteries shall be marked with the month and year of manufacture.

D.

Batteries shall be the same make and model as those being replaced.

Buy Now
Questions 18

What must be done if the frequency of sensitivity testing is extended to 5 years?

Options:

A.

Detectors must be from the same manufacturer.

B.

Detectors must be located in the same area.

C.

Records of nuisance alarms shall be maintained.

D.

Records of serial numbers shall be maintained.

Buy Now
Questions 19

Which of the following signals takes highest priority?

Options:

A.

Pre-alarm

B.

Restoral

C.

Supervisory

D.

Trouble

Buy Now
Questions 20

When testing initiating devices, what is the maximum allowed time for the supervising station to verify receipt of the signal?

Options:

A.

60 seconds

B.

80 seconds

C.

90 seconds

D.

120 seconds

Buy Now
Questions 21

How often should a monitored fire alarm system be inspected for trouble signals?

Options:

A.

Weekly

B.

Monthly

C.

Semiannually

D.

Annually

Buy Now
Questions 22

An off-normal signal shall be initiated during which of the following travel distances of the valve control apparatus from its normal position?

Options:

A.

1/5

B.

1/4

C.

1/3

D.

1/2

Buy Now
Questions 23

How is a lead-acid battery inspected?

Options:

A.

By checking for damage

B.

By checking voltage

C.

By verifying specific gravity

D.

By verifying the charging circuit

Buy Now
Questions 24

Verification of a DACT’s trouble signal to the fire alarm shall be received within a maximum of how many minutes when the primary telephone line is disconnected?

Options:

A.

2

B.

3

C.

4

D.

5

Buy Now
Questions 25

After 15 years, what should be done with nonrestorable, spot-type heat detectors in lieu of testing?

Options:

A.

Replace 2 devices

B.

Replace 5 devices

C.

Replace 15 devices

D.

Replace all devices

Buy Now
Exam Code: ITFAS-Level-1
Exam Name: Inspection and Testing of Fire Alarm Systems Level I Exam
Last Update: Sep 14, 2025
Questions: 85

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99