Hit the Books & Save Big: Black Friday 75% Off! Use coupon code below on all exam bundles! - Ends in 0d 00h 00m 00s - Coupon code: budy75

H20-688_V1.0 HCSP-Field-SQA V1.0 Questions and Answers

Questions 4

If electrolyte leakage or structural deformation occurs, what should be done with the battery?

Options:

A.

Check whether the structural deformation affects the installation.

B.

Contact the installation engineer or professional O & M personnel immediately to remove or replace the battery.

C.

Try to install the battery.

D.

Check electrolyte leakage.

Buy Now
Questions 5

After receiving the equipment, verify that its outer packaging is intact. If it is not, only the SQA and the supervision engineer must assess the equipment status.

Options:

A.

True

B.

False

Buy Now
Questions 6

According to the training materials, which of the following form part of the SAROP method?

Select All that Apply.

Options:

A.

Do I have the skills and knowledge required to do this work?

B.

Have I checked that my activities do not endanger or affect the safety of other personnel?

C.

Do I hold the permit required for this work or have I obtained the approval?

D.

Have I identified the risks of this work and taken measures to ensure my safety?

E.

Have I used the right PPE?

Buy Now
Questions 7

Which of the following actions are covered by the EHS safety prohibitions?

Select All that Apply.

Options:

A.

Perform risky operations by a single person.

B.

Touch or operate third-party equipment such as batteries and power distribution frames (PDFs).

C.

Enter the accident scene without confirming safety.

D.

Wear safety helmets in the construction area, and wear insulation shoes and protective clothes in the powered-on power distribution room.

Buy Now
Questions 8

Cyber security ensures the availability, integrity, confidentiality, traceability, and attack-resistance capability of products, solutions, and services within a legal framework. It also safeguards customers’ or users’ communications content, personal data and privacy carried on them, and the flow of unbiased information.

Options:

A.

True

B.

False

Buy Now
Questions 9

How should damaged or retired batteries be managed during temporary storage after removal?

Options:

A.

No operation needed.

B.

Place them outdoors.

C.

Monitor them during storage for signs of smoke, flame, electrolyte leakage, or heat.

D.

Store them together with new batteries.

Buy Now
Questions 10

What is the prescribed time for carrying out operations such as service cutover, data setting, removing and inserting important boards while powered on, loading, and power-off reset in the industry?

Options:

A.

21:00 to 2:00. For the time of performing such major operations on special products, the device specifications shall prevail.

B.

9:00 to 18:00. For the time of performing such major operations on special products, the device specifications shall prevail.

C.

Any time

D.

Subjected to the customer’s approval time. The recommended time is 00:00 to 6:00. For the time of performing such major operations on special products, the device specifications shall prevail.

Buy Now
Questions 11

Which of the following is regarded as a preferred agent for extinguishing a fire involving lithium-ion batteries?

Options:

A.

Foam fire extinguisher

B.

Heptafluoropropane fire extinguisher

C.

Water

D.

Carbon dioxide fire extinguisher

Buy Now
Questions 12

SQA is the main owner of project quality within the quality team.

Options:

A.

True

B.

False

Buy Now
Questions 13

After batteries have been fully discharged, recharge them promptly to prevent damage caused by overdischarge.

Options:

A.

True

B.

False

Buy Now
Questions 14

Which of the following enablement tools can help support high-quality delivery in project delivery?

Options:

A.

Scene-based

B.

Smart wizard tool

C.

Smart assistant

D.

All of the above

Buy Now
Questions 15

Which of the following is appropriate when the equipment’s outer package is found damaged during entry management?

Options:

A.

The onsite SQA and the supervision engineer can receive the equipment after check.

B.

Remind the supervision engineer and project team to communicate with the supplier and fill in the Cargo Replacement Application Form.

C.

The supervision engineer evaluates whether the equipment meets the installation requirements and whether the equipment needs to be returned to the factory for repair/replacement.

D.

Communicate with the EPC/customer and owner about whether to receive the equipment after further check.

Buy Now
Questions 16

Which of the following is considered a quality feature?

Options:

A.

Safety

B.

Reliability

C.

Serviceability

D.

All of the above

Buy Now
Questions 17

Engineers must safeguard customers’ information security and prevent any other person from using that information in emails in any form.

When communicating with a customer by email or fax, which of the following behaviors are permitted?

Select All that Apply.

Options:

A.

Choose the wording in the email and fax for customers carefully, and avoid tough, caustic, and impolite words. Ask for the manager’s opinions before sending important emails or faxes.

B.

Do not include company’s confidential information in emails and faxes.

C.

Send sensitive data or content to intimate customers.

D.

Carefully archive the emails and faxes with the customer, as they are important written records which cannot be disposed without care, especially those involving future negotiation.

Buy Now
Questions 18

Which statement about the key business activities of the SQA key role “customer voice listener” is incorrect?

Options:

A.

Regularly summarize the closed-loop improvements on the voice of customers, and organize related domains to make dedicated improvements for common issues.

B.

Regularly organize visits to high-level customers.

C.

Regularly collect customers’ requirements on safety and quality.

D.

Organize efforts to analyze customer requirements, improve countering measures, and conduct closed-loop management.

Buy Now
Exam Code: H20-688_V1.0
Exam Name: HCSP-Field-SQA V1.0
Last Update: Nov 23, 2026
Questions: 60

PDF + Testing Engine

$139.99

Testing Engine

$104.99

PDF (Q&A)

$89.99