H19-132_V1.0 HCSA-Presales-Data Center Facility (Modular DC) V1.0 Questions and Answers

Questions 4

Which of the following statements regarding FusionModule800 is incorrect?

Options:

A.

FusionModule800 is suitable for small-scale data center scenarios. It only supports N+l power distribution and does not support 2N power distribution architecture.

B.

The FusionModule800 supports optional built-in fire suppression modules, eliminating the need for fire protection system reconstruction.

C.

FusionModule800 supports IT loads ≤ 40 kW.

Buy Now
Questions 5

The FusionModule500 cabinet measures 600 × 1100 × 2000 mm. Its rack-mounted cooling unit has a 3.5 kW cooling capacity and uses R410A refrigerant.

Options:

A.

True

B.

False

Buy Now
Questions 6

What is the maximum power capacity of one FusionModule800 module?

Options:

A.

25kW

B.

10kW

C.

40kW

Buy Now
Questions 7

Which of the following is considered a quality feature?

Options:

A.

Safety

B.

Reliability

C.

Serviceability

D.

All of the above

Buy Now
Questions 8

FusionModule2000 supports facial recognition for opening the aisle doors.

Options:

A.

True

B.

False

Buy Now
Questions 9

What is the height of the 30kVA power module in the integrated Modular UPS of FusionDC1000A-40ftIT?

Options:

A.

1U

B.

2U

C.

3U

D.

4U

Buy Now
Questions 10

The FusionModule500 uses the typical configuration mode, with core components preinstalled at the factory. How long does it take to roll out services on site?

Options:

A.

2 days

B.

1 day

C.

4 hours

D.

3 days

Buy Now
Questions 11

The FusionDC1000A-40ft-IT solution can be used in an environment of −40°C to +55°C.

Options:

A.

True

B.

False

Buy Now
Questions 12

According to the training materials, construction-site safety management can be classified into __________.

Select All that Apply.

Options:

A.

Safety technology management

B.

Site and facility management

C.

Safety organization management

D.

Behavior control

Buy Now
Questions 13

Which of the following are features of the UPS2000-H in FusionModule800?

Select All that Apply.

Options:

A.

Strong load adaptability, output PF=1

B.

The system has high conversion efficiency, reaching up to 96%

C.

Fast upgrade and maintenance, with remote online monitoring and upgrades

D.

Wide input voltage range, 80V to 280V

Buy Now
Questions 14

Which of the following UPSs does the FusionModule500 support?

Select All that Apply.

Options:

A.

10kVA

B.

3kVA

C.

6kVA

D.

15kVA

Buy Now
Questions 15

Which BOQ transfer modes does Meta CPQ provide?

Select All that Apply.

Options:

A.

Share the BOQ.

B.

Submit the BOQ.

C.

Export the BOQ.

Buy Now
Questions 16

What is the internal cooling system’s temperature-control range for the FusionDC1000A-40ft?

Options:

A.

17°C to 26°C

B.

16°C to 25°C

C.

18°C to 27°C

D.

19°C to 28°C

Buy Now
Questions 17

In-row air-cooled cooling is utilized in the FusionDC1000A-40ft-IT solution.

Options:

A.

True

B.

False

Buy Now
Questions 18

Which information appears on the configuration result page?

Select All that Apply.

Options:

A.

Discount category

B.

Code

C.

Model

D.

Description

Buy Now
Questions 19

The lithium-battery version of FusionDC1000A-40ft-IT is equipped with __________ IT racks in a 2N configuration.

Options:

A.

7

B.

6

C.

9

D.

8

Buy Now
Questions 20

Which of the following is not a key activity of the SQA role as a “continuous improvement pusher”?

Options:

A.

Establish an incentive mechanism for continuous improvement, and regularly summarize and commend continuous improvement work.

B.

Focus on the safety and quality results of product delivery and O & M, be target-oriented, and carry out safety and quality planning. Ensure that no safety accident and quality accident occur.

C.

Establish and implement the continuous improvement mechanism, instruct service personnel to apply scientific safety and quality engineering methods for analyzing problems and making improvement.

D.

Regularly organize efforts to identify safety and quality improvement points and drive the continuous improvement of business.

Buy Now
Questions 21

In the FusionDC1000A-40ft N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).

Options:

A.

True

B.

False

Buy Now
Questions 22

The project delivery site must have suitable fire-extinguishing facilities. A complete emergency plan must be prepared before the project begins. An emergency drill must be completed before the project is formally handed over.

Options:

A.

True

B.

False

Buy Now
Questions 23

To obtain total product volume and weight details for the SCT BOQ, to which business can you submit the BOQ?

Options:

A.

Logistics Estimation

B.

SPQ

C.

Manual Review (Export DB)

D.

Service Compliance

Buy Now
Questions 24

The air conditioners in the FusionDC1000A-40ft-IT solution use a wet-film humidifier instead of a traditional humidifier, thereby reducing power consumption.

Options:

A.

True

B.

False

Buy Now
Questions 25

Which of the following is not a quick-quotation method offered by Meta CPQ?

Options:

A.

Create a BOQ through the Quick Quotation portal.

B.

Create a BOQ directly.

C.

Create a BOQ from the shopping cart.

D.

Restore a BOQ from historical records.

Buy Now
Questions 26

FusionDC1000A's anti-seismic rating reaches _____.

Options:

A.

9

B.

10

C.

12

D.

11

Buy Now
Questions 27

After obtaining the total product volume and weight details in the Meta CPQ BOQ, to which of the following businesses can the BOQ be submitted?

Options:

A.

Logistics goods volume estimation

B.

Draft

C.

Commerce application

D.

Manual review (exporting databases)

Buy Now
Questions 28

What is the static load capacity of a Huawei IT cabinet?

Options:

A.

1500Kg

B.

1800Kg

C.

2000Kg

D.

2400Kg

Buy Now
Questions 29

Which of the following BOQ types may be used to place orders for demo products in SCT?

Options:

A.

Demo BOQ

B.

Promotional BOQ

C.

Normal BOQ

Buy Now
Questions 30

Which of the following product information is available on the configuration result page?

Select All that Apply.

Options:

A.

Description

B.

Code

C.

List price

D.

Model

Buy Now
Questions 31

Which functions can the local smart screen of the micro-module provide?

Select All that Apply.

Options:

A.

Facial recognition login for the surveillance system

B.

Core subsystem information display

C.

PUE demonstration

D.

Facial recognition access control

Buy Now
Exam Code: H19-132_V1.0
Exam Name: HCSA-Presales-Data Center Facility (Modular DC) V1.0
Last Update: Nov 22, 2026
Questions: 106

PDF + Testing Engine

$139.99

Testing Engine

$104.99

PDF (Q&A)

$89.99