Questions 4

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits

Options:

A.

An approach to regression testing

B.

A list of boundary values for “advance amount”

C.

A description of dependencies between test cases

D.

A logical collection of test cases

Buy Now
Questions 5

Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

Options:

A.

Create an estimate based on the function point analysis technique and test point analysis

B.

Create an estimate based on the complexity of the code

C.

Create an estimate based on the credentials of the successful bidder

D.

Create an estimate based on a percentage of the development effort

Buy Now
Questions 6

Which of the following product risks would be most effectively addressed just by static testing? 3 credits

Options:

A.

In the delivered application, one of the countries, as specified in the requirements, has not been correctly implemented.

B.

The application takes too long to process a request for additional cover.

C.

The test cases do not cover the key requirements.

D.

The successful bidder may not deliver all the required functionality on time.

Buy Now
Questions 7

Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or TMMi? 2 credits

Options:

A.

If the scope of test performance improvement covers all test levels, TMMi is preferred since TPI focusses mainly on black-box testing.

B.

If the organization is already applying CMMI, TMMi may be preferred since it has the same structure and uses the same terminology. TMMi addresses management commitment very strongly and is therefore more suitable to support a top-down improvement process.

C.

TPI is much more a bottom-up model that is suitable for addressing test topics for a specific (test) project.

D.

TMMi can only be used with the traditional V model,whereas TPI can be used with all types of software life cycles.

Buy Now
Questions 8

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

Options:

A.

ISO 9126

B.

IEEE 829

C.

BS 7925/2

D.

DO-178B

Buy Now
Questions 9

Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

Options:

A.

No priority or severity assigned

B.

Incident numbering is manual rather than automated

C.

No mentioning of reproduceability

D.

No classification on type of incident