Questions 4

Which of the following information in API documentation is LEAST relevant for implementing automated tests on that API?

Options:

A.

Release notes/change logs on past changes to the API

B.

Details about the parameters accepted by each API endpoint

C.

Authentication mechanisms required to access the API

D.

Details about the format of the API responses

Buy Now
Questions 5

A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

Options:

A.

The duration of the pilot project was too short –it should last unit the success factors are achieved

B.

The target defined for the business case is too accurate –it should not be measureable

C.

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.

The target defined for the business case seems difficult to hit – it should be realistic

Buy Now
Questions 6

As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.

Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?

Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?

Does the test automation tool support a licensing scheme that allows accessing different sets?

Does the test automation tool have a large feature set, but only part of the features will be sets?

Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?

Does the test automation tool need to install specific libraries that could impact the SUT?

Options:

A.

A and C

B.

A and E

C.

B and E

D.

C and D

Buy Now
Questions 7

You are working on a TAS for standalone application. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements include menus, buttons, radio buttons, text toolbars and their properties.

Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.

Which of the following is the FIRST step that you take to investigate this issue?

Options:

A.

Verify the testability support with the providers of the third party components

B.

Verify whether the GUI identification depends on the browser.

C.

Adopt an approach that uses the coordinates of the GUI elements instead

D.

Verify whether naming standards for variables and have been defined for the current automation solution

Buy Now
Questions 8

(In User Acceptance Testing (UAT) for a new SUT, in addition to the manual tests performed by the end-users, automated tests are performed that focus on the execution of repetitive and routine test scenarios. In which of the following environments are all these tests typically performed?)

Options:

A.

Build environment

B.

Integration environment

C.

Preproduction environment

D.

Production environment

Buy Now
Questions 9

Which of the following statements about the relationship between TAA, TAS and TAF is true?

Options:

A.

A TAF can be used to implement a TAS, which is an implementation of a TAA

B.

A TAS can be used to implement a TAF, which is an implementation of a TAA

C.

A TAS can be used to implement a TAA, which is an implementation of a TAF

D.

A TAF can be used to implement a TAA, which is an implementation of a TAS

Buy Now
Questions 10

(Which of the following statements refers to a typical advantage of test automation?)

Options:

A.

Automated tests can determine whether actual results match expected results, even for non-machine-interpretable results

B.

On average, automated tests written at the API level are likely to run faster than automated tests written at the UI level

C.

Artificial intelligence can be used to help identify redundant tests within large, long-running automated regression test suites

D.

Automated tests can allow defects to be detected earlier than manual tests because their execution times can be shorter

Buy Now
Questions 11

Which of the following statements about a test progress report produced for an automated test suite is TRUE?

Options:

A.

The test progress report should indicate, for each test in the suite, the timestamps related to the test steps

B.

The content of the test progress report should not be affected by the stakeholders to whom the report is intended

C.

The test progress report should indicate the test environment in which the tests were performed

D.

The test progress report should indicate, for each test in the suite, the start and end timestamps of the test

Buy Now
Questions 12

Which one of the following answers does NOT refer to an example of configuration item(s) that should be specified in development pipelines to identify a test environment (and its specific test data) associated with a web app under test on which to execute automated tests?

Options:

A.

The number and type of automated tests to execute in the test environment where the web app is deployed

B.

The base URL of the test environment where the web app is deployed (i.e., the root address for accessing the web app)

C.

The connection string(s) to connect to the test database(s) within the test environment where the web app is deployed

D.

The URLs of web APIs/web services related to the web app’s backend within the test environment where the app is deployed

Buy Now
Questions 13

(Which of the following aspects of “design for testability” is MOST directly associated with the need to define precisely which interfaces are available in the SUT for test automation at different test levels?)

Options:

A.

Autonomy

B.

Architecture transparency

C.

Controllability

D.

Observability

Buy Now
Questions 14

You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.

Which of the following layers of the gTAA should you focus on for the TAS?

Options:

A.

The test Generation layer

B.

The Test Definition layer

C.

The Test Adaption layer

D.

The Test Execution layer

Buy Now
Questions 15

An automated test case that should always pass sometimes passes and sometimes fails intermittently (non-deterministic behavior) when executed in the same test environment, even if no code (i.e., SUT code or the test automation code) has been changed. Which of the following statements about the root cause of this non-deterministic behavior is TRUE?

Options:

A.

The specified root cause is a race condition that can be identified by also analyzing the log files of the test case, the SUT, and the TAF

B.

Determining the specified root cause may require, in addition to the TAE, the support of others such as developers and system engineers

C.

The specified root cause must be in the instability of the test environment, since no code has been changed

D.

Determining the specified root cause is certainly easier than if the automated test always fails (deterministic behavior)

Buy Now
Questions 16

You are currently conducting a Proof of Concept (PoC) aimed at selecting a tool that will be used for the development of a TAS. This TAS will exclusively be used by one team within your organization to implement automated UI-level test scripts for two web apps. The two tools selected for the PoC use JavaScript/TypeScript to implement the automated test scripts and offer capture and playback capabilities. Three test cases for each of the two web apps were selected to be automated during the PoC. The PoC will compare these two tools in terms of their effectiveness in recognizing and interacting with UI widgets exercised by the test cases, to quickly determine whether test automation is possible and which tool is better. Which of the following TAFs is BEST suited for conducting the PoC?

Options:

A.

A one-layer TAF (test scripts)

B.

A two-layer TAF (test scripts, test libraries)

C.

A three-layer TAF (test scripts, business logic, core libraries)

D.

A layered TAF with more than three layers

Buy Now
Questions 17

Which of the following recommendations can help improve the maintainability of test automation code?

Options:

A.

Use error codes in test automation code instead of exceptions (if exceptions are supported by the programming language) for error handling

B.

Avoid producing test automation code containing methods with too many levels of nesting, as deeply nested code is more difficult to understand

C.

Avoid adopting design patterns that introduce high levels of abstraction in test automation code, such as the flow model pattern

D.

Avoid using static analyzers on test automation code and other development tools, as they are designed to improve the maintainability of SUT code

Buy Now
Questions 18

A TAS that performs automated testing in a single test environment was successfully manually installed and configured from a central repository, with all its components in the correct versions. It was also verified that all TAS components in this environment are capable of providing reliable and repeatable performance. The TAS will be used to run several suites of automated regression test scripts on various SUTs in the test environment. Your current goal is to complete all preliminary verifications to ensure that the TAS works correctly. Which of the following activities would you perform FIRST?

Options:

A.

Create scripts to automatically install and configure the TAS in the test environment from the central repository

B.

Check whether the TAS connectivity to all required internal systems, external systems, and interfaces is available

C.

Run a given suite multiple times using TAS to determine whether all regression test scripts always provide the same result

D.

Check whether all regression test scripts in a given suite have expected results

Buy Now
Questions 19

Consider the following layers of the gTAA structure:

a. Test generation layer

b. Test definition layer

c. Test execution layer

d. Test execution layer

Consider the following capabilities associated with these layers.

Acquire all the necessary resources before each test and release all after run, in order to avoid interdependences between test

Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.

Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.

Allow the definition and implementation of test cases and data by means of templates and/or guidelines.

Which of the following BEST matches each layer with the appropriate capability?

Options:

A.

a-3, b-4, c-1, d-2

B.

a-4, b-3, c-1, d-2

C.

a-4, b-3, c-2, d-1

D.

a-3, b-4, c-2, d-1

Buy Now
Questions 20

Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.

What is the MOST important metric to collect to achieve your goal?

Options:

A.

The code coverage achieved with the automated tests, for each new release of the SUT

B.

The number of automated tests which fail because of a single software defect, for each new release of the SUT

C.

The time it takes to execute all the automated tests, for each new release of the SUT.

D.

The number of automated tests requiring maintenance, for each new release of the SUT.

Buy Now
Questions 21

Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.

Which two of the following aspects are MOST relevant for achieving your goal in this scenario?

The configuration of the TAS uses automated installation scripts

The TAF saves the logs needed to debug errors in XML format

C) Features of the TAF not used by the automated tests have been tested

D) All the automated test cases contain the expected results

E) The TAS components are under configuration management

Options:

A.

A and e

B.

B and c

C.

B and d

D.

A and d

Buy Now
Questions 22

Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.

What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

Options:

A.

Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.

B.

Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior

C.

Verify the behavior of the whole automated test suite by running all the automated tests

D.

Do not run any tests because you can immediately confirm the correct functioning of the automated test suite

Buy Now
Questions 23

Which of the following practices can be used to specify the active (i.e., actually available) features for each release of the SUT and determine the corresponding automated tests that must be executed for a given release?

Options:

A.

Feature-driven development

B.

The use of feature files

C.

Test-driven development

D.

The use of feature toggles

Buy Now
Questions 24

As a TA-E, you have successfully verified that a test automation environment and all other components of the TAS are working as expected. Now your goal is to verify the correct behavior for a given automated test suite that will be run by the TAS. Which of the following should NOT be part of the verifications aimed at achieving your goal?

Options:

A.

Is the connectivity between the TAS and the necessary internal and external systems available and stable?

B.

Does the level of intrusion of automated test tools influence confidence in the suite's test results?

C.

Do all automated tests within the suite always provide the same results across multiple runs?

D.

Are all automated tests within the suite complete in terms of test data, including expected results?

Buy Now
Exam Code: CTAL-TAE
Exam Name: ISTQB Certified Tester Advanced Level, Test Automation Engineering
Last Update: Mar 5, 2026
Questions: 80

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99