CTAL-TTA Certified Tester Advanced Level Technical Test Analyst Questions and Answers
A software company based in Spain that develops mobile applications expects many small updates in the future, e.g., due to changing configurations and customer feedback. The company also wants to focus on being able to change the software effectively and efficiently during initial development without introducing new defects.
Which maintainability sub-characteristic should be covered by the test approach during the initial development?
Which requirements engineering technique would BEST identify how different groups of users may interact with a system, helping to identify gaps and inconsistencies in a user story-’
SELECT ONE OPTION
The following characteristics were identified during an early product risk-assessment for a software system:
• the software system needs to manage synchronization between various processes
• microcontrollers will be used that will limit product performance
• the hardware that will be used will make use of timeslots
• the number of tasks supported in parallel by the software system is large and are often highly complex.
Based on the information provided, which of the following non-functional test types is MOST appropriate to be performed?
Which of the following is a valid reason for including security testing in a test approach?
You need to implement a Java class that validates a password entry field. The validation critena states that the password must:
1. be a minimum of 8 characters
2 contain at least one special character.
You are focusing on validation criterion 1 and have written a test class that checks that a 7 character password entry will fail validation.
You have written code designed to make this test class pass, however, on first execution of the test class it has failed
What should you do next9
SELECT ONE OPTION
A risk-based approach is being taken to test a new web-based retail application. Which of the following activities is the Technical Test Analyst NOT usually expected to perform?
The last release of a hotel booking website resulted in poor system performance when hotel searches reached peak volumes. To address these problems in the forthcoming release, changes to the system architecture are to be implemented as follows:
Change 1 - Provision of a single Internet service using multiple servers, rather than a single server, to maximize throughput and minimize response time during peak volumes
Change 2 - Prevention of unnecessary database calls for objects that were not immediately needed by the calling applications. Achieved by not automatically creating database connections at the start of processing, instead only just before the data is required.
The system architecture document has been drafted and as Technical Test Analyst you have been invited to participate in its review. Which of the following review checklist items is MOST likely to identify any defects in the proposed system architecture for Change 1?
When conducting a data flow analysis of following section of pseudo code:
Declare Function_Biggest integer (inputl integer. Input2 Integer) }
Declare output Integer
Set output = inputl
If input2 > output then
Set output = input2
Endif
Return output
}
Which of the variables utilized above has a potential anomalie?
You are defining the test approach for an Agile project release focused on significantly overhauling the user interface of a golf club's booking system. Additional features will allow more flexible bookings across three courses. These changes are driven by numerous customer complaints about the current system's confusing design and limited options. The release will consist of six two-week sprints.
Stakeholders have performed a risk assessment and consider the impact of system failure as high due to potential customer loss. A regression-averse strategy is recommended due to the extensive changes expected in screen design and functionality.
Which option below represents the BEST test approach for this release? Please use the following symbols consistently:
♦+ (highly recommended)
♦ (recommended)
o (neutral/optional)
• (not recommended)
- (not to be used)

SELECT ONE OPTION
Your team is developing an e-shop application (the SUT) that will use a third-party service to process payments via an API. This third-party payment gateway is itself still under development Which statement contains a pair of benefits that can BOTH be expected from service virtualization in this circumstance’
SELECT ONE OPTION
Which statement about test automation being applied to a reactive test approach, is CORRECT’
SELECT ONE OPTION
What is MOST likely to be a consideration when implementing a new performance test tool?
What is the earliest stage in the application's SDLC at which performance efficiency testing can be performed?
Which of the following test categories would best characterize a test designed to confirm that the data backup tapes stored offsite by a bank can be retrieved and loaded within the business process service level agreement?
An enhancement to a Social Media application allows for the creation of new Groups. Any number of existing application members can be added to a Group. An attempt to add a non-existent member of the application to a Group will result in an error, as will an attempt to add the same member twice. Members can be removed from an existing Group. An existing Group can be deleted but only if there are no current members attached to it.
Which one of the following Keyword-driven input tables provides the BEST test coverage of this enhancement?
Table 1
KeywordGroup IdMember Id
Create.GroupGroup3
Add_MemberGroup3@Member1
Add.MemberGroup3(a)Member2
Delete_GroupGroup3
Remove.MemberGroup3@Memberl
Remove_MemberGroup3@)Member2
Delete.GroupGroup3
Result
Group created
Member added to Group
Member added to Group
Error - Group not empty
Member removed from group
Member removed from group
Group deleted
Table 2
KeywordGroup IdMember IdResult
Create.GroupGrouplGroup created
Add.MemberGrouplMember4Error - member does not exist
Add.MemberGroupl(©MemberlMember added to Group
Delete.GroupGrouplError - Group not empty
Remove_Member@Member 1Member removed from group
Delete.GroupGrouplGroup deleted
Table 3
KeywordGroup IdMember IdResult
Create.GroupGroup3Group created
Add.MemberGroup3Member9Error - member does not exist
Add.MemberGroup3(©MemberlMember added to Group
Add_MemberGroup 3(©MemberlError - member already in group
Delete.GroupGroup3Error - Group not empty
Remove-MemberGroups(©Member 1Member removed from group
Delete.GroupGroupsGroup deleted
Table 4
KeywordGroup IdMember IdResult
Create.GroupGrouplGroup created
Add.MemberGroupl@Member3Member added to Group
Add.MemberGroupl@Member3Error - member already in group
Delete.GroupGrouplError - Group not empty
Remove.MemberGroupl@Member1Member removed from group
Delete.GroupGrouplGroup deleted
SELECT ONE OPTION
The F in the mnemonic FIRST stands for Fast Which option correctly states the meanings of the other four letters (IRST)?
SELECT ONE OPTION
When conducting a data flow analysis of following section of pseudo code:
Declare C, F, Z Decimal
Set Z = 32
Read F
SetC = (F-Z) * 5/9
Free C, F. Z
Print F
Which of the variables utilized above has a potential anomalie?
You are responsible for the non-functional testing of a website supporting a popular restaurant chain. Due to the rapid expansion of the number of restaurants in the chain, the company is expecting the peak number of concurrent website views to more than triple in the next 6 months. As a result, it has purchased two further production servers to support the existing one. A new hardware release has been scheduled for which the following product risk has been recorded:
{Insert Table 2)
Which one of the following non-functional test typos would be BEST to mitigate this risk?

Given the following pseudo code for a program to solve quadratic equations:
program Quadratic Formula
integer: a, b, c, d
floating point: r1, r2
READ (a)
READ (b)
READ (c)
d := (b * b) - (4 * a * c)
IF d < 0 THEN
PRINT ("Imaginary Roots")
ELSE
r1 := (-b + sqrt(d)) / (2 * a)
r2 := (-b - sqrt(d)) / (2 * a)
PRINT ("first root is: " r1)
PRINT ("second root is: " r2)
ENDIF
END program Quadratic_Formula
Which of the following checklist items is MOST likely to indicate a problem in this program?
You have conducted static analysis on several new modules for an existing product. You are now executing test cases and are seeing inconsistent problems including crashes. Intermittent error messages are appearing. Despite all your best efforts, you are not able to find reproducible scenarios to force these errors.
What problem in the code are you likely seeing?
How many test cases need to be designed to achieve 100% decision coverage in the following piece of pseudo-code which applies discount rates to hotel room bookings?
Read (Loyalty_level)
Read (Room_price)
IF (Room_price > 200)
IF (Loyalty_level = Platinum)
Discount_factor = 80%
ELSE
IF (Loyalty_level = Gold)
Discount_factor = 85%
ELSE
Discount_factor = 95%
ENDIF
ENDIF
ELSE
IF (Room_price > 150)
IF (Loyalty_level = Platinum)
Discount_factor = 85%
ELSE
Discount_factor = 95%
ENDIF
ELSE
Discount_factor = 100%
ENDIF
ENDIF
Room_price = Room_price * Discount_factor
IF (Discount_factor < 100%)
Show message "Congratulations - you have received a discount!"
ENDIF
Consider the code fragment provided below:

The comment frequency of the code fragment is 13%.
To which non-functional quality characteristic does a good level of comment frequency especially contribute?
Which of the following are activities that the Technical Test Analyst performs when setting up a test automation project?
1.Schedule the manual testing
2.Define interface requirements between tools
3.Perform a code review on the functional specifications
4.Determine whether to use a rule-dnven approach
5.Tram the test analysts to use and supply the data
Which of the following is a true statement regarding a continuous integration environment?
You work for a small supermarket chain which has successfully operated a product inventory application for several years. It has recently purchased a data warehousing solution which provides tailorable profiling of product purchases with the aim of improving its marketing strategy. The decision has been made to host the data warehousing software and database on the same server used by the product inventory application. Based on this decision, two product risks have been cataloged:
The co-existence of both applications on the same server may introduce resource conflicts, resulting in an unacceptable impact on the functionality of the product inventory application
In the event of loss or corruption of product inventory data during transfer to the warehouse, it may not be possible to restore from back-up in the timeframe required, resulting in lost business.
Which TWO non-functional test types should be included in the test plan to mitigate both product risks?
A new Payroll system calculates the amount of tax that each employee must pay (TaxToPay) on their gross monthly salary (in (), and the net salary (NetSal) that they will receive after that amount of tax has been deducted It also calculates the amounts of tax (TaxPdYTD) and net salary (SalPdYTD) paid in the year to date (YTD) by adding them to the stored amounts from last month (for month 1 these will be zero), inputs Include Employee id (Empid) and Gross Salary this month (GrossSal). Tax Rate is looked up on the key of Employee Id, the amounts of tax and net salary paid in the year to date are looked up on the key of (Employee Id and [month • 1]) except that for month 1 they will be zero.
if both employees were paid the same in month 1 as in the current month 2. for which tax has now to be calculated, which data-driven input and expected output table is correct for this situation?
Table 1
MonthEmpidGrossSalTaxRateTaxToPayNetSalTaxPdYTD
212000153001700600
222200204401760880
Table 2
MonthEmpidGrossSalTaxRateTaxToPayNetSalSalPdYTD
2120000.153001700600
2222000.24401760880
Table 3
MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD
11200030017006003400
12220044017608803520
Table 4
MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD
21200030017006003400
22220044017608803520
SELECT ONE OPTION
The following User story is being developed using the 8DD approach:
As a Purchasing Manager
i want to see a list of all Purchase Orders placed so far this month with their total value
So that I can control the amount of money being spent
Which scenario is BOTH written in correct Gherkin format AND is appropriate for this User Story9
SEI ECT ONE OPTION
A new web site has been launched for a testing conference. There are a number of links to other related web sites for information purposes. Participants like the new site but complaints are being made that some (not all) of the links to other sites do not work.
Which type of test tool is most appropriate in helping to identify the causes of these failures?
Below is the pseudo-code for the bingo program:

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?
BestFor Incorporated is a rapidly growing online financial services company that offers guidance to its customers on a range of financial products. Its first website, BestForMortgages, was launched two years ago, shortly followed by BestForPensions. The popularity of both sites has driven the company to expand its offerings into other sectors and a third website, BestForFood, has recently been released.
The first two websites have proven to be functionally robust but suffered from performance issues due to:
Underestimation of concurrent user access at peak times in its original operational profiles
Data volumes rapidly growing beyond expectations on a single database shared by both sites.
All three websites share the same web server.
The BestForFood system has been running live for several months, however the following significant non-functional defects have been recorded:
A) The layout and navigation of the BestForFood website was not considered by the users as consistent with BestForPensions and BestForMortgages
B) Soon after delivering the BestForFood system the performance of both BestForPensions and BestForMortgages noticeably slowed
C) The time taken to diagnose, repair and re-test production defects did not meet BestForFood service level agreements
D) BestForFood performance was adversely impacted by unexpected growth in data volumes
E) The time taken to install monthly builds into the production system exceeded agreed timescales.
Which TWO of these defects might have been prevented had portability testing and compatibility testing been employed?
You are responsible for planning the non-functional testing for a new product. You will be responsible for the performance testing and you have determined that you will need a simulator to complete your work, Which of the following are considerations when purchasing a simulator?
1.Path testing of the tool
2.Time to test the tool
3.cost of hmng specialists
4.Susceptibility to the "probe effect"
5.Method and bme to upgrade and retest the tool as the software changes
6.Control flow analysis
Considering the following statements:
A) The data used for a test is held external to the automated script
B) The scope of an automated test suite is driven by the range of test data available
C) It uses a high-level language to separate the action to be performed on the test data from the test script
D) A spreadsheet is used to record the actions to be performed instead of the input data
Which of the following options is the correct selection of these statements to describe data-driven and keyword-driven automation?
Consider the pseudo code provided below regarding a customer request for cash withdrawal from an ATM.
If the customer has sufficient funds in their account
OR the customer has the credit granted
THEN the ATM machine pays out the requested amount to the customer
Which of the following test cases would be the result of applying multiple condition testing, but would NOT be the result of applying modified condition/decision testing?
Which statement is correct regarding the use of exploratory testing for safety critical systems?
SELECT ONE OPTION
You are working for a company that has a product in the field that has reached its capacity. The system cannot handle any more users without a significant degradation in performance and a significant spike in resource requirements. As a result, your new product has strict requirements for performance efficiency and a specific growth requirement that is estimated for the next three years.
What type of testing should you conduct to make sure the future requirements will be met?
As Technical Test Analyst on a test automation project covering the acquisition of a commercial test execution tool, what would you MOST likely be responsible for?
Consider the pseudo code for the Answer program:

Which of the following statements about the Answer program BEST describes the control flow anomalies to be found in the program?
You are responsible for the performance testing of a new web application. In particular, you are interested in determining if you have enough and the right type of servers to handle 10,000 concurrent users. Which is the primary consideration when you are selecting your performance testing tools?
Which of the following is a valid reason for including performance testing in a test approach?
A review of the following pseudo code is to be performed using a checklist:
Module Vowel Counter
Message: array of Characters
M, N: Integer
ACount, ECount, ICount, OCount, UCount: Integer
BEGIN
I=1
Read Nextchar
While Nextchar <> 'S'
DO
Message (I) = Nextchar
I = I+1
Read Nextchar
ENDWHILE
FOR M = 1 To I
DO
Print (Message(M))
IF Message (M) = 'E'
THEN
ECount = ECount + 1
ELSE
IF Message (M) = 'A'
THEN
ACount = ACount + 1
ELSE
IF Message (M) = 'I'
THEN
ICount = ICount + 1
ELSE
IF Message (M) = 'O'
THEN
OCount = OCount + 1
ELSE
IF Message (M) = 'U'
THEN
UCount = UCount + 1
ENDIF
ENDIF
ENDIF
ENDIF
ENDIF
ENDFOR
Print ('Message contains ' ACount + ECount + ICount + OCount + UCount ' vowels')
END
Which of the following checklist items would find code errors in this scenario?
A) Are all variables properly declared?
B) Are all loops, branches, and logic constructs complete, correct, and properly nested?
C) Are all cases covered in an IF-ELSEIF, including ELSE or DEFAULT clauses?
D) Are loop termination conditions obvious and invariably achievable?
E) Are there any redundant or unused variables?
Which option describes a good practice when applying test automation for a Regression-averse test approach?
SELECT ONE OPTION
Which of the following is a reason for the Technical Test Analyst to take the time to prepare for a code review?
