New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

CTAL-TTA Certified Tester Advanced Level Technical Test Analyst Questions and Answers

Questions 4

A software company based in Spain that develops mobile applications expects many small updates in the future, e.g., due to changing configurations and customer feedback. The company also wants to focus on being able to change the software effectively and efficiently during initial development without introducing new defects.

Which maintainability sub-characteristic should be covered by the test approach during the initial development?

Options:

A.

Analysability

B.

Modifiability

C.

Modularity

D.

Re-usability

Buy Now
Questions 5

Which requirements engineering technique would BEST identify how different groups of users may interact with a system, helping to identify gaps and inconsistencies in a user story-’

SELECT ONE OPTION

Options:

A.

Personas

B.

Storyboards

C.

Use Cases

D.

Story Mapping

Buy Now
Questions 6

The following characteristics were identified during an early product risk-assessment for a software system:

• the software system needs to manage synchronization between various processes

• microcontrollers will be used that will limit product performance

• the hardware that will be used will make use of timeslots

• the number of tasks supported in parallel by the software system is large and are often highly complex.

Based on the information provided, which of the following non-functional test types is MOST appropriate to be performed?

Options:

A.

Maintainability testing

B.

Security testing

C.

Time-behaviour testing

D.

Portability testing

Buy Now
Questions 7

Which of the following is a valid reason for including security testing in a test approach?

Options:

A.

There is a threat of unauthorized copying of applications or data.

B.

To provide measurements from which an overall level of availability can be obtained.

C.

To evaluate the ability of a system to handle peak loads at or beyond the limits of its anticipated or specified workloads

D.

Software changes will be frequent after it enters production.

Buy Now
Questions 8

You need to implement a Java class that validates a password entry field. The validation critena states that the password must:

1. be a minimum of 8 characters

2 contain at least one special character.

You are focusing on validation criterion 1 and have written a test class that checks that a 7 character password entry will fail validation.

You have written code designed to make this test class pass, however, on first execution of the test class it has failed

What should you do next9

SELECT ONE OPTION

Options:

A.

Repair the failing code and re-execute it for the test class

B.

Develop a test class with a 9 character password containing one special character and re-execute the code

C.

Add code to cover special character validation criterion 2

D.

Refactor the failing code to improve its design and structure

Buy Now
Questions 9

A risk-based approach is being taken to test a new web-based retail application. Which of the following activities is the Technical Test Analyst NOT usually expected to perform?

Options:

A.

Understanding the probability of each technical product risk

B.

Assessing the likelihood of identified security risks

C.

Assessing the business impact of identified performance risks

D.

Designing tests to mitigate identified reliability risks

Buy Now
Questions 10

The last release of a hotel booking website resulted in poor system performance when hotel searches reached peak volumes. To address these problems in the forthcoming release, changes to the system architecture are to be implemented as follows:

Change 1 - Provision of a single Internet service using multiple servers, rather than a single server, to maximize throughput and minimize response time during peak volumes

Change 2 - Prevention of unnecessary database calls for objects that were not immediately needed by the calling applications. Achieved by not automatically creating database connections at the start of processing, instead only just before the data is required.

The system architecture document has been drafted and as Technical Test Analyst you have been invited to participate in its review. Which of the following review checklist items is MOST likely to identify any defects in the proposed system architecture for Change 1?

Options:

A.

Connection pooling

B.

Load balancing

C.

Distributed processing

D.

Caching

Buy Now
Questions 11

How many independent paths are shown in the control flow diagram below?

CTAL-TTA Question 11

Options:

A.

6

B.

3

C.

4

D.

2

Buy Now
Questions 12

When conducting a data flow analysis of following section of pseudo code:

Declare Function_Biggest integer (inputl integer. Input2 Integer) }

Declare output Integer

Set output = inputl

If input2 > output then

Set output = input2

Endif

Return output

}

Which of the variables utilized above has a potential anomalie?

Options:

A.

Inputl and input2

B.

None of the variables

C.

output

D.

Function_Biggest

Buy Now
Questions 13

You are defining the test approach for an Agile project release focused on significantly overhauling the user interface of a golf club's booking system. Additional features will allow more flexible bookings across three courses. These changes are driven by numerous customer complaints about the current system's confusing design and limited options. The release will consist of six two-week sprints.

Stakeholders have performed a risk assessment and consider the impact of system failure as high due to potential customer loss. A regression-averse strategy is recommended due to the extensive changes expected in screen design and functionality.

Which option below represents the BEST test approach for this release? Please use the following symbols consistently:

    + (highly recommended)

    (recommended)

    o (neutral/optional)

    • (not recommended)

    - (not to be used)

CTAL-TTA Question 13

SELECT ONE OPTION

Options:

A.

3

B.

1

C.

4

D.

2

Buy Now
Questions 14

Your team is developing an e-shop application (the SUT) that will use a third-party service to process payments via an API. This third-party payment gateway is itself still under development Which statement contains a pair of benefits that can BOTH be expected from service virtualization in this circumstance’

SELECT ONE OPTION

Options:

A.

Earlier discovery of defects in the SUT; the ability to share code between the SUT and the payment gateway.

B.

Parallel compilation, continuous integration, and test automation; more effective configuration management.

C.

Realistic testing of the SUT before the actual payment gateway is available, simplification of the test environment

D.

Earlier testing of the API, reduction in the amount of test data needed

Buy Now
Questions 15

Which statement about test automation being applied to a reactive test approach, is CORRECT’

SELECT ONE OPTION

Options:

A.

Automation of test execution in exploratory test sessions can lead to increased efficiency and wider coverage of user stories

B.

BDD can be used within a reactive testing approach by producing automated tests in parallel with the implementation of the user story

C.

For projects that must comply with externally defined regulations, the automated tests and their results must be traceable back to requirements

D.

An increase in automated test coverage can lead to a greater degree of exploratory testing addressing high risk areas

Buy Now
Questions 16

What is MOST likely to be a consideration when implementing a new performance test tool?

Options:

A.

The lack of flexibility in the tool may mean that it is unable to generate incorrect inputs for all the different types of virtual user

B.

The load generation suggested by the operational profiles of the users may exceed the available hardware and network bandwidth of the tool

C.

The model used to describe the intended execution-time behavior of the system under test may not be compatible with the tool

D.

The language used for programming the system under test may be different from that used to develop the tool

Buy Now
Questions 17

What is the earliest stage in the application's SDLC at which performance efficiency testing can be performed?

Options:

A.

During requirements analysis

B.

During unit testing

C.

During system testing

D.

During beta testing

Buy Now
Questions 18

Which of the following test categories would best characterize a test designed to confirm that the data backup tapes stored offsite by a bank can be retrieved and loaded within the business process service level agreement?

Options:

A.

Hazard testing

B.

Reliability testing

C.

Security testing

D.

Continuity testing

Buy Now
Questions 19

An enhancement to a Social Media application allows for the creation of new Groups. Any number of existing application members can be added to a Group. An attempt to add a non-existent member of the application to a Group will result in an error, as will an attempt to add the same member twice. Members can be removed from an existing Group. An existing Group can be deleted but only if there are no current members attached to it.

Which one of the following Keyword-driven input tables provides the BEST test coverage of this enhancement?

Table 1

KeywordGroup IdMember Id

Create.GroupGroup3

Add_MemberGroup3@Member1

Add.MemberGroup3(a)Member2

Delete_GroupGroup3

Remove.MemberGroup3@Memberl

Remove_MemberGroup3@)Member2

Delete.GroupGroup3

Result

Group created

Member added to Group

Member added to Group

Error - Group not empty

Member removed from group

Member removed from group

Group deleted

Table 2

KeywordGroup IdMember IdResult

Create.GroupGrouplGroup created

Add.MemberGrouplMember4Error - member does not exist

Add.MemberGroupl(©MemberlMember added to Group

Delete.GroupGrouplError - Group not empty

Remove_Member@Member 1Member removed from group

Delete.GroupGrouplGroup deleted

Table 3

KeywordGroup IdMember IdResult

Create.GroupGroup3Group created

Add.MemberGroup3Member9Error - member does not exist

Add.MemberGroup3(©MemberlMember added to Group

Add_MemberGroup 3(©MemberlError - member already in group

Delete.GroupGroup3Error - Group not empty

Remove-MemberGroups(©Member 1Member removed from group

Delete.GroupGroupsGroup deleted

Table 4

KeywordGroup IdMember IdResult

Create.GroupGrouplGroup created

Add.MemberGroupl@Member3Member added to Group

Add.MemberGroupl@Member3Error - member already in group

Delete.GroupGrouplError - Group not empty

Remove.MemberGroupl@Member1Member removed from group

Delete.GroupGrouplGroup deleted

SELECT ONE OPTION

Options:

A.

Table 4

B.

Table 3

C.

Table 1

D.

Table 2

Buy Now
Questions 20

Which statement correctly describes service virtualization’’

SELECT ONE OPTION

Options:

A.

It is a shareable testing service that simulates the behavior, data and performance of a system or service to which the product or component under test would normally be connected

B.

It is a service which automatically deploys new versions of the software into the production environment at regular and short intervals

C.

it is an integrated set of tools that will automatically compile, test and deliver into a virtual environment a new build of the product under test

D.

it is a collection of mock objects such as stubs and drivers that will allow a product or component to run without some other product or component that it would normally need

Buy Now
Questions 21

The F in the mnemonic FIRST stands for Fast Which option correctly states the meanings of the other four letters (IRST)?

SELECT ONE OPTION

Options:

A.

isolated, Reliable. Self-Verifying, Timely.

B.

Independent, Reliable, Self-Validating, Timely

C.

independent. Repeatable, Self-Verifying, Thorough.

D.

Isolated. Repeatable. Self-Validating, Thorough.

Buy Now
Questions 22

When conducting a data flow analysis of following section of pseudo code:

Declare C, F, Z Decimal

Set Z = 32

Read F

SetC = (F-Z) * 5/9

Free C, F. Z

Print F

Which of the variables utilized above has a potential anomalie?

Options:

A.

C and Z

B.

None of the variables

C.

AI1 °fthe variables

D.

F

Buy Now
Questions 23

You are responsible for the non-functional testing of a website supporting a popular restaurant chain. Due to the rapid expansion of the number of restaurants in the chain, the company is expecting the peak number of concurrent website views to more than triple in the next 6 months. As a result, it has purchased two further production servers to support the existing one. A new hardware release has been scheduled for which the following product risk has been recorded:

{Insert Table 2)

Which one of the following non-functional test typos would be BEST to mitigate this risk?

CTAL-TTA Question 23

Options:

A.

Load testing

B.

Adaptability testing

C.

Scalability testing

D.

Reliability testing

Buy Now
Questions 24

Given the following pseudo code for a program to solve quadratic equations:

program Quadratic Formula

integer: a, b, c, d

floating point: r1, r2

READ (a)

READ (b)

READ (c)

d := (b * b) - (4 * a * c)

IF d < 0 THEN

PRINT ("Imaginary Roots")

ELSE

r1 := (-b + sqrt(d)) / (2 * a)

r2 := (-b - sqrt(d)) / (2 * a)

PRINT ("first root is: " r1)

PRINT ("second root is: " r2)

ENDIF

END program Quadratic_Formula

Which of the following checklist items is MOST likely to indicate a problem in this program?

Options:

A.

Does the code avoid comparing floating point numbers for equality?

B.

Are all variables properly defined with meaningful, consistent and clear names?

C.

Are there any redundant or unused variables?

D.

Are divisors tested for zero or noise?

Buy Now
Questions 25

You have conducted static analysis on several new modules for an existing product. You are now executing test cases and are seeing inconsistent problems including crashes. Intermittent error messages are appearing. Despite all your best efforts, you are not able to find reproducible scenarios to force these errors.

What problem in the code are you likely seeing?

Options:

A.

Wild pointers

B.

Poor error handling

C.

Undefined variables

D.

Instrumented code

Buy Now
Questions 26

How many test cases need to be designed to achieve 100% decision coverage in the following piece of pseudo-code which applies discount rates to hotel room bookings?

Read (Loyalty_level)

Read (Room_price)

IF (Room_price > 200)

IF (Loyalty_level = Platinum)

Discount_factor = 80%

ELSE

IF (Loyalty_level = Gold)

Discount_factor = 85%

ELSE

Discount_factor = 95%

ENDIF

ENDIF

ELSE

IF (Room_price > 150)

IF (Loyalty_level = Platinum)

Discount_factor = 85%

ELSE

Discount_factor = 95%

ENDIF

ELSE

Discount_factor = 100%

ENDIF

ENDIF

Room_price = Room_price * Discount_factor

IF (Discount_factor < 100%)

Show message "Congratulations - you have received a discount!"

ENDIF

Options:

A.

4

B.

6

C.

7

D.

8

Buy Now
Questions 27

Which of the following is true regarding maintainability?

Options:

A.

This factor Is critical for the initial success of the product launch

B.

This factor becomes more Important the longer the system remains in the production environment

C.

This factor will influence the performance of the system

D.

This factor affects resource utilization

Buy Now
Questions 28

Consider the code fragment provided below:

CTAL-TTA Question 28

The comment frequency of the code fragment is 13%.

To which non-functional quality characteristic does a good level of comment frequency especially contribute?

Options:

A.

Portability

B.

Maintainability

C.

Usability

D.

Performance Efficiency

Buy Now
Questions 29

Which of the following are activities that the Technical Test Analyst performs when setting up a test automation project?

1.Schedule the manual testing

2.Define interface requirements between tools

3.Perform a code review on the functional specifications

4.Determine whether to use a rule-dnven approach

5.Tram the test analysts to use and supply the data

Options:

A.

1.2

B.

3. 5

C.

1.4

D.

2,5

Buy Now
Questions 30

Which of the following is a true statement regarding a continuous integration environment?

Options:

A.

Builds are done regularly every night

B.

Automation tools are used to verify the results of the build

C.

Unit testing is performed manually by the developers prior to code check in

D.

Performance efficiency testing is conducted for every accepted build

Buy Now
Questions 31

You work for a small supermarket chain which has successfully operated a product inventory application for several years. It has recently purchased a data warehousing solution which provides tailorable profiling of product purchases with the aim of improving its marketing strategy. The decision has been made to host the data warehousing software and database on the same server used by the product inventory application. Based on this decision, two product risks have been cataloged:

The co-existence of both applications on the same server may introduce resource conflicts, resulting in an unacceptable impact on the functionality of the product inventory application

In the event of loss or corruption of product inventory data during transfer to the warehouse, it may not be possible to restore from back-up in the timeframe required, resulting in lost business.

Which TWO non-functional test types should be included in the test plan to mitigate both product risks?

Options:

A.

Compatibility testing and Reliability testing

B.

Load testing and Portability testing

C.

Reliability testing and Stress testing

D.

Maintainability testing and Load testing

Buy Now
Questions 32

A new Payroll system calculates the amount of tax that each employee must pay (TaxToPay) on their gross monthly salary (in (), and the net salary (NetSal) that they will receive after that amount of tax has been deducted It also calculates the amounts of tax (TaxPdYTD) and net salary (SalPdYTD) paid in the year to date (YTD) by adding them to the stored amounts from last month (for month 1 these will be zero), inputs Include Employee id (Empid) and Gross Salary this month (GrossSal). Tax Rate is looked up on the key of Employee Id, the amounts of tax and net salary paid in the year to date are looked up on the key of (Employee Id and [month • 1]) except that for month 1 they will be zero.

if both employees were paid the same in month 1 as in the current month 2. for which tax has now to be calculated, which data-driven input and expected output table is correct for this situation?

Table 1

MonthEmpidGrossSalTaxRateTaxToPayNetSalTaxPdYTD

212000153001700600

222200204401760880

Table 2

MonthEmpidGrossSalTaxRateTaxToPayNetSalSalPdYTD

2120000.153001700600

2222000.24401760880

Table 3

MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD

11200030017006003400

12220044017608803520

Table 4

MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD

21200030017006003400

22220044017608803520

SELECT ONE OPTION

Options:

A.

Table 3

B.

Table 1

C.

Table 4

D.

Table 2

Buy Now
Questions 33

The following User story is being developed using the 8DD approach:

As a Purchasing Manager

i want to see a list of all Purchase Orders placed so far this month with their total value

So that I can control the amount of money being spent

Which scenario is BOTH written in correct Gherkin format AND is appropriate for this User Story9

SEI ECT ONE OPTION

Options:

A.

Given that three Purchase Orders with a total value of £21.75 have been placed so far this month AND the Purchasing Manager has navigated to the Purchase Order Reporting page

When the Purchasing Manager clicks the button 'List of Purchase Orders placed this month’

Then the 3 orders and their total value of £21.75 are displayed

B.

Given that three Purchase Orders with a total value of £21.75 have been placed so far this month

When the Purchasing Manager requests the list of Purchase Orders placed this month

Then the appropriate details are displayed

C.

Given that I am a Purchasing Manager AND three Purchase Orders with a total value of £21.75 have been placed so far this month

When I request the list of Purchase Orders placed this month

Then all orders and their total value of £21.75 are displayed

D.

Given that three Purchase Orders with a total value of £21.75 have been placed so far this month

When the Purchasing Manager requests the list of Purchase Orders placed this month

Then the 3 orders and their total value of £21.75 are displayed

Buy Now
Questions 34

A new web site has been launched for a testing conference. There are a number of links to other related web sites for information purposes. Participants like the new site but complaints are being made that some (not all) of the links to other sites do not work.

Which type of test tool is most appropriate in helping to identify the causes of these failures?

Options:

A.

Review tool

B.

Hyperlink tool

C.

Static analysis tool

D.

Dynamic analysis tool

Buy Now
Questions 35

Below is the pseudo-code for the bingo program:

CTAL-TTA Question 35

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?

Options:

A.

Variable "MIN" is not assigned a value before using it.

B.

Variable "AB is defined but subsequently not used.

C.

An invalid value is assigned to variable "B".

D.

The hard-coded value '2" should not be used.

Buy Now
Questions 36

BestFor Incorporated is a rapidly growing online financial services company that offers guidance to its customers on a range of financial products. Its first website, BestForMortgages, was launched two years ago, shortly followed by BestForPensions. The popularity of both sites has driven the company to expand its offerings into other sectors and a third website, BestForFood, has recently been released.

The first two websites have proven to be functionally robust but suffered from performance issues due to:

Underestimation of concurrent user access at peak times in its original operational profiles

Data volumes rapidly growing beyond expectations on a single database shared by both sites.

All three websites share the same web server.

The BestForFood system has been running live for several months, however the following significant non-functional defects have been recorded:

A) The layout and navigation of the BestForFood website was not considered by the users as consistent with BestForPensions and BestForMortgages

B) Soon after delivering the BestForFood system the performance of both BestForPensions and BestForMortgages noticeably slowed

C) The time taken to diagnose, repair and re-test production defects did not meet BestForFood service level agreements

D) BestForFood performance was adversely impacted by unexpected growth in data volumes

E) The time taken to install monthly builds into the production system exceeded agreed timescales.

Which TWO of these defects might have been prevented had portability testing and compatibility testing been employed?

Options:

A.

a and b

B.

c and e

C.

b and c

D.

a and d

Buy Now
Questions 37

You are responsible for planning the non-functional testing for a new product. You will be responsible for the performance testing and you have determined that you will need a simulator to complete your work, Which of the following are considerations when purchasing a simulator?

1.Path testing of the tool

2.Time to test the tool

3.cost of hmng specialists

4.Susceptibility to the "probe effect"

5.Method and bme to upgrade and retest the tool as the software changes

6.Control flow analysis

Options:

A.

1,4,6

B.

2, 3, 5

C.

4, 5,6

D.

1,2, 3, 4, 6

Buy Now
Questions 38

Which statement is correct with respect to fault injection tools?

Options:

A.

They modify the code under test in order to check the coverage achieved by specified tests

B.

They deliberately introduce incorrect inputs to a system to ensure it can withstand and recover from error conditions

C.

They inject defects into the SUT in order to test the error handling capabilities of test automation software

D.

They can detect memory leaks and wild pointers when a component is executing

Buy Now
Questions 39

Considering the following statements:

A) The data used for a test is held external to the automated script

B) The scope of an automated test suite is driven by the range of test data available

C) It uses a high-level language to separate the action to be performed on the test data from the test script

D) A spreadsheet is used to record the actions to be performed instead of the input data

Which of the following options is the correct selection of these statements to describe data-driven and keyword-driven automation?

Options:

A.

Data Driven = a; Keyword-driven = d

B.

Data Driven = b; Keyword-driven = c

C.

Data Driven = a; Keyword-driven = c

D.

Data Driven = d; Keyword-driven = d

Buy Now
Questions 40

Consider the pseudo code provided below regarding a customer request for cash withdrawal from an ATM.

If the customer has sufficient funds in their account

OR the customer has the credit granted

THEN the ATM machine pays out the requested amount to the customer

Which of the following test cases would be the result of applying multiple condition testing, but would NOT be the result of applying modified condition/decision testing?

Options:

A.

TC 1: Customer has sufficient funds. Credit has not been granted.

B.

TC 2: Customer does not have sufficient funds. Credit has been granted.

C.

TC 3: Customer does not have sufficient funds. Credit has not been granted.

D.

TC 4: Customer has sufficient funds. Credit has been granted.

Buy Now
Questions 41

Which statement is correct regarding the use of exploratory testing for safety critical systems?

SELECT ONE OPTION

Options:

A.

It should be used when black-box tests cannot be automated

B.

It is highly recommended for all risk levels

C.

It is not recommended, as manual black-box tests should be used instead

D.

It is highly recommended for low risk levels only

Buy Now
Questions 42

You are working for a company that has a product in the field that has reached its capacity. The system cannot handle any more users without a significant degradation in performance and a significant spike in resource requirements. As a result, your new product has strict requirements for performance efficiency and a specific growth requirement that is estimated for the next three years.

What type of testing should you conduct to make sure the future requirements will be met?

Options:

A.

Time-behavior testing

B.

Load testing

C.

Scalability testing

D.

Stress testing

Buy Now
Questions 43

As Technical Test Analyst on a test automation project covering the acquisition of a commercial test execution tool, what would you MOST likely be responsible for?

Options:

A.

Approving the estimated costs for implementing the test automation project

B.

Determining who will execute the automated tests

C.

Defining the business processes that will be used for keyword-driven testing

D.

Creating and supplying the data to be accessed by keyword-driven automation scripts

Buy Now
Questions 44

Consider the pseudo code for the Answer program:

CTAL-TTA Question 44

Which of the following statements about the Answer program BEST describes the control flow anomalies to be found in the program?

Options:

A.

The Answer program contains no control flow anomalies.

B.

The Answer program contains unreachable code.

C.

The Answer program contains unreachable code and an infinite loop.

D.

The Answer program contains an infinite loop.

Buy Now
Questions 45

Which statement about test automation is TRUE?

SELECT ONE OPTION

Options:

A.

The number of test cases in the test suite increases by default from one iteration to another

B.

Test suite coverage can be increased without the need for refactoring

C.

Test development time should not consider changes to the test environments)

D.

Staff availability should not be allowed to constrain automated deployment

Buy Now
Questions 46

which statement about test automation is TRUE7

SELECT ONE OPTION

Options:

A.

Test automation will increase the intervals at which continuous deployment to production can be achieved

B.

Test automation levels can be influenced by and can constrain the frequency of code deployments

C.

When continuous deployment is fully implemented there will be no need for manual testing

D.

When continuous deployment is fully implemented it will be necessary to automate only unit and integration tests

Buy Now
Questions 47

You are responsible for the performance testing of a new web application. In particular, you are interested in determining if you have enough and the right type of servers to handle 10,000 concurrent users. Which is the primary consideration when you are selecting your performance testing tools?

Options:

A.

The ability of the tool to support capture/replay

B.

The ability of the tool to detect invalid HTML

C.

The ability of the tool to exercise the graphical user interface to record the user experience

D.

The ability of the tool to generate load at the communications protocol level

Buy Now
Questions 48

Which of the following is a valid reason for including performance testing in a test approach?

Options:

A.

To reduce the threat of code insertion into a web page which may be exercised by subsequent users.

B.

To evaluate the system's tolerance to faults in terms of handling unexpected input values.

C.

To mitigate the risk of long response times to defects reported by users and/or customers.

D.

To evaluate the ability of a system to handle increasing levels of load.

Buy Now
Questions 49

A review of the following pseudo code is to be performed using a checklist:

Module Vowel Counter

Message: array of Characters

M, N: Integer

ACount, ECount, ICount, OCount, UCount: Integer

BEGIN

I=1

Read Nextchar

While Nextchar <> 'S'

DO

Message (I) = Nextchar

I = I+1

Read Nextchar

ENDWHILE

FOR M = 1 To I

DO

Print (Message(M))

IF Message (M) = 'E'

THEN

ECount = ECount + 1

ELSE

IF Message (M) = 'A'

THEN

ACount = ACount + 1

ELSE

IF Message (M) = 'I'

THEN

ICount = ICount + 1

ELSE

IF Message (M) = 'O'

THEN

OCount = OCount + 1

ELSE

IF Message (M) = 'U'

THEN

UCount = UCount + 1

ENDIF

ENDIF

ENDIF

ENDIF

ENDIF

ENDFOR

Print ('Message contains ' ACount + ECount + ICount + OCount + UCount ' vowels')

END

Which of the following checklist items would find code errors in this scenario?

A) Are all variables properly declared?

B) Are all loops, branches, and logic constructs complete, correct, and properly nested?

C) Are all cases covered in an IF-ELSEIF, including ELSE or DEFAULT clauses?

D) Are loop termination conditions obvious and invariably achievable?

E) Are there any redundant or unused variables?

Options:

A.

b and c

B.

a and e

C.

c and d

D.

a and d

Buy Now
Questions 50

Which option describes a good practice when applying test automation for a Regression-averse test approach?

SELECT ONE OPTION

Options:

A.

Developing and maintaining automated test checklists to efficiently execute a stable set of tests

B.

Applying BDD to produce automated tests before the implementation of a user story

C.

Focusing on the continuous improvement and refactoring of the automated tests

D.

Increasing automated test coverage to allow more time for exploratory testing

Buy Now
Questions 51

Which of the following is a reason for the Technical Test Analyst to take the time to prepare for a code review?

Options:

A.

Allows the reviewer time to consider the Interaction of the item being reviewed with other items In the system

B.

Allows time to prepare the test data

C.

Allows time to gather the test metrics for management review

D.

Allows time to plan the design and implementation of the item being reviewed

Buy Now
Exam Code: CTAL-TTA
Exam Name: Certified Tester Advanced Level Technical Test Analyst
Last Update: Jan 15, 2026
Questions: 175

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99