The annual utility bill at a hospital is $1.2M for a 500,000 sq. ft. facility. The current construction project will add 100,000 sq. ft. to the facility. What is the anticipated annual utility budget after the construction project is completed?

Options:

A.

$240,000

B.

$1,440,000

C.

$1,728,000

D.

$1,828,000

Buy Now
Questions 5

Where a required fire alarm system is out of service for more than 4 hours in a 24-hour period, which of the following is required according to NFPA Life Safety Codes?

Notify the authority having jurisdiction.

Provide an approved fire watch for all parties left unprotected by the shutdown.

Notify the building administrator.

Notify the fire alarm service company for repair.

Options:

A.

1 and 2 only

B.

1 and 3 only

C.

2 and 4 only

D.

3 and 4 only

Buy Now
Questions 6

Which of the following is required for airborne infection isolation rooms?

Options:

A.

HEPA filter recirculation unit with UV light

B.

minimum of 20 air changes per hour

C.

anteroom with an area for handwashing

D.

visual mechanism to monitor room pressure

Buy Now
Questions 7

To minimize the number of change orders, it is best to have

Options:

A.

complete plans and specifications.

B.

a builder's insurance policy and performance bond.

C.

multiple prequalified bidders.

D.

a qualified construction manager and subcontractors.

Buy Now
Questions 8

Which of the following should be considered when determining the simple payback of an energy-saving alternative?

Options:

A.

annual operating cost

B.

annual rate of inflation

C.

replacement cost

D.

life of the equipment

Buy Now
Questions 9

The following information is available:

CHFM Question 9

Which building has the best overall building condition?

Options:

A.

1

B.

2

C.

3

D.

4

Buy Now
Questions 10

CHFM Question 10

(Base Bid / Alternate A / Alternate B)

Company A: $18,000 / $2,000 / Not available

Company B: $20,000 / $3,000 / Included

Company C: $19,000 / $4,000 / $500

Company D: $19,000 / $4,000 / $1,000

Which company has the LOWEST cost if alternate B is chosen?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 11

In which type of boiler do the gases of combustion pass through tubes surrounded by water?

Options:

A.

water tube

B.

fire tube

C.

vertical tube

D.

cast iron sectional

Buy Now
Questions 12

As part of developing a HVA, which of the following elements should be considered?

events affecting demand for hospital services

cost of addressing the events

consequences of the events

likelihood of the events occurring

Options:

A.

1, 2, and 3 only

B.

1, 2, and 4 only

C.

1, 3, and 4 only

D.

2, 3, and 4 only

Buy Now
Questions 13

The occupants of a building wing complain of nausea, dizziness, or drowsiness. Which of the following is the most likely cause?

Options:

A.

mercury spill

B.

humidity levels

C.

insufficient outside air

D.

medical gas leak

Buy Now
Questions 14

Regulated medical waste should be handled in which of the following ways?

Options:

A.

labeled with specific content

B.

refrigerated at 40° F

C.

incinerated within 10 days of collection

D.

separated from other types of waste

Buy Now
Questions 15

Which scenario is best for managing an inventory of repair parts?

Options:

A.

Purchase spare parts from suppliers as replacements are needed.

B.

Purchase critical spare parts from suppliers on an annual basis.

C.

Purchase one spare part in inventory for all patient equipment parts in use.

D.

Purchase one spare part in inventory for each part in use.

Buy Now
Questions 16

Which section of the National Electrical Code addresses the installation of electrical wiring within healthcare facilities?

Options:

A.

Article 514

B.

Article 517

C.

Article 551

D.

Article 555

Buy Now
Questions 17

When a motor malfunctions on an air handler, what is the first step to be taken in the replacement of the motor?

Options:

A.

Megger the motor windings.

B.

Remove the motor/machine guard.

C.

Disconnect the power wiring.

D.

Initiate lockout/tagout procedures.

Buy Now
Questions 18

According to OSHA, which of the following is required as part of a lockout/tagout program?

Options:

A.

insulated tools

B.

written activity logs

C.

flame-resistant clothing

D.

staff training program

Buy Now
Questions 19

When storing oil or petroleum products over 1,320 gallons above ground or 42,000 gallons underground, a Spill Prevention, Control, and Countermeasure (SPCC) program is required in accordance with

Options:

A.

Federal Regulations 40 CFR Part 112 Oil Pollution Act.

B.

The Joint Commission Utility Management standards.

C.

OSHA Regulations 1926.153 Liquefied Petroleum Gas Act.

D.

NFPA 430 Storage of Liquid and Solid Oxidizers.

Buy Now
Questions 20

What is the required fire rating of a door in a 2-hour rated wall assembly?

Options:

A.

1/2 hour

B.

1 hour

C.

1 1/2 hours

D.

2 hours

Buy Now
Questions 21

Which of the following methods could be used to reduce the cost of a service contract without reducing the scope of service?

Implement an in-house first response program.

Increase the frequency of house calls.

Finance the cost of the contract.

Extend the length of the contract.

Options:

A.

1 and 3 only

B.

1 and 4 only

C.

2 and 3 only

D.

2 and 4 only

Buy Now
Questions 22

Medical gases normally found in a patient room include

oxygen.

medical air.

nitrogen.

vacuum.

Options:

A.

1, 2, and 3 only

B.

1, 2, and 4 only

C.

1, 3, and 4 only

D.

2, 3, and 4 only

Buy Now
Questions 23

In order to ensure a safe environment for patients, what department must be involved during the planning of all construction projects?

Options:

A.

Information Technology

B.

Biomedical Engineering

C.

Patient Services

D.

Infection Control

Buy Now
Questions 24

The occupants of a building wing complain of nausea, dizziness, or drowsiness. Which of the following is the most likely cause?

Options:

A.

mercury spill

B.

humidity levels

C.

insufficient outside air

D.

medical gas leak

Buy Now
Questions 25

Which of the following are used to establish a salary range for a new job category?

market salary analysis

candidate qualifications

review of internal equity

job description

Options:

A.

1, 2, and 3 only

B.

1, 2, and 4 only

C.

1, 3, and 4 only

D.

2, 3, and 4 only

Buy Now
Questions 26

A construction project in a cafeteria should not start until which of the following is present?

Options:

A.

approval from a clinical director

B.

funding

C.

staffing

D.

security authorization

Buy Now
Questions 27

At the end of an 8-hour electrical shutdown, after the maintenance work is completed but before the cabinets are closed up or the system re-energized, a final inspection should be completed by individuals who have

Options:

A.

been involved since the beginning of the shutdown.

B.

"fresh eyes" and go/no go authority.

C.

working knowledge of the generators and switch gear.

D.

gathered feedback and attended the lessons learned debriefing.

Buy Now
Questions 28

Fire doors used within a means of egress shall be

Options:

A.

magnetically held open and labeled.

B.

metal with vision panels.

C.

self-closing and positive latching.

D.

self-closing and smoke tight.

Buy Now
Questions 29

A primary-secondary chilled water system typically has variable volume pumping on the

Options:

A.

secondary loop.

B.

open loop.

C.

primary loop.

D.

cooling tower loop.

Buy Now
Questions 30

Life Safety Code® requires which of the following in an on-call sleep room?

Options:

A.

smoke alarm

B.

rated door

C.

emergency call button

D.

bathroom

Buy Now
Questions 31

A justification for having an institutional standard for a ball valve instead of a gate valve is that ball valves

Options:

A.

handle higher temperatures.

B.

last longer.

C.

are easier to inventory.

D.

have packing that is easily replaced.

Buy Now
Questions 32

Which of the following types of injuries is most likely to occur during an MRI scanning process?

Options:

A.

visual impairment

B.

radiation overexposure

C.

permanent hearing loss

D.

missile projection

Buy Now
Questions 33

Which of the following building fire alarm system components is required to be tested quarterly?

Options:

A.

duct detectors

B.

door electromechanical releasing devices

C.

supervisory signal devices

D.

water flow devices

Buy Now
Questions 34

Which of the following is classified as regulated medical waste by the EPA?

Options:

A.

fluorescent light bulbs

B.

blood-saturated gauze

C.

urine-soaked pads

D.

home-use sharps

Buy Now
Questions 35

A facility manager has to prepare a labor budget for an upcoming addition of a new patient wing. Budgetary needs will include:

— Two carpenters at $40 per hour for 20 hours a week for project work for 78 weeks

— Two carpenters at $40 per hour for 20 hours a week for maintenance work for 78 weeks

— One laborer at $20 per hour for 40 hours a week for project work for 78 weeks

— One supervisor at $45 per hour for 10 hours a week for project work for 104 weeks

— One supervisor at $45 per hour for 10 hours a week for maintenance work for 104 weeks

What is the correct budget assignment, without any benefits?

Options:

A.

Project budget = $171,600 and Operations budget = $171,600

B.

Project budget = $171,600 and Operations budget = $234,000

C.

Project budget = $234,000 and Operations budget = $171,600

D.

Project budget = $234,000 and Operations budget = $234,000

Buy Now
Exam Code: CHFM
Exam Name: Certified Health Care Facility Manager (CHFM)
Last Update: Nov 19, 2026
Questions: 118

PDF + Testing Engine

$139.99

Testing Engine

$104.99

PDF (Q&A)

$89.99