Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: netbudy65

PDD ARE 5.0 Project Development and Documentation Exam Questions and Answers

Questions 4

A wall separating a distillery and a taproom must meet which of the following requirements based on a flammable liquid presence?

Options:

A.

1-hour fire barrier

B.

2-hour fire wall

C.

1-hour smoke partition

D.

3-hour fire barrier

Buy Now
Questions 5

Which of the following is an advantage of using a glycol-cooled air conditioning unit for a computer room?

Options:

A.

It allows for a greater distance from the computer room to the outside unit.

B.

Glycol is cheaper than water for cooling.

C.

It reduces the amount of heat exhausted from the computer room.

D.

Glycol units are a sustainable cooling solution.

Buy Now
Questions 6

The building permit plan review for a small, two-story residential project with a crawlspace issues the following comment to the architect:

"No under floor access shown in plans. Please locate and note locations of under floor access."

Site conditions will not allow access to the crawlspace from the exterior.

What drawing will the architect need to update to satisfy the reviewer's comment?

Options:

A.

Second Floor Framing Plan

B.

Main Floor Framing Plan

C.

Foundation Plan

Buy Now
Questions 7

PDD Question 7

PDD Question 7

An architect is designing a school building that features a flat roof with a low parapet wall in a wet climate region. The client wants to minimize maintenance requirements and focus on keeping water from the walls.

What parapet coping detail would be most appropriate for the architect to select for this project?

Options:

A.

A

B.

B

C.

C

Buy Now
Questions 8

Which of the following documents would the architect need in order to prepare the specifications?

Options:

A.

Legal survey, engineering drawings, and door schedule

B.

Legal survey, geotechnical report, and traffic management plan

C.

Geotechnical report, building sections, and room finish schedule

D.

Architectural floor plans, room finish schedule, and traffic management plan

Buy Now
Questions 9

Which of the following methods of mortar joint finishing has the greatest weatherability?

Options:

A.

Weathered

B.

Extruded

C.

Raked

D.

Concave

Buy Now
Questions 10

A revolving door is to be mounted in the facade of a building. Story drift is limited to 0.002 times story height in any direction. The door can tolerate a maximum departure from vertical of 1/4 inch.

What is the maximum height the door can be to accommodate the story drift?

Options:

A.

8 ft

B.

9 ft

C.

10 ft

D.

11 ft

Buy Now
Questions 11

PDD Question 11

Refer to the exhibit.

Which device allows for piping misalignment and isolation?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 12

The single-line diagram for the electrical distribution system shown is for a multi-family project.

Click in the box on the single-line diagram where the transformer is located.

PDD Question 12

Options:

Buy Now
Questions 13

PDD Question 13

Refer to the exhibit.

The construction method shown in the detail should be used to prevent cracking in which of the following situations?

Options:

A.

Structural steel frame buildings with plaster ceilings

B.

Concrete frame buildings with drywall suspended ceilings

C.

Concrete flat slab buildings with exposed slab ceilings

D.

Exposed structural steel frame with no partitions to the structure

Buy Now
Questions 14

PDD Question 14

Refer to the exhibit.

What set of conductors should the building fluorescent Lighting be connected to?

Options:

A.

A, B

B.

C, A, B

C.

C,N

D.

C,A,N

Buy Now
Questions 15

A construction detail for a window sill shows metal flashing terminating behind the exterior cladding. Which principle is being demonstrated?

Options:

A.

Air barrier continuity

B.

Structural redundancy

C.

Thermal bridging

D.

Water management

Buy Now
Questions 16

PDD Question 16

Refer to the exhibit.

In the diagram shown, what is the purpose of the pressure relief valve?

Options:

A.

Regulate water pressure fluctuation

B.

Vent the tank of accumulated air

C.

Allow for thermal expansion of water

D.

Relive negative pressure when draining the tank

Buy Now
Questions 17

Which elevator type is the most appropriate choice for a 15-story high-rise residential condominium where speed and noise are considerations?

Options:

A.

Holed hydraulic

B.

Hole-less hydraulic

C.

Geared traction

D.

Gearless traction

Buy Now
Questions 18

Why is the vertical surface of a dry-stacked stone wall often battered into the retained material?

Options:

A.

Increased resistance to soil thrust

B.

Increased resistance to surface erosion of the wall

C.

Increased impermeability that reduces equivalent fluid pressure

D.

Increased cohesion between individual stones that make up the wall

Buy Now
Questions 19

In a brick veneer wall, what is the primary purpose of the 2-inch air space between the back of the brick and the sheathing?

Options:

A.

To meet the minimum R-value

B.

Allow for differential movement

C.

Provide space for roof drain piping

D.

Minimize mortar bridging

Buy Now
Questions 20

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

Brewing and distilling will operate year-round.

Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

The Market area will feature local farm products and is not conditioned.

Entire building will be fully sprinklered.

Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

Public water and sewer is not available at the Project Site.

Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

Architectural Drawings, including plans, elevations, sections, and schedules

Consultant Drawings, including structural, HVAC, power distribution, and plumbing

PEMB Shop Drawings

Design and Construction Schedule

Specification Excerpts, showing relevant spec sections

IBC and ADA Excerpts, showing relevant code and accessibility sections

After reviewing the documents, the architect discovers a coordination issue in the corridor.

The architect is preparing the project manual.

What section should be included?

Options:

A.

006113 Performance and Payment Bond

B.

012300 Alternates

C.

015000 Temporary Utilities

D.

019113 General Commissioning Requirements

Buy Now
Questions 21

PDD Question 21

Refer to the exhibit.

An architect is developing an electrical diagram to show equipment configuration and flow of electricity for a residential project. The project is integrating on-site wind generation where the utility company does not allow net metering.

Which diagram meets the project requirements?

Options:

A.

Diagram A

B.

Diagram B

C.

Diagram C

Buy Now
Questions 22

PDD Question 22

Refer to the exhibit.

What is the purpose of the flexible connection in the fan coil shown?

Options:

A.

To provide a field point of connection of the ductwork to the fan coil unit

B.

To insulate against heat transfer from the fan coil unit

C.

To minimize sound transfer

D.

To transition from the fan coil unit flange to the desired duct size

Buy Now
Questions 23

Owners of a busy two-story theater complex want to renovate. The new renovations include increasing the second floor lobby and doubling the number of second floor movie screens. The owner favors the use of escalators. Movies are scheduled to start simultaneously every three hours. The theater currently has a pair of 24-inch-wide parallel escalators, one of which goes up and the other down.

Which of the following should be proposed to accommodate the increased traffic to the second floor?

Options:

A.

Increase the existing escalator speeds to 130 fpm

B.

Install a new elevator in the lobby

C.

Install a new escalator that reverses direction

D.

Extend balustrades at escalator landings

Buy Now
Questions 24

Temporary shoring of a masonry wall should remain in place until what point?

Options:

A.

Mortar joints are struck

B.

Lateral bracing connections are complete

C.

Horizontal reinforcing is installed

D.

Foundations are backfilled

Buy Now
Questions 25

Which of the following best explains the function of Division 01 in the specifications?

Options:

A.

Describes specific materials and installation

B.

Details bidding and contract forms

C.

Establishes general administrative requirements

D.

Identifies drawing scales and symbols

Buy Now
Questions 26

In an air-conditioned space in a tropical environment, roof insulation is being applied above a structural deck. In order to avoid problems related to condensation, where should the vapor barrier be installed?

Options:

A.

Above the insulation

B.

Below the insulation

C.

Below the structural deck

D.

Below the ceiling

Buy Now
Questions 27

Which document is the most appropriate location for specifying the finish material for casework?

Options:

A.

Construction Drawings

B.

Outline Specifications

C.

Project Manual – Division 06

D.

General Conditions

Buy Now
Questions 28

The architect has completed 60% of the construction documents. The owner wants to establish the guaranteed maximum price (GMP) at this point before 100% of the construction documents are complete. Several flooring finish items are still undetermined.

What should be included in the project manual to make sure the contractor has a cost to cover all finishes?

Options:

A.

Contingency of 10% added to the overall construction cost

B.

Schedule of flooring unit prices to be completed by the contractor

C.

Allowance of $30/sq. yd. for floor finishes

D.

Alternate to change broadloom carpet to carpet tile

Buy Now
Questions 29

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

Per the current energy code, the building envelope requirement for walls above grade in this climate zone is R13 + R10c.i.

What specification section must be added to the project?

Options:

A.

Specification Section 072119: Foamed-In-Place Insulation

B.

Specification Section 075419: Polyvinyl-Chloride (PVC)

C.

Specification Section 072100: Thermal Insulation

Buy Now
Questions 30

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner requests that the metal panel skin be changed to EIFS.

Which of the following architectural sheets require changes to the notes and/or details? Check the three that apply.

Options:

A.

A-00

B.

A-02

C.

A-03

D.

A-04

E.

A-06

F.

A-07

Buy Now
Exam Code: PDD
Exam Name: ARE 5.0 Project Development and Documentation Exam
Last Update: Sep 11, 2025
Questions: 100

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99