AgilePM-Practitioner Agile Project Management (AgilePM) Practitioner Exam Questions and Answers

Questions 4

An external web developer is to be contracted to create the new coffee bar

insurance area on the existing web site. The chosen web developer will only

agree to work on a 'fixed price for a fixed specification' contract.

What action should the Project Manager take?

Options:

A.

Ensure the later elements of the project reflect the most valuable features

of the product being built by the contractor.

B.

Agree to a 'fixed price for a fixed specification' contract with a requirement

for the web developer to provide daily progress reports.

C.

Refuse to employ the chosen web developer as this is not an Agile

approach to project management.

D.

Divide the work into component parts to ensure the web developer is

focused on, and is paid to deliver, only what is specified for each

component.

Buy Now
Questions 5

Using the Project Scenario and the additional information provided for

this question in the Scenario Booklet, answer the following question

about assigning the Agile Project Management team roles within this

project.

Lines 1 to 5 in the table below consist of an assertion statement and a

reason statement. For each line identify the appropriate option, from options

A to E. that applies. Each option can be used once, more than once or not

at all.

AgilePM-Practitioner Question 5

Options:

Buy Now
Questions 6

Which 2 actions should the Business Visionary take to implement the new

Must Have requirement?

Options:

A.

Send a company-wide communication to explain the implications of the

business change to all interested parties.

B.

Assess the impact of the new Must Have requirement on the original

Business Case.

C.

Source and hire a web developer with experience in developing online

financial transaction functionality.

D.

Ensure the marketing and sales teams are working together to deliver the

most effective outcome.

E.

Consolidate and circulate an agenda for the workshop.

Buy Now
Questions 7

Which 2 statements explain why the Timber Tigers' Site Manager would be an appropriate Solution Developer?

Options:

A.

Accustomed to bringing in contract staff for short periods of time.

B.

Closely manages the building team so that they consistently produce high-quality work.

C.

Is able to represent the team in all daily meetings.

D.

An experienced builder who is good at turning a brief into a practical design.

E.

Is empowered by Timber Tigers' management to make decisions on the building work.

Buy Now
Questions 8

Answer the following questions about the acceptance criteria within the project.

Decide whether the approach to setting and using acceptance criteria has been applied appropriately and select the response that supports your decision.

The objective of Solution Development Timebox B is to ensure that the front and east wings are finished and approved. The Project Manager has pointed out that acceptance criteria for this part of the solution need to be agreed.

Is this an appropriate action related to acceptance criteria?

Options:

A.

Yes, because this will allow the Solution Development Team to focus on the quality of the Solution Development Timebox's deliverable as a whole, in order to keep focus on the business need.

B.

Yes, because it will be easier to set acceptance criteria for the Solution Development Timebox as a whole, rather than setting specific acceptance criteria for each individual requirement.

C.

No, because the acceptance criteria for the Solution Development Timebox are just the amalgamation of the individual requirements' acceptance criteria, with nothing extra.

D.

No, because the Solution Development Timebox objective will change if any new requirements emerge or any lower priority requirements are de-scoped.

Buy Now
Questions 9

What action should the Project Manager take during the Close-Out of Timebox C?

Options:

A.

Remove 'Aspects' from the supplier list for all future projects.

B.

Carry out final checks to ensure the deliverables of Timebox C meet the expected standards.

C.

Ensure that lessons are learned so that similar issues do not occur in future Timeboxes.

D.

Initiate the work required to complete the windows to the required standard.

Buy Now
Questions 10

Which 2 actions should the Technical Coordinator take to implement the new

Must Have requirement?

Options:

A.

Ensure that the latest version of the website design in the Solution

Architecture Definition is provided to all members of the Solution

Development Team.

B.

Assess the impact of the new Must Have requirement on the original

Business Case.

C.

Add the additional tasks required to create the financial transaction

functionality to the Timebox Plan.

D.

Consolidate and circulate an agenda for the workshop.

E.

Check for any documented standards which need to be applied to the

development of online financial transaction functionality.

Buy Now
Questions 11

How should the Project Manager assist the plumbers to deliver the plumbing?

Options:

A.

Split the entire Solution Development Team into smaller teams covering specific locations of the house.

B.

Decide on the location of the radiators on behalf of Architecture Angels.

C.

Establish an inter-team competition to see which team can complete first.

D.

Approve each Timebox before work continues in the next.

Buy Now
Questions 12

Which 2 individuals would be suitable for the role of Workshop Facilitator?

Options:

A.

Team Leader

B.

IT Operations Manager

C.

Marketing Director

D.

Software Developer

E.

Project Manager

Buy Now
Questions 13

Using the Project Scenario and the additional information provided for this question in the Scenario Booklet, answer the following questions about Feasibility.

Remember to limit your answers to the number of selections requested in each question.

Which 2 statements describe the appropriate application of Agile Project Management when developing the Solution Architecture Definition (SAD)?

Options:

A.

Paper-based drawings are to be used for each option being considered for the building and gardens.

B.

The SAD must include a physically-built miniature model of the Hoy Hall building.

C.

The Architecture Angels' Marketing Director can request a SAD to illustrate the achievability of complex elements of the solution.

D.

The views of the 'Hoy for Hoy Hall' Action Group members are NOT relevant to the business decision made by Architecture Angels' Finance Director when approving the final option.

E.

The SAD should contain high-level costs for all elements of each solution option.

Buy Now
Questions 14

The Close Out of Timebox B was completed as scheduled, but the Could Have requirement of tiled walls in the bathrooms was NOT delivered within this period, with the

agreement of the team.

Which Agile principle MOST influences this course of action?

Options:

A.

Deliver on time.

B.

Never compromise quality.

C.

Build incrementally from firm foundations.

D.

Develop iteratively.

Buy Now
Questions 15

Which 2 statements explain why the Architecture Angels' Marketing Director would be an appropriate Business Visionary?

Options:

A.

Is a friend of the Architecture Angels' Chief Executive.

B.

Is fully committed to changing the company's strategic direction to include hotel renovation.

C.

Is one of the original four founders of the company.

D.

As a Director, will ensure that the project is NOT driven by the cost-consciousness of the Finance Director in the role of Business Sponsor.

E.

Has a passion for old buildings and can see the potential for business opportunity.

Buy Now
Questions 16

If the team cannot agree the system content, which 2 actions should the Workshop Facilitator take?

Options:

A.

Present own interpretation of what the system should include.

B.

Present the group with a predefined specification of what should be included.

C.

Facilitate the creation of a list of actions to be carried out after the workshop, to resolve the issue.

D.

Agree to disagree, and close the workshop acknowledging that all participants are entitled to their own view.

E.

Prepare a report describing the outcome of the workshop.

Buy Now
Questions 17

Which 2 statements explain why the Contract Architect would be an appropriate Technical Co-ordinator?

Options:

A.

Is an external consultant.

B.

Has good leadership skills.

C.

Has experience of working with the company previously.

D.

Has a good, technical understanding of the work of the other professionals engaged in the project.

E.

Is an authority on local planning applications.

Buy Now
Questions 18

Using the Project Scenario and the additional information provided for this question in the Scenario Booklet, answer the following question about the

responsibilities of the roles in the Agile team.

Lines 1 to 5 in the table below consist of an assertion statement and a reason statement. For each line identify the appropriate option, from options A to E, that applies.

Each option can be used once, more than once or not at all.

AgilePM-Practitioner Question 18

Assertion

    The Marketing Director, in the role of Business Visionary, is empowered to overrule cost restrictions advised by the Chief Accountant, who is appointed as Business Ambassador.

BECAUSE

The Project-level roles are responsible for directing, managing and co-

ordinating the project.

    The Procurement Manager is an appropriate representative of the end user of the solution.

BECAUSE

The Business Ambassador should be empowered to make decisions within

the boundaries of their role, without referral to higher authorities outside

the Solution Development Team.

    The other specialist gardening team members from Earth Excavations would be suitable as Solution Developers, assigned alongside the Head Landscape Gardener.

BECAUSE

Extra Solution Developers can provide a supporting role for a Lead

Developer.

    The 'Hoy for Hoy Hall' Action Group members should be assigned as Business Ambassadors.

BECAUSE

The Business Ambassador is responsible for ensuring that business needs

are properly analysed.

    The Project Manager should plan the communication needed between the Marketing Director, in the role of Business Visionary, and the 'Hoy for Hoy Hall' Action Group.

BECAUSE

The Business Visionary is responsible for promoting the business vision to

all interested parties.

AgilePM-Practitioner Question 18

Options:

Buy Now
Questions 19

Using the Project Scenario answer the following question about the technical quality of the solution to be delivered. An assessment of the maintenance requirement for the new reservation system was made during Feasibility.

Column 1 describes a list of different types of hotel reservation systems considered. Column 2 lists the three DSDM maintainability objectives. For each description in Column 1, select from Column 2 the maintainability objective it would support.

Each selection from Column 2 can be used once, more than once or not at all.

Column 1:

1. Off-the-shelf software with ready-to-use templates that will need to be customised to fully

meet Hoy Hall requirements, after deployment.

2. Developing a fully functioning in-house system, developed and hosted by Architecture

Angels IT Operations team.

3. All-in-one web-based reservation and accommodation management system built to Hoy Hall's

specification.

4. All bookings for Hoy Hall to be scheduled by one of the other two hotels within the group,

until a suitable system can be implemented at the site.

5. A spreadsheet is used to capture customer details manually. Data will then be exported into a fully functional system at a later date.

Column 2

    Maintainability is a required attribute of the initial delivered solution

    Deliver first, re-engineer later

    Short-term, tactical solution

AgilePM-Practitioner Question 19

Options:

Buy Now
Questions 20

The Head Landscape Gardener liaised with several key stakeholders before changing the direction of the pathway around the grounds to ensure all of the new features in

the gardens could be enjoyed.

Which Agile principle MOST influences this course of action?

Options:

A.

Focus on the business need.

B.

Deliver on time.

C.

Collaborate.

D.

Never compromise quality.

Buy Now
Questions 21

Answer the following questions about the tracking and control activities carried out within the project.

Decide whether each activity has been applied appropriately and select the response that supports your decision.

During Foundations, the key stakeholders had very different views about the content and prioritisation for the high-level requirements. As a result, the Project Manager

organized a Facilitated Workshop with the project team to discuss and agree the requirements.

Is this an appropriate application of Agile Project Management for this project?

Options:

A.

Yes, because discussing requirements in the presence of project stakeholders will promote communication and buy-in.

B.

Yes, because this will allow each team member working in a Timebox to raise any issues which may hinder their progress.

C.

No, because early and frequent delivery of the product features will on its own be sufficient to maintain engagement with the stakeholders.

D.

No, because a Review Session should have been scheduled to enable the Solution Development Team to validate their understanding of the stakeholders'

expectations.

Buy Now
Questions 22

Resources are limited. The Sales Manager has two marketing assistants who

may be able to give a few hours a week between them to the project.

What action should the Project Manager take?

Options:

A.

Try to secure formal agreement as to how many hours per week the

marketing assistants will spend on the project.

B.

Accept that members of the Solution Development Team will be

inconsistent.

C.

Make each Timebox as long as possible to ensure the marketing

assistants have enough time to complete any work allocated to them

within the boundaries of the Timebox.

D.

Schedule the two marketing assistants to work at different times so they

can hand matters over to one another.

Buy Now
Questions 23

Which 2 statements represent appropriate entries for the Prioritised

Requirements List?

Options:

A.

Creation of a new coffee shop insurance product on the existing website

is expected to increase the insurance company's revenues by up to 10%

per week.

B.

All correspondence sent to coffee shop owners by the new system should

contain the XAN logo in the top left hand corner of the page.

C.

Further website developments to allow existing customers to access

services online are NOT to be included within the scope of this project.

D.

The Business Visionary will provide a formal acceptance of the coffee

shop insurance product.

E.

An assessment will be made of the effectiveness of the techniques used

on the project, in line with the principles of Agile Project Management.

Buy Now
Questions 24

Column 1 is a list of individuals from within the Xan Insurance Company

and their key responsibility within the Web project.

For each individual in Column 1, select from Column 2 the Agile Project

Management team role they are fulfilling. Each selection from Column 2 can

be used once, more than once or not at all.

Column 1

Manager of Web & Digital

Media - will oversee and report

progress on the delivery of the

overall system.

Finance Director - has

budgetary control and will

release finance for the project

subject to expected benefits.

Sales Manager - will formulate

design options for new

business processes that do not

adversely affect business as

usual.

Operations Manager - oversees

the design and integrity of the

technical aspects of the

solution.

Column 2

    Business Sponsor

    Business Analyst

    Business Ambassador

    Business Advisor

    Solution Developer

    Technical Coordinator

    DSDM Coach

    Project Manager

AgilePM-Practitioner Question 24

Options:

Buy Now
Questions 25

Several of the web developers working on the project have no Agile

experience. When answering the questions in the Project Approach

Questionnaire (PAQ), the Project Manager could not agree with the statement

'all members of the project understand and accept the DSDM approach'.

What action should the Project Manager take?

Options:

A.

Replace the web developers with experienced Agile practitioners.

B.

Agree with the statement in the PAQ and keep a close watch on the web

developers throughout the project.

C.

Organize a training workshop to brief all project-level and Solution

Development Team roles in the Agile approach.

D.

Accept that the web developers are experts in their field and will be

adopting their own approach throughout the project.

Buy Now
Questions 26

The Solution Development Team are progressing through the first Structured

Timebox.

What should the Project Manager do to lead the team at this time?

Options:

A.

Maintain a tight control on progress, recording all discussions and making

all decisions.

B.

The Project Manager should do nothing during a Timebox.

C.

Attend the Daily Stand-up and discuss any problems at the end.

D.

Update the Team Board with a summary of team progress and the current

status of work.

Buy Now
Questions 27

The Solution Development Team are progressing through the first Structured

Timebox.

What should the Project Manager do to lead the team at this time?

Options:

A.

Maintain a tight control on progress, recording all discussions and making

all decisions.

B.

The Project Manager should do nothing during a Timebox.

C.

Attend the Daily Stand-up and discuss any problems at the end.

D.

Update the Team Board with a summary of team progress and the current

status of work.

Buy Now
Questions 28

Time is running short and the Must Have requirements for the data entry screen

of the web page, as recorded in the Prioritised Requirements List, are not going

to be completed on time.

What action should the Project Manager take?

Options:

A.

Change the end date of the Timebox.

B.

Ensure that this issue is escalated to the project level roles.

C.

Amend the end date in the Delivery Plan.

D.

Accept that the Must Have requirements will not be delivered on time.

Buy Now
Questions 29

Which item is MOST likely to be considered as a pain point for a ‘Sales team member’ stakeholder?

Options:

A.

Rebranding gives the company a modern look that has been missing historically.

B.

Comprehensive training is required to broaden skills, that are recognized as best practice.

C.

Increased effort will be needed initially to learn the new supporting business processes.

D.

This gives an opportunity for all staff to be involved and engaged in shaping the change.

Buy Now
Questions 30

Which 2 actions demonstrate empathy?

Options:

A.

Allow people to think independently and plan for themselves how this Change Programme could be incorporated.

B.

Hold a weekly progress meeting with key UniCo and Selco staff dedicated to the delivery of the new contract.

C.

Provide statistical data on the general trends in the mobile application industry to help people rationalize why this change is necessary.

D.

Reschedule plans to allow extra time for those IT support staff who are finding it difficult to try out the new processes.

E.

Encourage the CEO to discuss their previous concerns about the new company direction with staff who feel uncertain.

Buy Now
Questions 31

The Change Manager is looking to develop the change agent network that will support the changes related to the Operational delivery processes workstream.

Which information is MOST likely to be relevant for the change agents when being inducted into the change programme for the Operational delivery processes workstream?

Options:

A.

Expected new ways of working for UniCo technical delivery.

B.

Staff contact details for the Operations department – UniCo and Selco.

C.

Annual UniCo staff satisfaction survey results.

D.

Portfolio, Programme, and Project Management Office Service Catalogue.

Buy Now
Questions 32

The Applications Manager agreed to the acquisition by UniCo because they knew that growing Selco needed more investment than they could raise and that they personally didn’t have the skill set to move from technical leader to business leader.

Which preference does this behavior BEST display?

Options:

A.

Extravert.

B.

Introvert.

C.

Thinking.

D.

Feeling.

Buy Now
Questions 33

Answer the following question about Schein's concept of survival and learning

anxieties.

Column 1 is a list of messages about the change given to Sales staff. For each

message in Column 1, select from Column 2 the appropriate element of

Schein's concept of survival and learning anxieties. Each selection from

Column 2 can be used once, more than once or not at all.

AgilePM-Practitioner Question 33

AgilePM-Practitioner Question 33

Options:

Buy Now
Questions 34

Which tool is likely to be the MOST useful in a co-design workshop for summarizing staff or customer reactions to a situation?

Options:

A.

Project plan.

B.

Empathy map.

C.

McKinsey 7s Model.

D.

Establish and discuss basic principles for interaction at the start of the workshop.

Buy Now
Questions 35

Two Sales staff members appear to have lost energy for the change process and did not attend recent change meetings. When questioned, they said they were so overwhelmed by the number of changes in systems, materials, technical knowledge, and processes that they couldn’t deal with any more.

Which 2 actions by the Sales Director are the MOST appropriate when responding to this type of resistance from staff?

Options:

A.

Find out which elements could remain unchanged so that future sales are unaffected.

B.

Add personal staff targets to ensure that the changes in the sales operations are continued.

C.

Assign the staff members to projects outside of this change, to prevent them undermining the changes needed.

D.

Consider limiting the changes to those that are related to each other during each iteration of change in sales.

E.

Ensure these staff members are rewarded for raising issues with the implementation.

Buy Now
Questions 36

The Change Manager is discussing the relocation of the Selco staff to the UniCo office with the Operations Director. They are using the SCARF framework of people's social experience to guide management actions.

Answer the following questions about the use of David Rock's SCARF framework to increase the motivation for change.

The founder of Selco, now the Applications Manager, is moving from an individual office to a desk in the shared area for the Operations Director's leadership team in the UniCo building. At the last Operations' group meeting, the Operations Director thanked the Applications Manager for cooperating fully with the relocation.

Is this an appropriate approach to reward the brain in the need for 'status', and

why?

Options:

A.

No, because 'status' should be rewarded by ensuring open, two-way

communication using rich channels.

B.

No, because the Application Manager's knowledge and skills are still

relevant and there no threat to 'status'.

C.

Yes, because highlighting cooperation provides an opportunity for the

Applications Manager to learn and develop.

D.

Yes, because praising people publicly helps to improve a person's

informal importance in the organization.

Buy Now
Questions 37

To ensure that the UniCo change programme is successful, the Chief Executive Officer (CEO) knows that correctly assigning the key change roles will be essential.

Which 2 Sales Team Leaders (TL) are likely to be the line leaders MOST engaged in implementing change, based on the actions that have occurred to date?

Options:

A.

The Sales Reporting TL, who has been allowed to see the confidential figures used to justify the Selco acquisition.

B.

The Large Systems TL, who, due to their area’s complexity, is scheduled to become involved later in the programme.

C.

The Finance Systems TL, who sent a team member to replace them in early meetings of the change programme.

D.

The South Region TL, who has continued to advocate that sales of Large Systems remain UniCo’s priority.

E.

The North Region TL, who has raised concerns about the change approach and whose feedback has been applied.

Buy Now
Questions 38

Which 2 actions demonstrate transparency?

Options:

A.

Ensure everyone is treated fairly by providing the same information, in the same format, to everyone impacted by this change.

B.

Send daily emails to everyone to remind them how important this change is and why they should support it.

C.

Distribute the key milestones and target dates for including Selco’s mobile technology and approaches into the UniCo operations.

D.

Ask Corporate Services to provide guidelines to ensure all written communications are easy to read and navigate.

E.

Publish how staff members can raise complaints and suggestions, formally and anonymously if needed.

Buy Now
Questions 39

Answer the following question about the agile change practices that are being

used by the Change Manager.

Column 1 lists statements made by the change team. For each statement in

Column 1, select from Column 2 the relevant agile change practice being

used.

Each selection from Column 2 can be used once, more than once or not at all.

Column 1

      A new company logo, which

maintains features of the

existing UniCo logo, but also

represents expertise in

innovative solutions and mobile

applications, is needed as a

high priority for the rebranding

of UniCo.

      Next time we work with the

Sales Team we will need to

schedule the fast-track training

of the Sales staff more carefully

as taking a member of staff

away from the sales work

caused operational issues.

3. Gaining access rights to make

amendments to UniCo's new

finance system is currently

causing issues and holding up

the updates to enable the

system to work with the new

processes.

    The company procedures for

delivering large-scale computer

systems will need to be revised

to reflect the new processes for

mobile applications, taking an

estimated 60 days of effort.

AgilePM-Practitioner Question 39

AgilePM-Practitioner Question 39

Options:

Buy Now
Questions 40

The Change Manager is discussing the relocation of the Selco staff to the UniCo office with the Operations Director. They are using the SCARF framework of people's social experience to guide management actions. Answer the following questions about the use of David Rock’s SCARF framework to increase the motivation for change.

One aim of the relocation is to develop a less hierarchical culture. The relocation team hear that staff believe managers are still getting special treatment in the allocation of desks. To mitigate this concern, they have planned for groups to move separately over a few weeks and have communicated details with each group independently.

Is this an appropriate approach to reward the brain in the need for ‘fairness,’ and why?

Options:

A.

No, because ‘fairness’ relies on providing appropriate access to all relevant change information.

B.

No, because ‘fairness’ should be based on establishing equality across all staff.

C.

Yes, because small change steps will focus staff on changes that relate only to them.

D.

Yes, because frequent communications will help discourage emotional responses.

Buy Now
Exam Name: Agile Project Management (AgilePM) Practitioner Exam
Last Update: Sep 25, 2025
Questions: 134

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99