The fire-resistance of a protected mass timber assembly is equivalent to the fire resistance time of the:

Options:

A.

mass timber itself.

B.

noncombustible protection.

C.

mass timber itself plus the finish rating time of the noncombustible protection.

D.

mass timber itself plus the added contribution time attributable to the noncombustible protection.

Buy Now
Questions 5

Given: A building of Type IV-B construction is designed to be greater than six stories above grade plane.

At least one layer of required noncombustible protection shall be installed on all of the following building elements except _____ on all floor levels more than four levels below active mass timber construction before erecting additional floor levels during construction.

Options:

A.

mezzanines

B.

shafts and vertical exit enclosures

C.

floors as required by IBC Section 602.4

D.

wall and ceilings as required by IBC Section 602.4

Buy Now
Questions 6

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:

A.

30-minutes

B.

45-minutes

C.

1-hour

D.

2-hours

Buy Now
Questions 7

Proprietary nails can be used by referencing which ICC-ES Evaluation Report?

Options:

A.

ESR-1002

B.

ESR-1137

C.

ESR-1539

D.

ESR-1722

Buy Now
Questions 8

When Type X gypsum board is used as noncombustible protection over mass timber on the building ' s exterior walls, which of the following fasteners are permitted?

Options:

A.

Galvanized nails of minimum 12 Gage with a 7/16-inch head of sufficient length to penetrate the mass timber a minimum of 1 in.

B.

Galvanized nails of minimum 16 Gage with a 7/16-inch head of sufficient length to penetrate the mass timber a minimum of 1 in.

C.

Screws which comply with ASTM C 1002 (Type S, Type W, or Type G) of sufficient length to penetrate the mass timber a minimum of 3/4 in.

D.

Screws which comply with ASTM C 1002 (Type S, Type W, or Type G) of sufficient length to penetrate the mass timber a minimum of 7/8 in.

Buy Now
Questions 9

Which of the following best describes circumstances for which a separate inspection by a building official would be required for the fire protection of structural connections in buildings of Type IV-B construction?

Options:

A.

When connections do not integrate full mass timber member bearing on other mass timber elements

B.

When connection fire resistance is provided by a fire resistance rated joint system in accordance with Section 715

C.

When connection fire resistance is provided by wood cover calculated to meet the requirements of Section 2304.10.1

D.

When connections are made without additional noncombustible protection beyond what is required for the connected elements

Buy Now
Questions 10

Refer to the figure by clicking on the EXHIBIT button above.

93-Tall-Mass-Timber-Buildings Question 10

93-Tall-Mass-Timber-Buildings Question 10

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?

Options:

A.

15%

B.

20%

C.

30%

D.

40%

Buy Now
Questions 11

The building owner shall be responsible for each of the following for fire safety during construction except:

Options:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Buy Now
Questions 12

What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?

Options:

A.

1 hour

B.

2 hours

C.

3 hours

D.

4 hours

Buy Now
Questions 13

Given: A special inspector notices on a mass timber building set of drawings a 8 in. x 8 in. solid sawn nominal dimension lumber element.

The design team has recommended the solid sawn member be replaced with an SCL element.

What minimum SCL size would be correct per the International Building Code?

Options:

A.

6-3/4 in. x 6-1/4 in.

B.

7 in. x 7-1/2 in.

C.

6-3/4 in. x 8-1/4 in.

D.

8 in. x 8 in.

Buy Now
Questions 14

The maximum allowable height for a Group I-4 building of Type IV-B construction provided with an automatic sprinkler system in accordance with Section 903.3.1.1 is _____ ft.

Options:

A.

60

B.

120

C.

180

D.

270

Buy Now
Questions 15

What fire-resistance rating is required for Type IV-C exterior and interior bearing walls?

Options:

A.

1 hour

B.

2 hours

C.

3 hours

D.

4 hours

Buy Now
Questions 16

Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be _____ gpm.

Options:

A.

100

B.

200

C.

500

D.

750

Buy Now
Questions 17

Which of the following best describes the required protection for mass timber hoistway enclosure walls in Type IV-C construction?

Options:

A.

Noncombustible protection of at least 40 minutes fire resistance

B.

No requirement, but walls must achieve the required fire-resistance rating

C.

Noncombustible protection of at least 1/2 in. gypsum board or equivalent

D.

fire-retardant-treated-wood sheathing, 1/2-inch gypsum board, or a noncombustible material

Buy Now
Questions 18

Which of the following construction Types permit concealed spaces to be protected by completely filling the concealed space with noncombustible insulation?

Options:

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Buy Now
Questions 19

Calculated mass timber fire resistance can include each of the following except:

Options:

A.

minimum prescriptive dimensions.

B.

calculated fire resistance of the wood.

C.

fire resistance of noncombustible protection.

D.

combination of calculated fire resistance of the wood and noncombustible protection.

Buy Now
Questions 20

All of the following combustible elements may be used in mass timber buildings except:

Options:

A.

2 x 6 solid-sawn studs.

B.

cross-laminated timber (CLT).

C.

parallel-strand lumber (PSL).

D.

dowel-laminated timber (DLT).

Buy Now
Questions 21

Are mass timber elements permitted to serve as a fire barrier to an adjacent occupancy if they are separated from the interior of the building with an approved thermal barrier consisting of a minimum of 1/2 in. gypsum board or a noncombustible equivalent?

Options:

A.

No

B.

Yes, for Type IV-B only

C.

Yes, for Type IV-HT

D.

Yes for Type IV-B and IV-C

Buy Now
Questions 22

For a sprinklered Business Occupancy (Group B) in a 15-story building of Type IV-A construction, the maximum allowable building area is:

Options:

A.

54,000 sq. ft.

B.

648,000 sq. ft.

C.

972,000 sq. ft.

D.

unlimited.

Buy Now
Questions 23

In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:

Options:

A.

mineral wool.

B.

one-half-inch gypsum board.

C.

7/16-inch wood structural panels.

D.

mass timber complying with IBC Section 2304.11.

Buy Now
Questions 24

Concealed spaces in a Type IV-C building must be protected with:

Options:

A.

sprinklers per NFPA 13.

B.

a lining of fire-retardant-treated wood.

C.

the same protection as used for interior spaces in a Type IV-C.

D.

noncombustible materials with at least 40 minutes of assigned protection time.