4A0-265 Nokia Optical Diagnostics and Troubleshooting Questions and Answers

Questions 4

Suppose a channel-related alarm is reported on an 1830 PSS node, and is related to a possible Wave Keys clock source issue. What is the recommended order for the following troubleshooting steps?

Options:

A.

1. Retrieve the channel power trace.

2. Determine the active clock reference source.

3. Switch to alternate clock source (PF).

4. Replace the suspect PF.

B.

1. Retrieve the channel power trace.

2. Replace the suspect PF.

3. Determine the active clock reference source.

4. Switch to alternate clock source (PF).

C.

1. Determine the active clock reference source.

2. Replace the suspect PF.

3. Retrieve the channel power trace.

4. Switch to alternate clock source (PF).

D.

1. Replace the suspect PF.

2. Retrieve the channel power trace.

3. Switch to alternate clock source (PF).

4. Determine the active clock reference source.

Buy Now
Questions 5

Which of the following commands is used to retrieve the total output power level?

Options:

A.

show interface am2125a 1/6/lineout

B.

show interface am2125a 1/6/lineout detail

C.

show interface am212 5a 1/6/lineout pm

D.

show interface am2125a 1/6/lineout wavekey

Buy Now
Questions 6

Consider the exhibit.

Which type of loopback is applied?

Options:

A.

Client port facility loopback

B.

Client port terminal Ioopback

C.

Line port facility Ioopback

D.

Line port terminal Ioopback

Buy Now
Questions 7

What is the default severity level for a Threshold Crossing Alert (TCA) alarm?

Options:

A.

Critical

B.

Major

C.

Minor

D.

Warning

Buy Now
Questions 8

Refer to the exhibit, which shows a conditions list from the 1830 PSS GUI. (i) What is the total number of alarms reported? (ii) How many service affecting alarms are displayed? (iii) How many conditions are displayed?

Options:

A.

(I) total number of alarms = 5

(ii) number of serviceaffectingalarms = 2

(Hi) number of conditions = 14

B.

(i) total number of alarms = 7

(ii) number of service affecting alarms = 5

(Hi) number of conditions = 7

C.

(i) total number of alarms = 2

(ii) number of service affecting alarms = 2

(Hi) number of conditions = 18

D.

(i) total number of alarms = 4

(ii) number of service affecting alarms = 14

(iii) number of conditions = 2

Buy Now
Questions 9

Consider the exhibit which shows an EPT Power Management Report referring to an ingress amplifier. What is the available output optical power range?

Options:

A.

-0.6 to 1.72 dB

B.

-0.02 to 1.14 dB

C.

0.56 to 1.14 dB

D.

0.56 to 1.72 dB

Buy Now
Questions 10

Which of the following statements about 1-Day PMs is TRUE?

Options:

A.

1-Day PMs show measurements collected over the preceding 24 hours. Up to 8 bins are available for data storing.

B.

1-Day PMs show measurements collected since the beginning of the current day. Up to 8 bins are available for data storing.

C.

1-Day PMs show measurements collected over the preceding 24 hours. Up to 33 bins are available for data storing.

D.

1-Day PMs show measurements collected since the beginning of the current day. Up to 33 bins are available for data storing.

Buy Now
Questions 11

Which of the following statements best describes the payload type setting?

Options:

A.

Payload type attribute is recorded within the client payload and must be entered manually.

B.

Payload type attribute Is recorded within the client payload and can be set automatically.

C.

Payload type attribute is recorded within the OTN overhead and must be entered manually.

D.

Payload type attribute is recorded within the OTN overhead and can be set automatically or manually.

Buy Now
Questions 12

Consider the exhibit. A single directional fiber cut is occurring between two amplifiers in bidirectional configuration. Which node(s) will report a "LD Input LOS" alarm?

Options:

A.

Node A only

B.

Node B only

C.

Node C only

D.

Node A and Node B

Buy Now
Exam Code: 4A0-265
Exam Name: Nokia Optical Diagnostics and Troubleshooting
Last Update: May 19, 2024
Questions: 40

PDF + Testing Engine

$130

Testing Engine

$95

PDF (Q&A)

$80