1z0-1075-22 Oracle Manufacturing Cloud 2022 Implementation Professional Questions and Answers

Questions 4

Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.

Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.

Options:

A.

Work Order Status GET method

B.

Work Orders GET method

C.

Work Order Status POST method

D.

Work Orders PATCH method

E.

Resource transaction POST method

F.

Resource transaction GET method

Buy Now
Questions 5

In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using thestandard costing method. The work definition and resource rates of the assembly have been defined as required.

A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.

Identify the reason.

Options:

A.

Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.

B.

Costs for purchase components P1and P2 are not defined in cost accounting.

C.

Create Accounting was not initiated.

D.

Create Accounting Distributions was not initiated.

Buy Now
Questions 6

To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.

Identify the action that meets this requirement.

Options:

A.

Change the Supply Type = Push in Itemdefinition and Work Definition, for subassemblies having high inventory stock.

B.

Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.

C.

Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.

D.

Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.

Buy Now
Questions 7

Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must be completed and verified in the Work Definition area?

Options:

A.

Ensure the predefined work definition name ORA_MAIN name is active.

B.

Select a resource that is to be used inautomatic work definition by enabling the attribute Default for automatic work definition.

C.

Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.

D.

Ensure the item isa standard item with a secondary item structure.

E.

Ensure there is only one default standard operation at a given point in time.

Buy Now
Questions 8

Identify three requirements fulfilled by nonstandard work orders.

Options:

A.

Rescheduling

B.

Repair

C.

Rework

D.

Prototype

Buy Now
Questions 9

In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.

Identify two tasks that the Dispatch List allows the production users to perform.

Options:

A.

Report Component Returns

B.

Report Resource Transactions

C.

Report Receipts

D.

Report Material Transactions by Quantity and Serial Number

E.

Report Cost Transactions

Buy Now
Exam Code: 1z0-1075-22
Exam Name: Oracle Manufacturing Cloud 2022 Implementation Professional
Last Update: May 30, 2023
Questions: 66

PDF + Testing Engine

$140

Testing Engine

$105

PDF (Q&A)

$90